Specialist productivity calculators

Construction productivity calculators

Cycle time first. Output second.

Each calculator builds output from an observed or planned cycle for one batch, so the assumptions that drive the number stay visible and editable.

Cycle calculators · 13 in draft

One batch, one cycle, one sector.

Marine and ports

Wharf piling from a floating work platform

One typical pile as the batch; long or spliced piles separated by location.

Buildings

Repeat-floor table formwork

Contact area per table or repeated table group; models the form-moving crew only.

Tunnels

Segmentally lined EPB tunnel drive

Actual ring width as the batch quantity for the selected sequential cycle.

Roads

Continuous asphalt paving train

A truckload or measured tonnage block; accepted area converted to tonnes.

Bridges

Precast girder erection by launching gantry

One girder per batch, with span-specific advance time shared across girders.

Solar

Tracker foundation pile installation

One post per batch, with an observed cycle for its soil zone.

Wind

Wind turbine tower-section erection

A section class of comparable geometry, with workable hours entered once.

Substations

Transformer transfer and set on plinth

One transformer per batch against the specialist installation schedule.

Transmission

Overhead conductor stringing section

Installed conductor-km for one pull as the batch quantity.

Surface mining

Shovel and rigid-truck load and haul

One observed payload as the batch, with shovel-caused queueing kept visible.

Underground mining

Load–haul–dump mucking to an ore pass

Measured tonnes per bucket, allowing for fill and material density.

Gas

Cross-country pipeline lowering and placement

Released string length against the occupation time of the whole spread.

Oil and process

Process equipment skid placement and alignment

Repeat packages of comparable geometry grouped; unique packages built separately.

Specified next

Parametric quantity and rate tools.

The same formula everywhere; the local standards, bar sizes and rates are data. Each is planned with worked examples and a spreadsheet download.

Planned

Concrete

Volumes, wastage and placement.

Planned

Formwork

Contact area and reuse.

Planned

Reinforcement

Bar mass, laps and schedules.

Planned

Wet-weather days

By location, roster and duration, Queensland first.

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build every rate from labour, plant, materials and productivity in Trinity, with sell rates, cashflow and carbon from the same lines.