Civil estimating library
Shelves you read first and calculate from second.
Each section is a shelf of pages. Every page shows where its figures came from and how far to trust them.
Plant
One page per machine class: what it is, specifications, transport, productivity by activity and an output calculator. 25 guides.
Methods
Construction methods step by step: sequence, crew, plant, temporary works, hold points and the productivity basis. 16 guides.
Temporary works
Formwork, falsework, scaffold, shoring, cofferdams, gantries and hoists as references in their own right. 15 guides, plus a temporary works hub.
Sectors
24 disciplines with 128 work packages: method, measurement, survey check and release evidence for each.
Calculators
13 productivity cycle calculators in draft. Concrete, formwork and reinforcement quantity calculators are specified next.
Labour
How a wage becomes a cost per hour: award, allowances, overtime, leave and on-costs, with a base rate calculator. Queensland first.
Rates
First-principles rates you can open and check line by line: labour, plant, materials and productivity behind every number.
Programming
Durations from quantity and productivity, typical logic for common jobs, and how weather and calendars change them.
Weather
Type a location, roster and duration and get wet-weather days by rainfall band. Queensland first, using Atmosphr climate data.
Materials
Reo, concrete, formwork, aggregates and pipe: specifications, wastage, mass and volume tables, and the calculators that use them.
Guides
How to estimate: classes of estimate, contingency, escalation and margin, written plainly.
The machines on the first shelf.
Each guide covers what the machine is, how it moves to site, what it produces by activity, and where those figures came from.
- 12-tonne padfoot roller
- 12-tonne smooth drum roller
- 13 kL water cart
- 150 t all-terrain crane
- 16-tonne motor grader
- Soil stabiliser and cold recycler
- 20 t crawler dozer
- 20-tonne hydraulic excavator
- 20-tonne multi-tyre roller
- 25-tonne pick-and-carry crane (Franna)
- 3 m³ wheel loader
- 30-tonne articulated dump truck
- 400 t crawler crane
- 42 m concrete boom pump
- 5-tonne mini excavator
- 7 to 9 t backhoe loader
- Road profiler (cold milling machine)
- Horizontal directional drilling rig
- Piling rig (rotary bored / CFA)
- Sewer microtunnelling TBM
- Skid steer loader
- Soil nail drilling rig
- Tracked asphalt paver
- Trailer concrete line pump
- Truck and quad-axle dog
Construction methods
- Asphalt paving
- Bored piling
- Bridge piers and abutments
- Bulk earthworks
- Cement and lime stabilisation
- Culvert installation
- Kerb, channel and drainage pits
- Mechanically stabilised earth walls
- Pipe jacking and microtunnelling
- Precast girder bridge decks
- Rigid concrete pavement
- Road rehabilitation and reconstruction
- Rock excavation
- Traffic management and staging
- Trenching and pipelaying
- Utility relocation and protection
Temporary works
- Cofferdams
- Crash decks, screens and hoarding
- Dewatering
- Falsework and propping
- Formwork systems
- Jump forms and climbing formwork
- Launching gantries and form travellers
- Scaffold systems
- Sheet pile and soldier pile walls
- Shotcrete
- Temporary bridges and crossings
- Temporary hoists and crane bases
- Temporary walkways and access platforms
- Trench shoring and shoring boxes
- Working platforms and temporary roads
Prefer pictures? The illustrated library follows each workfront step by step. For whole programmes, see the road programme and the marine programme.
Measure it in Spark. Price it in Trinity.
Take quantities off the PDF drawings in Spark, then build every rate from labour, plant, materials and productivity in Trinity, with sell rates, cashflow and carbon from the same lines.