Plant / Highway class tracked asphalt paver

Tracked Asphalt Paver

The quintessential Australian highway-class tracked asphalt paver for motorway carriageways, structural base courses, and airport pavements.

Tracked Asphalt Paver
  1. Receiving hopperCoordinate feed with the truck or transfer vehicle.
  2. TracksAllow for manoeuvring and setting up each paving run.
  3. ScreedWidth and layer thickness determine the paving quantity.
Illustrative Vaultix machine configuration. Consult the selected model’s data for dimensions and capacities.
Standard width
2.55–5.0m
Max throughput
900t/h
Direct wet cost
Not quoted yet
Hire rates need dated supplier quotes →

AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.

General class information

Choosing this class of asphalt paver

A 19 to 22 t highway-class tracked asphalt paver is the production cornerstone of Australian motorway construction, arterial road rehabilitation, airport runways, and heavy civil pavements. Fitted with an AB 500 TV high-compaction extending screed featuring tamper bars and vibration, high-traction crawler tracks with replaceable rubber pads, and proportional conveyor/auger material feed, it places dense-graded asphalt (AC10/AC14), heavy bituminous base courses (AC20/AC28), and stone mastic asphalt up to 300 mm lift thickness. Productivity is modeled per hourly throughput tonnage (t/hr), finished surface area (m²/hr), and linear advance (m/hr) governed by paving width, compacted layer thickness, bulk density (2.40 t/m³), paving travel speed, and delivery logistics continuity.

The quintessential Australian highway-class tracked asphalt paver for motorway carriageways, structural base courses, and airport pavements.

19-22 t class / 2.55 – 5.0 m screed / Tracked undercarriage / Civil estimating guide

  • Wearing course paving on motorways, national highways, and state arterial corridors (AC10 / AC14 to tight IRI roughness specifications)
  • Heavy structural asphalt base and binder course placement (AC20 / AC28 dense bituminous base up to 100 mm+ compacted thickness)
  • Airport runway, taxiway, and heavy-duty apron pavement construction to stringent surface tolerance hold-points
  • Major road rehabilitation, cold-planed asphalt inlay (mill-and-fill), and asphalt overlay remediation
  • Urban arterial road reconstruction, intersection widening, and bus lane paving
  • Subdivision access roads, industrial estates, and port container terminal hardstand pavements
  • Narrow shoulder paving and verge road-widening passes using mechanical screed cutoff shoes

Class planning guide

Published manufacturer specifications for the Vögele SUPER 1900-3i / 19-22 t class tracked asphalt paver. Use supplier specifications for exact procurement.

Class planning values
RefItemValuePlanning note
01.01Operating mass21,050 kg (to 5.0 m) / 26,900 kg (to 8.5 m)Base tractor unit with AB 500 TV screed; add 5,850 kg for bolt-on extension kit up to 8.5 m.
01.02Theoretical throughput900 t/h (375 m³/h)Maximum hourly laydown capacity under uninterrupted delivery and continuous paving.
01.03Standard paving width2.55 m to 5.00 m (up to 8.5 m)Infinitely variable hydraulic telescoping from 2.55 m to 5.00 m; mechanical extensions to 8.50 m.
01.04Diesel engine rated power145 kW (194 hp) @ 2,000 rpmLiquid-cooled Cummins B6.7-C195 6-cylinder diesel (140 kW in fuel-saving ECO mode @ 1,700 rpm).
01.05Material hopper payload14.0 tonnes (14,000 kg)Heavy surge reception hopper with hydraulic folding wings and sprung push-rollers.
01.06Fuel consumption allowanceAbout 12.0 to 26.0 L/hr17.5 L/hr medium continuous paving duty; 380 L tank provides over 21 hours endurance.
01.07Shipping dimensions6.60 m (L) x 2.55 m (W) x 3.10 m (H)Transport envelope with canopy lowered and screed retracted. 21,050 kg shipping tare.
Choosing the machine
RefItemValuePlanning note
02.01Motorway & highway pavingHigh compaction TV screed & dual skisTamper and vibration deliver high pre-compaction density; sonic skis guarantee strict ride roughness (IRI) compliance.
02.02Structural asphalt base100 mm+ lift thickness & 150 mm auger liftPlaces thick AC20/AC28 dense bituminous base courses; augers lift 150 mm hydraulically to clear heavy aggregate head.
02.03Urban & intersection workHydraulic screed width variationInstant continuous hydraulic telescoping between 2.55 m and 5.0 m navigates tapers, flare lanes, and kerb returns.
02.04Pavement rehabilitationMill-and-fill inlay matching cutter widthAccurate 3.5 m to 3.8 m lane inlay paving with tight longitudinal joint compaction against cold-planed asphalt.
02.05Float transport3.10 m collapsed height & 2.55 m widthLow folded canopy height travels comfortably under 4.30 m bridge clearances on standard low-loader floats.

Dimensions and transport planning

Machine dimensions exclude the transport float trailer. Obtain verified deck height, loaded envelope, axle group weights, route clearance and restraint plans from haulier before mobilisation.

Machine only, excludes trailer (Vögele SUPER 1900-3i reference)
CodeDimensionPublished valuePlanning note
1Overall operating height to canopy peak3,860 mmWorking height from ground line to top of elevated hardtop roof with exhaust stack.
2Overall transport height (canopy lowered)3,100 mmLow-profile shipping height with GRP hardtop canopy hydraulically lowered.
3Crawler track ground contact length3,060 mmGround contact length of crawler tracks under load.
4Material hopper length to front push-roller2,100 mmLength of front hopper compartment to face of push-rollers.
5Tractor chassis length (without screed)5,355 mmChassis length from front push-rollers to rear screed tow-point pivot.
6Overall transport length with AB 500 TV screed6,600 mmBumper-to-screed transport length with AB 500 TV screed fully retracted.
7Overall transport length with AB 500 TP1/TP2 screed6,730 mmTransport length when fitted with high-compaction pressure bar screed options.
8Chassis undercarriage ground clearance170 mmGround clearance beneath tractor frame belly plate.
9Crawler track gauge (center-to-center)1,970 mmTransverse track center-to-center spacing.
10Transport width across retracted screed2,550 mmOverall width with AB 500 extending screed end gates folded for road float transport.
11Material hopper width (open wings)3,265 mmOverall reception width across fully unfolded hydraulic hopper wings.
12Crawler track pad width305 mmWidth of individual replaceable rubber track pads.
13Front approach ramp angle14.5°Approach ramp clearance angle at front push-roller and hopper assembly.
14Rear screed departure ramp angle12.5°Departure ramp clearance angle beneath elevated screed for float loading.
15Overall operating width across unfolded hopper wings3,265 mmOverall width across fully deployed material reception wings.

Working range & kinematics

Paving capacity, screed extension limits, material feed kinematics and operating speeds. Allow for haul truck logistics, mix temperature, and downstream compaction capacity.

Paving range & kinematic capacity
CodeKinematic range itemPublished value
1Material hopper surge capacity14.0 tonnes (14,000 kg)
2Theoretical laydown rate capacity900 t/h
3Paving width range (AB 500 extending screed)2.55 m to 5.00 m (up to 8.50 m with extensions)
4Paving speed range0 to 25 m/min
5Travel and roading speed0 to 4.5 km/h
6Paving layer thickness rangeNot verified
7Fuel operating endurance21.7 hours
8Material conveyor feed rateUp to 31 m/min
9Material spreading auger speedUp to 79 rpm
10Theoretical volumetric laydown rate375.0 m³/h
Cost planning

Direct cost and market hire prices

Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 19-22 t tracked asphalt paver class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.

Metro and Remote direct costs

Location comparison (AUD ex GST)
Basis / AUD ex GSTMetroRemote
Direct dry / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Direct wet / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Paver operator / paid site hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Delivered diesel / L1.94 (reference proxy)2.23 (reference proxy)
Maintenance, parts and freightBase allowanceBase plus 25%
Roster and campMetro working-week roster14/7 FIFO, 12-hour days, camp and flights

Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.

Mobilisation, separate one-off cost

Excluded from hourly costs
Purchased transport / AUD ex GSTMetroRemote
One delivery eventTo be quoted by haulierTo be quoted by haulier

Float mobilisation depends on transport distance, route permits (for 2.55 m transport width under NHVR Class 1 Notice) and float deck availability. Allow separate return demobilisation event.

Published hire tariffs: market prices including supplier margin. AUD ex GST.
Source / dateHire basisPer hourPer dayPer weekConditions
Awaiting supplier tender verification
Status: Unquoted placeholder
Dry / Wet pending quotes Not yet quoted Not yet quoted Not yet quoted All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including automated grade control options, screed extensions (>5.0 m), crew fitment, fuel inclusion, and float transport.

First-principles direct hourly cost

Cost schedule / AUD ex GST
ComponentDirect dry AUD/hrDirect wet AUD/hr
Ownership: depreciation and interestNot yet quotedNot yet quoted
Insurance and registrationNot yet quotedNot yet quoted
Maintenance, servicing, tracks and screed wearNot yet quotedNot yet quoted
Fuel and operating lubricants (17.5 L/hr proxy)0.00Not yet quoted
Paver operator cost per paid site hour0.00Not yet quoted
Direct cost per operating hourNot yet quotedNot yet quoted

Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.

Vaultix planning estimates

Productivity and calculator

Throughput t/hr = paving width m x thickness m x density t/m³ x speed m/min x 60 x efficiency; Finished area m²/hr = width m x speed m/min x 60 x efficiency. Linear advance m/hr = speed m/min x 60 x efficiency. All speed, layer thickness, and efficiency allowances are Vaultix civil estimating assumptions based on AS 2150 and Austroads guidelines.

Instrument / 01

Production scenario

t/hr

Scenario inputs

Hourly cost defaults to placeholder ($0.00). Enter your project-quoted wet hire or direct cost to calculate unit cost per tonne and m². All results are estimates.

Activity estimating guides

Vaultix estimating standards, 10 November 2026. Joint planning scenarios, not statistical confidence limits.

Throughput and advance rates reflect asphalt density of 2.40 t/m³ per AS 2150. Field output depends upon batch plant logistics, haul fleet availability, and downstream roller compaction capacity.

01Dense-graded asphalt wearing course

Standard Australian highway traffic lane wearing course (AC10 / AC14) placed to strict vertical level tolerances and International Roughness Index (IRI) specifications. Steady paving speed (4.0 m/min) is maintained to ensure uniform surface texture and avoid screed float fluctuation.

Vaultix assumptions: Paving speed 4.0 m/min; effective width 3.5 m; compacted thickness 50 mm (0.050 m); asphalt density 2.40 t/m³; efficiency 72%.

Worked example: Area = 3.5 m x 4.0 m/min x 60 x 0.72 = 605 m²/hr (173 linear m/hr). Throughput = 3.5 m x 0.050 m x 2.40 t/m³ x 4.0 m/min x 60 x 0.72 = 72.6 t/hr (726 tonnes per 10-hour shift).

Allow for: Quad-dog delivery truck turnaround, material transfer vehicle (MTV / shuttle buggy) hopper buffer, joint heater operation, and core sampling hold points.

Pitfalls: Paver stops cause screed indentation marks, cooling aggregate pockets, and localized IRI roughness failures. Maintain continuous forward motion matched to batch plant production.

02Asphalt base / intermediate

Heavy structural asphalt base course (AC20 / AC28 dense bituminous base) placed at 100 mm compacted depth. High mass laydown demand per linear metre requires lower forward speed (3.0 m/min) to prevent screed climb and prevent asphalt batch plant starvation.

Vaultix assumptions: Paving speed 3.0 m/min; effective width 3.6 m; compacted thickness 100 mm (0.100 m); asphalt density 2.40 t/m³; efficiency 70%.

Worked example: Area = 3.6 m x 3.0 m/min x 60 x 0.70 = 454 m²/hr (126 linear m/hr). Throughput = 3.6 m x 0.100 m x 2.40 t/m³ x 3.0 m/min x 60 x 0.70 = 108.9 t/hr (1,089 tonnes per 10-hour shift).

Allow for: High mass delivery logistics, thermal retainment covers on haulage trucks, screed tamper stroke adjustment, and heavy steel breakdown rolling.

Pitfalls: Excessive forward speed on thick courses causes screed climb and density segregation. Auger tunnel height must be raised to 150 mm to prevent aggregate shearing.

03Shoulder paving

Narrow highway hard shoulder or verge road-widening pass (typically 1.8 m width) using mechanical screed cutoff shoes. Higher linear speed (4.5 m/min) is achievable as ride roughness tolerances are less onerous.

Vaultix assumptions: Paving speed 4.5 m/min; effective width 1.8 m; compacted thickness 50 mm (0.050 m); asphalt density 2.40 t/m³; efficiency 65%.

Worked example: Area = 1.8 m x 4.5 m/min x 60 x 0.65 = 316 m²/hr (176 linear m/hr). Throughput = 1.8 m x 0.050 m x 2.40 t/m³ x 4.5 m/min x 60 x 0.65 = 37.9 t/hr (379 tonnes per 10-hour shift).

Allow for: Guardrail barrier offsets, drainage drop-inlets, unpaved shoulder soft edges, and uneven crossfall transitions.

Pitfalls: Operating crawler track off pavement edge can destabilize screed plane. Fit cutoff shoes and maintain tractor tracks firmly on compacted base.

04Intersection and tie-in paving

Urban intersection, roundabout, or turn-lane tying into existing kerbs and cold-milled headers. Paving speed is restrained (2.2 m/min) with constant hydraulic screed width modulation (2.55 to 4.8 m), frequent handwork raking, and live traffic staging.

Vaultix assumptions: Paving speed 2.2 m/min; effective width 3.5 m; compacted thickness 50 mm (0.050 m); asphalt density 2.40 t/m³; efficiency 50%.

Worked example: Area = 3.5 m x 2.2 m/min x 60 x 0.50 = 231 m²/hr (66 linear m/hr). Throughput = 3.5 m x 0.050 m x 2.40 t/m³ x 2.2 m/min x 60 x 0.50 = 27.7 t/hr (277 tonnes per 10-hour shift).

Allow for: Extensive handwork raking by 3 rakers, manual plate compaction along kerb lips, transverse joint feathering, and complex traffic staging.

Pitfalls: Frequent start-stops and sharp radius turns create material segregation and cool mix pockets. Screed operators must coordinate hydraulic extensions smoothly.

05Overlay and inlay

Pavement rehabilitation including mill-and-fill inlay into cold-planed asphalt boxes or structural overlay over profiled bitumen bases. Matches milling cutter width (typically 3.5 m) with steady travel and sonic joint matching.

Vaultix assumptions: Paving speed 4.2 m/min; effective width 3.5 m; compacted thickness 45 mm (0.045 m); asphalt density 2.40 t/m³; efficiency 72%.

Worked example: Area = 3.5 m x 4.2 m/min x 60 x 0.72 = 635 m²/hr (181 linear m/hr). Throughput = 3.5 m x 0.045 m x 2.40 t/m³ x 4.2 m/min x 60 x 0.72 = 68.6 t/hr (686 tonnes per 10-hour shift).

Allow for: Tack coat curing verification, sonic averaging ski tracking on adjacent milled rebate, joint sealant tape application, and tight night possession hours.

Pitfalls: Mismatching milled cutter width results in screed riding on un-milled shoulder, causing longitudinal level defect. Align screed end gate precisely with milling joint.

06Bridge approach paving

Controlled transition paving onto bridge abutment relief slabs, waterproofing membrane protection courses, and expansion joint block-outs. Steady, restrained speed (2.8 m/min) prevents dynamic bump formation at bridge joints.

Vaultix assumptions: Paving speed 2.8 m/min; effective width 3.6 m; compacted thickness 50 mm (0.050 m); asphalt density 2.40 t/m³; efficiency 60%.

Worked example: Area = 3.6 m x 2.8 m/min x 60 x 0.60 = 363 m²/hr (101 linear m/hr). Throughput = 3.6 m x 0.050 m x 2.40 t/m³ x 2.8 m/min x 60 x 0.60 = 43.6 t/hr (436 tonnes per 10-hour shift).

Allow for: Surveyor elevation checks, protective steel plates over expansion joints, membrane protection verification, and manual joint edging.

Pitfalls: Dynamic impact over bridge joint blockouts can shear screed sole plates or damage expansion joints. Utilize AutoSet Plus screed lift to ramp over joint gap.

07Carpark and industrial hardstand

Commercial retail carparks, logistics distribution centre hardstands, and industrial warehouse exterior pavements. Paving speed (3.5 m/min) and wide screed setting (4.0 m) balance large open bay coverage with layout maneuvering around kerb returns and stormwater pits.

Vaultix assumptions: Paving speed 3.5 m/min; effective width 4.0 m; compacted thickness 50 mm (0.050 m); asphalt density 2.40 t/m³; efficiency 65%.

Worked example: Area = 4.0 m x 3.5 m/min x 60 x 0.65 = 546 m²/hr (137 linear m/hr). Throughput = 4.0 m x 0.050 m x 2.40 t/m³ x 3.5 m/min x 60 x 0.65 = 65.5 t/hr (655 tonnes per 10-hour shift).

Allow for: Storm drainage pit blockouts, light pole island maneuvering, delivery truck staging, and edge handwork.

Pitfalls: Frequent turns and short run bays increase transverse joint count. Coordinate joint layout to align with traffic aisles.

Estimator checks

  • Confirm screed configuration: standard AB 500 TV hydraulically extends from 2.55 m to 5.00 m. If paving widths up to 8.50 m are scheduled, allow mechanical bolt-on extension boxes, auger extensions, and fitting labor.
  • Paving speed matching: Maintain forward speed between 2.5 and 5.0 m/min to establish thermal and hydrostatic equilibrium beneath the screed. Paver stops cause screed settling and transverse ride bumps.
  • Delivery logistics & truck balancing: Continuous paving requires synchronized asphalt batch plant supply and delivery trucking. Hopper surge capacity is 14.0 t; each truck changeover takes approximately 60 to 90 seconds.
  • Grade and slope control: Verify automated machine guidance fitment (Niveltronic Plus with dual ultrasonic multi-foot skis, sonic grade sensors, or 3D Total Station UTS machine control) to achieve specified surface level tolerances.
  • Transport logistics: Retracted width of 2.55 m requires an NHVR Class 1 Oversize Load Notice in all Australian states (signage, flags, beacons). Travel height of 3.10 m (canopy lowered) loads safely under 4.30 m on a standard drop-deck float.
  • Compaction train coordination: Coordinate paver advance with downstream compaction train (typically 10-12 t tandem vibratory roller for breakdown compaction, followed by 15-24 t multi-tyre pneumatic roller for intermediate kneading).
  • All hire rate schedules are unquoted placeholders. In accordance with Vaultix estimating principles, never invent hire rates without formal supplier tenders.
  • No HRWL class required; operator competency confirmed by VOC and national unit of competency RIIHAN309F (Conduct civil paving operations).

Data basis. Independent check 10 November 2026 against the Vogele SUPER 1900-3i brochure: all 9 values checked matched. The maximum layer thickness of 300 mm is not printed for the AB 500 screed (the sheet gives up to 40 cm for the SB 300 only), so it is Not verified. Reference model: Vögele SUPER 1900-3i Tracked Highway Class Asphalt Paver (equipped with AB 500 TV Extending Screed), OEM specification document 2865477 EN/06.20. Sourced 10 November 2026. Fuel uses Cummins B6.7-C195 engine load-profiling proxy (17.5 L/hr medium duty). Productivity uses Vaultix paving formulas (Austroads / AS 2150). Hire rates remain unquoted placeholders pending verified commercial tenders. Sources and assumptions.

Notes / 01Tracked Asphalt Paver / estimating referenceScale NTS Source: Vaultix plant library. Sources and assumptions

Entry / asphalt-paver   Issue / 2026-11-10

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.