Plant / 28 to 32 t payload articulated dump truck

30-Tonne Articulated Dump Truck

The versatile 6x6 bulk earthworks hauler for rough terrain, steep haul roads, and high-production cut-to-fill civil projects.

30-Tonne Articulated Dump Truck
  1. Dump bodySet payload against the material density and the truck limit.
  2. Articulation jointTurning and spotting time form part of the haul cycle.
  3. TyresHaul-road condition affects travel speed and tyre wear.
Illustrative Vaultix machine configuration. Consult the selected model’s data for dimensions and capacities.
Rated payload
28,000kg
Heaped capacity
17.5m³
Net power
274kW
Direct wet cost
Not quoted yet
Hire rates need dated supplier quotes →

AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.

General class information

Choosing this class of articulated dump truck

A 30 t class articulated dump truck (nominal 28.0 t payload, 17.5 m³ heaped capacity) is the industry benchmark high-production earthmoving hauler for civil infrastructure, road construction, bulk cut-to-fill balancing, and quarry operations. Featuring 6x6 all-wheel drive, center-pivot oscillation, automatic traction control, and high ground clearance, it traverses rough haul routes and saturated ground where highway tippers cannot operate. Productivity is modeled from payload capacity, cycle time (load, haul, dump, return), and job operating efficiency.

The versatile 6x6 bulk earthworks hauler for rough terrain, steep haul roads, and high-production cut-to-fill civil projects.

28 to 32 t payload class / 28.0 t rated payload / 17.5 m³ body / 6x6 Articulated hauler / Civil estimating guide

  • Bulk earthworks cut-to-fill balancing across major highway corridors, rail formations, and civil subdivisions
  • Hauling overburden, ripped rock, and common fill across soft, undulating, or uncompacted subgrade terrain
  • Transporting blasted shot-rock, ripped sandstone, and aggregate in quarry and borrow-pit operations
  • Wet-weather haulage where 6x6 drive and high flotation tyres maintain site trafficability when highway tippers cannot run
  • Spoil haulage to designated environmental mounds, tipheads, and site containment stockpiles
  • Dam wall construction, clay liner placement, and tailings facility earthmoving
  • Industrial site development, pad levelling, and large-footprint bulk earthmoving

Class planning guide

Published manufacturer specifications for the Cat 730 / 28-32 t payload class articulated dump truck. Use supplier specifications for exact procurement.

Class planning values
RefItemValuePlanning note
01.01Rated payload28,000 kg (28.0 t)Cat 730 nominal payload rating (31.0 US tons). OEM Form AEXQ2714-03 p. 2, 3.
01.02Body capacity (heaped SAE 2:1)17.5 m³ (23.0 yd³)Standard rock/earth body heaped volume; 18.8 m³ with tailgate (derived). OEM Form AEXQ2714-03 p. 2.
01.03Operating mass (empty)23,900 kgIncludes standard tyres, full lubricants, coolant, fuel, and operator. OEM Form AEXQ2714-03 p. 3.
01.04Gross machine weight (loaded)51,900 kg (derived)Derived: 23,900 kg tare + 28,000 kg payload = 51,900 kg GMW. OEM Form AEXQ2714-03 p. 3.
01.05Engine power (net ISO 14396)276 kW (370 hp)Cat C13 twin-turbocharged inline 6-cylinder diesel at 1,800 rpm. OEM Form AEXQ2714-03 p. 2.
01.06Maximum travel speed55 km/hHDPS 6 forward gears; working speeds typically 15 to 35 km/h. OEM Form AEXQ2714-03 p. 2.
01.07Fuel burn allowance16.6 L/hr (medium duty)OEM telematics benchmark (Wheeler Cat CPH); low 12.8, high 20.4 L/hr. CPH Form VST p. 1-2.
01.08Shipping mass (bare tare)About 23,450 kg (derived)Derived: operating mass less 412 L fuel and operator. Confirm with haulier. OEM Form AEXQ2714-03 p. 2, 3.
Choosing the machine
RefItemValuePlanning note
02.01Bulk cut-to-fill28 t payload & 17.5 m³ bodyMatched to 30-36 t excavators (3-4 bucket passes) for maximum cycle efficiency.
02.02Rough terrain & mud6x6 drive & automatic tractionContinuous all-wheel drive and inter-axle lock conquer slippery wet weather haul roads.
02.03Steep haul roads35% gradeability & engine retarderHigh climbing torque and automatic compression retarding on loaded descents.
02.04Stockpile & tiphead70° dump tip angleFast 12-second body hoist and steep tip angle ensure clean discharge in sticky cohesive clays.
02.05Float transportOSOM 3-row / 4-row low loaderMachine travel width 2.95 m and height 3.51 m (approx. 4.41 m loaded on 900 mm drop-deck).

Dimensions and transport planning

Machine dimensions exclude the transport float trailer. Obtain verified deck height, loaded envelope, axle group weights, route clearance and restraint plans from haulier before mobilisation.

Machine only, excludes trailer (Cat 730 reference)
CodeDimensionPublished valuePlanning note
1Body Height – Fully Tipped6,468 mmDump body raised to maximum 70° tipping angle. OEM Form AEXQ2714-03 p. 4.
2Load Over Height2,916 mmTop rail height of body for loading tool clearance. OEM Form AEXQ2714-03 p. 4.
3Ground Clearance – Body Fully Tipped563 mmDischarge chute clearance at full dump. OEM Form AEXQ2714-03 p. 4.
4Body Length5,783 mmOverall dump body external length. OEM Form AEXQ2714-03 p. 4.
5Body Length Inside5,411 mmInternal cargo body length. OEM Form AEXQ2714-03 p. 4.
6Ground Clearance545 mmDriveline ground clearance under front axle. OEM Form AEXQ2714-03 p. 4.
7Rear Axle Center to Body Rear1,556 mmRear chassis overhang. OEM Form AEXQ2714-03 p. 4.
8Mid Axle Center to Rear Axle Center1,700 mmTrailer bogie axle spacing. OEM Form AEXQ2714-03 p. 4.
9Mid Axle Center to Front Axle Center3,979 mmPrimary tractor-to-bogie wheelbase. OEM Form AEXQ2714-03 p. 4.
10Front Axle Center to Machine Front3,210 mmFront tractor overhang. OEM Form AEXQ2714-03 p. 4.
11Overall Length (Standard Body)10,445 mmOverall front bumper to body chute length. OEM Form AEXQ2714-03 p. 4.
12Overall Length with Tailgate10,593 mmOverall length with optional scissor tailgate. OEM Form AEXQ2714-03 p. 4.
13Height in Transport Position (Top of Cab)3,508 mmShipping height to top of ROPS cab. OEM Form AEXQ2714-03 p. 4.
14Overall Width (Extended Mirrors)3,676 mmWidth across mirrors; folded for transport. OEM Form AEXQ2714-03 p. 4.
15Width Over Tailgate2,984 mmMaximum body width with tailgate fitted. OEM Form AEXQ2714-03 p. 4.
16Body Width2,902 mmExternal body width across canopy guard. OEM Form AEXQ2714-03 p. 4.
17Track Width2,275 mmTransverse track gauge centre-to-centre. OEM Form AEXQ2714-03 p. 4.
18Width Over Tyres (Standard 23.5R25)2,877 mmWidth across standard 23.5R25 tyres. OEM Form AEXQ2714-03 p. 4.
19Width Over Fenders2,950 mmOverall travel width across rubber fenders. OEM Form AEXQ2714-03 p. 4.
20Max Laden Width Over Tyre Bulge2,950 mmMaximum loaded transport envelope across tyre bulge. OEM Form AEXQ2714-03 p. 4.

Working range & capacities

Volumetric capacities, dump geometry, and climbing gradeability for the Cat 730 articulated dump truck. Allow for material bulk density, swell factors, and haul road rolling resistance.

Geometric planning limits and capacities
CodeKinematic range itemPublished valuePlanning note
1Rated Payload28,000 kg (28.0 t / 31.0 US tons)Design nominal payload limit. Cat Production Measurement (CPM) telematics provides real-time payload monitoring with external indicator lights.
2Body Volume (Struck)13.3 m³ (17.4 yd³)Water-level struck capacity level with top of body side plates.
3Body Volume (Heaped SAE 2:1)17.5 m³ (23.0 yd³)Standard heaped body capacity for loose civil earthworks and quarry materials.
4Body Volume with Scissor Tailgate18.8 m³ (24.6 yd³)Derived heaped volume with mechanical tailgate preventing spillage on adverse grades (10-15%).
5Dump Tipping Angle70 degreesSteep 70° tipping angle powered by dual inverted hydraulic hoist cylinders ensures clean material discharge in cohesive clay and sticky fill.
6Maximum GradeabilityUp to 35% (1:2.8)Mechanical climbing capability in Gear 1 with 6x6 drive engaged; typical continuous civil haul road design grade limit is 10% to 15%.
Cost planning

Direct cost and market hire prices

Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 28-32 t payload articulated dump truck class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.

Metro and Remote direct costs

Location comparison (AUD ex GST)
Basis / AUD ex GSTMetroRemote
Direct dry / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Direct wet / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Articulated dump truck operator / paid site hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Delivered diesel / L1.94 (reference proxy)2.23 (reference proxy)
Maintenance, parts and freightBase allowanceBase plus 25%
Roster and campMetro working-week roster14/7 FIFO, 12-hour days, camp and flights

Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.

Mobilisation, separate one-off cost

Excluded from hourly costs
Purchased transport / AUD ex GSTMetroRemote
One delivery eventTo be quoted by haulierTo be quoted by haulier

Float mobilisation depends on transport distance, route permits, Class 1 OSOM dimensions (2.95 m travel width, 4.41 m loaded height on 900 mm drop-deck) and float deck availability. Allow separate return demobilisation event.

Published hire tariffs: market prices including supplier margin. AUD ex GST.
Source / dateHire basisPer hourPer dayPer weekConditions
Awaiting supplier tender verification
Status: Unquoted placeholder
Dry / Wet pending quotes Not yet quoted Not yet quoted Not yet quoted All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including scissor tailgate options, body liner wear allowances, fuel inclusion, wear terms and float costs.

First-principles direct hourly cost

Cost schedule / AUD ex GST
ComponentDirect dry AUD/hrDirect wet AUD/hr
Ownership: depreciation and interestNot yet quotedNot yet quoted
Insurance and registrationNot yet quotedNot yet quoted
Maintenance, servicing, tyres and GETNot yet quotedNot yet quoted
Fuel and operating lubricants (16.6 L/hr proxy)0.00Not yet quoted
Articulated dump truck operator cost per paid site hour0.00Not yet quoted
Direct cost per operating hourNot yet quotedNot yet quoted

Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.

Vaultix planning estimates

Productivity and calculator

Hourly Production (t/hr) = Payload (t) × Trips per Hour. Trips per Hour = (60 min/hr / Total Cycle Time min) × Efficiency Factor. Total Cycle Time = Load Time + Haul Time + Dump Time + Return Time. Volumetric Output (m³/hr) = Hourly Production (t/hr) / Material Bulk Density (t/m³). All cycle times and efficiency allowances are Vaultix estimating assumptions.

Instrument / 01

Production scenario

t/hr

Scenario inputs

Hourly cost defaults to placeholder ($0.00). Enter your project-quoted wet hire or direct cost to calculate unit cost per tonne. All results are estimates.

Activity estimating guides

Vaultix civil estimating standard, 11 November 2026. Joint planning scenarios based on Caterpillar 730 cycle times.

Low: payload × 0.90, cycle time × 1.20, efficiency × 0.85. High: payload × 1.02, cycle time × 0.85, efficiency × 1.10.

01Bulk earthworks haulage

Large-scale civil earthworks haulage between major mass-haul excavation areas and bulk fill embankments across road corridors, industrial subdivisions, and airport platforms.

Vaultix assumptions: Payload 27.5 t; cycle 8.5 min (load 1.5 min, haul 3.8 min, dump 0.8 min, return 2.4 min); efficiency 75%.

Worked example: 27.5 t × (60 / 8.5 min × 0.75) = 145.6 t/hr, or 1,165 t in an 8-hour shift (~648 BCM at 1.8 t/BCM bulk density).

Allow for: 1.5 min 4-pass loading by 35 t excavator, loaded haul at 24 km/h (900 m), 0.8 min dump/turn, empty return at 32 km/h, and water cart coordination.

Pitfalls: Haul road rutting and excessive dust significantly increase rolling resistance, reducing travel speed and increasing fuel burn.

02Cut to fill

On-alignment roadbed and earthmoving cut-to-fill balancing, transporting excavated subgrade clays, ripped sandstone, and weathered rock directly to adjacent fill structural layers.

Vaultix assumptions: Payload 27.0 t; cycle 6.2 min (load 1.4 min, haul 2.2 min, dump 0.7 min, return 1.9 min); efficiency 78%.

Worked example: 27.0 t × (60 / 6.2 min × 0.78) = 203.8 t/hr, or 1,630 t in an 8-hour shift.

Allow for: Fast turnaround cycle (500 m haul), formation corridor traffic management, dozer push spreading at tiphead, and edge safety berms.

Pitfalls: Congestion at narrow cut sections or fill transitions creates spot delays and excavator queueing.

03Haul road use

Medium to long-distance haulage along established, graded haul corridors connecting regional borrow pits, remote dams, or civil bypass alignments to construction work zones.

Vaultix assumptions: Payload 28.0 t; cycle 13.5 min (load 1.5 min, haul 6.0 min, dump 0.8 min, return 5.2 min); efficiency 75%.

Worked example: 28.0 t × (60 / 13.5 min × 0.75) = 93.3 t/hr, or 747 t in an 8-hour shift.

Allow for: Sustained travel in Gear 4-5 (30-45 km/h over 2,000 m haul) on well-maintained unsealed roads, positive UHF radio protocols, and dust suppression watering.

Pitfalls: Poorly maintained haul roads with potholes or severe washboarding accelerate tire wear and cause suspension damage.

04Spoil to stockpile

Transporting unsuitable organic topsoil, contaminated spoil, or excess cut material from active excavations to permanent off-line spoil mounds or environmental stockpiles.

Vaultix assumptions: Payload 26.0 t; cycle 10.2 min (load 1.5 min, haul 4.6 min, dump 0.9 min, return 3.2 min); efficiency 72%.

Worked example: 26.0 t × (60 / 10.2 min × 0.72) = 110.1 t/hr, or 881 t in an 8-hour shift.

Allow for: Adverse gradient climbing up stockpile ramp (8-12% over 1,200 m haul), spotter positioning at tiphead, and tire wash down before site exit.

Pitfalls: Cohesive wet spoil tends to stick in body corners (carryback), reducing net payload capacity if not cleaned regularly.

05Wet-weather haulage

Operating in wet, slippery conditions, saturated soils, and uncompacted mud where high-flotation 6x6 all-wheel drive and central articulation provide trafficability when highway tippers cannot run.

Vaultix assumptions: Payload 24.0 t; cycle 11.5 min (load 1.6 min, haul 5.1 min, dump 0.9 min, return 3.9 min); efficiency 65%.

Worked example: 24.0 t × (60 / 11.5 min × 0.65) = 81.4 t/hr, or 651 t in an 8-hour shift.

Allow for: Intentional payload derating (24 t) to improve flotation over 700 m haul, low-gear operation (Gear 1-3), automatic traction control lock engagement, and continuous grader clearing.

Pitfalls: Deep mud ruts increase driveline strain and fuel burn; driving on slopes exceeding 15% in saturated conditions risks sliding and loss of directional control.

06Quarry haulage

Heavy-duty transport of blasted shot-rock, ripped basalt/granite, and processed quarry gravel from pit excavation faces up steep ramp systems to the primary crushing plant.

Vaultix assumptions: Payload 28.0 t; cycle 10.5 min (load 1.6 min, haul 4.8 min, dump 0.8 min, return 3.3 min); efficiency 80%.

Worked example: 28.0 t × (60 / 10.5 min × 0.80) = 128.0 t/hr, or 1,024 t in an 8-hour shift.

Allow for: Body wear liner protection, 45 t excavator or Cat 966-class loader matching, steep adverse ramp climb (10-12% over 1,400 m haul), and controlled tipping over crusher bin.

Pitfalls: Impact loading of oversized boulders (>1.0 m) can damage body floor and suspension; require excavator to cushion first bucket pass with fine material.

07Dam wall construction

Placement of selected cohesive impermeable clay core and structural rockfill embankments for water storage dams, agricultural reservoirs, and mine tailings containment facilities.

Vaultix assumptions: Payload 26.5 t; cycle 9.6 min (load 1.5 min, haul 4.2 min, dump 0.8 min, return 3.1 min); efficiency 75%.

Worked example: 26.5 t × (60 / 9.6 min × 0.75) = 124.2 t/hr, or 994 t in an 8-hour shift (~552 BCM at 1.8 t/BCM bulk density).

Allow for: 1.5 min 4-pass loading in borrow pit, adverse embankment access ramp climb (8-10% over 1,000 m haul), controlled thin-lift spreading, and compactor coordination.

Pitfalls: Strict soil moisture window required for clay compaction; wet-weather blinding requires scraper/grader strip before continuing fill placement.

Estimator checks

  • Payload matching: Standard rock/earth body provides 17.5 m³ (SAE 2:1 heaped) and 28.0 t rated payload. In cohesive or light materials, fitment of a mechanical scissor tailgate increases volumetric retention to 18.8 m³ and prevents grade spillage.
  • Loading tool matching: Optimize excavator pass matching — typically 3 to 4 bucket passes with a 30 to 36 t excavator (1.6 to 2.0 m³ bucket) or 4 passes with a Cat 966-class wheel loader (3.0 to 3.5 m³ bucket) for 1.4 to 1.8 min load times.
  • Cycle time estimating: Total cycle time = excavator load time + haul travel + dump/manoeuvre + return travel + queue/spot delays. Haul speed depends heavily on rolling resistance (typically 40 to 60 kg/t on unpaved roads) and effective grade.
  • Wet weather flotation: The Cat 730 features all-wheel drive, inter-axle and cross-axle differential locks (automatic traction control), and wide 23.5R25 tyres (or optional 750/65R25) to maintain trafficability in soft mud and cohesive subgrade.
  • Transport & Float permitting: Machine width is 2.95 m (over fenders/tyres) and height is 3.51 m. On a 900 mm drop-deck float, loaded convoy height is approximately 4.41 m, exceeding the 4.30 m general height threshold. OSOM permits, route clearances, and 'OVERSIZE' signage are mandatory.
  • Shipping tare: Base bare shipping mass is derived as approximately 23,450 kg (operating mass 23,900 kg less fuel and operator). Scissor tailgate adds ~450 kg; wide tyres add ~350 kg.
  • Hire rates: In accordance with Vaultix governance, all hire rates remain unquoted placeholders pending verified project tenders. Never invent hire rates.
  • Licensing & WHS: No High Risk Work Licence (HRWL) required under Australian WHS regulations; operators must hold national Unit of Competency RIIMPO337E and project Verification of Competency (VOC).

Data basis. Reference model: Caterpillar 730 Articulated Dump Truck (Aus-NZ / Stage V / Tier 4 Final, Build 04A), OEM technical specification sheet AEXQ2714-03. Fuel consumption based on Cat Performance Handbook VisionLink telematics benchmark (16.6 L/hr medium duty). Sourced 11 November 2026. Hire rates remain unquoted placeholders in accordance with Vaultix estimating governance. Sources and verification documented in files/adt-30t.md.

Notes / 0130 t Articulated Dump Truck / estimating referenceScale NTS Source: Vaultix plant library. Sources and assumptions

Entry / adt-30t   Issue / 2026-11-11