Home / Software
The software behind Vaultix

Construction takeoff and estimating software

Measure in Spark. Price in Trinity. Built in Australia by Synthetik.

Vaultix explains how civil work is built and what it produces. Spark and Trinity turn that into a measured, priced tender, using the same first-principles logic from the drawing to the sell rate.

Spark · PDF takeoff and markup

From drawing to quantities, in one take.

Spark is construction PDF software for estimators, engineers and contractors. Calibrate the scale once, then measure areas, lengths, perimeters and counts across the drawing set. Every measurement is listed, labelled and ready to price.

  • Measure: area, distance, perimeter, path length and count on calibrated sheets
  • Check: compare revisions and search the whole drawing set with OCR
  • Mark up: comments, clouds and stamps on the same sheet as the quantities
  • Hand on: quantities go into a workbook and on to Trinity for pricing
Spark measuring floor areas, a wall length and downlight counts on a calibrated plan
Spark · areas, lengths and counts on a calibrated plan
Trinity · first-principles estimating

Price it from first principles.

Trinity is estimating software for Windows, built in Australia for estimators, quantity surveyors and contractors. Each rate is built from labour, plant, materials and productivity, so every number in the tender can be opened and checked.

  • Build up: direct costs, resources and parametric build-ups with a live formula engine
  • Submit: overheads, sell rates and PDF reports from the same priced lines
  • Plan: cashflow straight from the estimate
  • Report carbon: Scope 1, 2 and 3 embodied carbon against every item
Trinity direct costs for a road upgrade: granular pavement, asphalt wearing course, concrete kerb and line marking
Trinity · direct costs for a road upgrade
One estimate, every view

From the build-up to the bank balance.

The priced lines in Trinity feed cashflow and carbon directly, so nothing is re-keyed.

Trinity cashflow view generated from the priced estimate
Trinity · cashflow from the estimate
Trinity embodied carbon view by scope
Trinity · embodied carbon by scope
How they fit together

Reference, measure, price.

01 · Reference

Vaultix

Method, plant and crew, and the productivity band with its source. Free on the web.

02 · Measure

Spark

Quantities measured straight off the PDF drawings, labelled by item.

03 · Price

Trinity

First-principles build-ups, sell rates, cashflow and carbon from the same lines.