About Vaultix
An open reference for estimators.
Vaultix is a public, first-principles construction estimating library and calculation suite for Australian civil and infrastructure work, built Queensland first.
What it is for
Estimators price work from how it is built: the quantity, the method, the plant and crew, and the productivity that turns them into time and cost. Vaultix sets those pieces out in the open, with the source and date of every figure, so a rate can be read, checked and challenged line by line.
How it is built
Visitors get a library: pages to browse, read and use. Behind it sits one governed store that keeps every figure sourced and dated, so the library stays accurate and can grow. Pages, calculators and downloads are generated from that store.
Where it is going
Australia is built first, starting in Queensland. New countries are added as data, not new code: New Zealand, the United Kingdom, the United States and Europe are on the roadmap.
Trinity (TX1)
First-principles civil and structural estimating, cost modelling and project pricing software. Vaultix build-ups are designed to open in Trinity for full tender assembly.
tx1.synthetik.au →Spark and Tex
Spark for 2D and 3D quantity take-off, and Tex for drawing mark-up and redlines.
Cenex
An independent civil estimating, engineering advisory and commercial cost consultancy practice.
cenex.au →Free to read on the web.
The library pages and browser calculators are planned as a free web tier. A paid data and API tier for machine-readable exports is planned for later.
Measure it in Spark. Price it in Trinity.
Take quantities off the PDF drawings in Spark, then build every rate from labour, plant, materials and productivity in Trinity, with sell rates, cashflow and carbon from the same lines.