Civil construction work packages by sector
24 sectors, 128 work packages.
Select a discipline for its work packages, production reference bands and inspection records. Each note says what to keep separate when you measure and price it.
Earthworks and bulk civil
4 work typesDistinguish bank, loose and compacted volume. Measure haul and rehandling where the site balance requires them.
Roads and pavements
7 work typesUse the road lot worksheet for route-dependent crew time, release waits and direct cost.
Bridges and structures
8 work typesKeep fabricated unit supply, erection possessions and temporary supports distinct.
Foundations and piling
9 work typesSeparate installed length, socket or treatment extras, testing and rig mobilisation.
Tunnels and underground works
10 work typesSplit drive advance, ring or support time, shaft logistics, interventions and fit-out by reach.
Marine and ports
6 work typesSeparate floating plant standby, tidal windows, tow and positioning, disposal and accepted in-situ volume.
Gas pipelines and crossings
5 work typesKeep mainline spread metres, individual welds, crossings and test sections on separate bases.
Rail and track systems
4 work typesPossession time, setup and handback can govern productive hours for every trade.
Airfields and airports
4 work typesAllow separately for short closures, lighting tests and inspection before reopening.
Substations
3 work typesTrack transformer moves, bay items, cable terminations and testing windows independently.
Transmission lines
3 work typesKeep route-km and conductor-km distinct. Track crossings, drum changes and possession limits.
Buildings and electrical services
9 work typesShared hoists, crane time, access and floor-cycle releases affect several trades together.
Water and wastewater
3 work typesSeparate pipe lengths by diameter and depth, connections, bypasses and commissioning attendances.
Traffic management and road furniture
4 work typesTrack device hire by occupied shift and installation by run or asset.
Drainage and stormwater
3 work typesInclude pits, headwalls, dewatering, filter media and reinstatement separately from pipe length.
Geotechnical and ground improvement
19 work typesTrack rig setup, installed depth, material consumption, verification tests and monitoring separately.
Dams, levees and water-retaining works
4 work typesDistinguish material zones, filters, treatment quantities and monitoring through first fill.
Underground mining
4 work typesModel tramming distances, tip availability and service moves separately from heading advance.
Mining conveyor systems
1 work typeMeasure structure tonnage, installed conveyor length, splices and commissioning separately.
Oil and process facilities
4 work typesSeparate civil quantities, mechanical setting, pipe fabrication, tie-ins and testing attendance.
Surface mining and rehabilitation
2 work typesTrack dispatched tonnes and surveyed bank volumes on comparable time and density bases.
Battery energy storage
4 work typesTrack enclosure, converter and circuit quantities separately from site-wide commissioning.
Utility-scale solar
4 work typesUse accepted piles, rows, modules and tested strings as distinct progress quantities.
Onshore wind
4 work typesSeparate pad construction, crane relocation, component lifts, weather standby and grid release.
Work package content is in review before publication.
Routes through a job, lot by lot.
Roads and marine work are also set out as lot programmes: an ordered route of work packages with their dependencies, so crew time and release waits sit in sequence.
Road lot programme
- New urban asphalt road
- New rural sprayed-seal road
- New rigid concrete pavement
- Mill, patch and asphalt overlay
- Rehabilitation with in-situ stabilisation
Marine lot programme
- Open piled wharf · driven steel piles
- Open piled wharf · bored piles and sockets
- Anchored quay wall and berth deepening
- Maintenance dredging · hopper cycle
- Cutter suction dredging and reclamation
- Local scour repair · mattresses
Follow a whole job, lot by lot.
Two programmes walk a real sequence from mobilisation to handover, with the crew time, release waits and checks on each lot.
Road programme
Formation, pavement layers, seal and asphalt, drainage and tie-ins: 28 road lots.
Open the road programmeMarine programme
Floating plant, dredging, marine piling, wharf deck and scour acceptance: 32 marine lots.
Open the marine programmeIllustrated library
The same workfronts as drawings: what each machine does and where it stands.
Open the illustrated libraryMeasure it in Spark. Price it in Trinity.
Take quantities off the PDF drawings in Spark, then build every rate from labour, plant, materials and productivity in Trinity, with sell rates, cashflow and carbon from the same lines.