Plant / 350 to 450 t lattice boom crawler crane
400 t Crawler Crane
The ultra-heavy lift lattice boom crawler crane for Australian bridge segmental erection, wind turbine installation, and heavy industrial engineering.
- Lattice boomAssembly and rigging time depend on the chosen configuration.
- Crawler tracksCheck access and released working platform requirements.
- CounterweightInclude transport and assembly of required components.
- Max capacity
- 400,000kg
- Max boom length
- 96.0m
AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.
Choosing this class of crawler crane
A 400 t class (350 to 450 t) lattice boom crawler crane (such as the Manitowoc 16000) is the primary ultra-heavy lift workhorse for major Australian infrastructure projects, including balanced cantilever segmental bridge erection, massive precast Super-T installation, wind farm turbine tower placement, power station boiler/HRSG modules, and major bored piling cage handling. Delivering 400 t (440 USt) maximum rated capacity and a maximum standard load moment of 2,599 mton-m (expanding to 5,066 mton-m with MAX-ER), it is powered by a 372 kW (500 HP) Cummins QSX15-C500 engine with independent closed-loop hydraulics. With 10.43 m long crawlers, 1,524 mm wide track shoes, an 8.84 m gauge, up to 96.0 m No. 58 main boom, 84.0 m luffing jib (138.0 m hook height), and 205 t Series 3 counterweight, its modular FACT connection system enables efficient site assembly via assist crane across 15 to 20 transport float loads under Australian OSOM regulations. Productivity is modeled by pick cycles per hour and tonnes placed per hour, strictly governed by operating radius, boom length, and counterweight ballast.
The ultra-heavy lift lattice boom crawler crane for Australian bridge segmental erection, wind turbine installation, and heavy industrial engineering.
400 t class (440 USt) / 96.0 m No. 58 boom / Lattice crawler crane / SafeWork C0 / DG / RA
- Bridge segment erection (balanced cantilever precast segmental box girders, deck units, and pier crossheads)
- Heavy industrial plant installation (transformers, autoclaves, ball mill shells, refinery pressure vessels, and chillers)
- Deep foundation piling cage and heavy steel casing handling (pitching vertical over bored holes and guide walls)
- Wind turbine tower section, nacelle, and hub erection (up to 108 m hub height with No. 58 WA boom or luffing jib)
- Power station and refinery infrastructure lifts (heat recovery steam generators, turbine rotors, and boiler ducts)
- Heavy civil structural steelwork and portal frame erection at extreme radius and elevation
- Site assist handling for ultra-heavy civil components, marine wharf modules, and caisson placement
Class planning guide
Published manufacturer specifications for the Manitowoc 16000 / 400 t class lattice boom crawler crane. Use supplier specifications for exact procurement.
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 01.01 | Max lifting capacity | 400 t @ 6.4 m radius (360° slew) | 400 t on 30.0 m No. 58 boom with 205 t Series 3 counterweight on 26-part line. |
| 01.02 | Maximum load moment | 2,599 mt-m (5,066 mt-m with MAX-ER) | Maximum load moment rating on standard crawlers; expands to 5,066 mt-m with MAX-ER attachment. |
| 01.03 | Main boom length | 30.0 m to 96.0 m (up to 108 m WA) | No. 58 heavy-lift modular lattice boom with FACT connection system; 84 m luffing jib optional. |
| 01.04 | Maximum hook height | 96.0 m (up to 138.0 m with luffing jib) | Hook height reaches 96.0 m on main boom; 84.0 m luffing jib extends hook height to 138.0 m. |
| 01.05 | Engine rated power | 372 kW (500 BHP) @ 1,800 rpm | Cummins QSX15-C500 turbocharged diesel powering 6 independent closed-loop piston pumps. |
| 01.06 | Counterweight / ballast | 205 t (150.6 t upper + 54.4 t carbody) | Series 3 counterweight package; up to 213 t additional ballast with hanging MAX-ER. |
| 01.07 | Operating weight (equipped) | Not verified | Derived: 39,612 kg (rotating bed) + 28,161 kg (carbody) + 65,330 kg (2x crawlers) + 205,014 kg (Series 3 ballast) + 21,609 kg (boom butt) + 11,373 kg (boom top/trans) + 9,661 kg (410 t hook block) + ~14,240 kg (fluids, mast, wire ropes, cab) = approx. 395,000 kg total operating mass. |
| 01.08 | Fuel burn allowance | 18 to 55 L/hr (32.0 L/hr civil likely) | Cummins QSX15 civil duty cycle allowance based on Australian crane fleet telematics. |
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 02.01 | Ultra-heavy infrastructure | Bridge segments & heavy precast | Exceptional load chart capacity (e.g. 194.8 t at 12 m, 106.3 t at 18 m, 50.3 t at 30 m) erects massive civil structures. |
| 02.02 | Wind farm & power station | 138 m tip height & 108 m WA boom | High hook elevation and heavy reach installs tall wind turbine towers, nacelles, and power station HRSG modules. |
| 02.03 | Crawler mobility under load | Pick-and-carry on certified pad | 10.43 m crawlers with 1,524 mm wide shoes allow travel across prepared hardstands with suspended load. |
| 02.04 | Modular transport logistics | 15 to 20 transport float loads | Detachable crawlers, carbody, rotating bed, and counterweights pack into road-compliant OSOM loads. |
| 02.05 | Site assembly allowance | 2 to 3 days with assist crane | Requires auxiliary 100 t to 150 t crane and certified rigging crew; separate project mobilization allowance. |
Dimensions and transport planning
Machine dimensions exclude transport float trailers. Complete crane cannot travel on public roads assembled; modular breakdown across 15 to 20 heavy haulage float loads is required. Obtain verified deck heights, route clearance, axle loadings, and NHVR OSOM permits before mobilisation.
| Code | Dimension | Published value | Planning note |
|---|---|---|---|
| L_crw | Overall crawler length | 10,430 mm | High-strength fabricated crawler side frame assemblies with FACT connection system. |
| W_crw_ext | Overall working width over crawlers | 8,840 mm | Transverse overall width across outer edges of crawler track shoes in working trim. |
| W_crw_pad | Crawler track shoe width | 1,524 mm | 60" wide cast steel crawler pads providing broad ground contact footprint. |
| W_crw_unit | Individual crawler assembly transport width | 2,030 mm | Crawler side frame width detached for transport; mass 32,665 kg each. |
| H_crw | Crawler assembly height | 1,610 mm | Crawler frame transport height on low-loader float. |
| GC | Ground clearance under carbody | 710 mm | Ground line to underside of carbody chassis (390 mm to carbody counterweights). |
| R_tail | Tailswing radius (Series 1, 2, 3 counterweights) | 7,560 mm | Rear clearance radius required behind centerline of rotation for 205 t counterweight stack. |
| R_tail_maxer | Tailswing radius with MAX-ER® (maximum stinger) | 15,000 mm | Rear clearance radius with heavy-lift MAX-ER attachment at maximum 15.0 m stinger position. |
| H_cab | Height over operator Vision Cab | 4,110 mm | Ground to roof of cab in working position; cab swings to front for transport. |
| H_mast | Moving mast pin height | 11,130 mm | Elevation to moving mast connection pin in raised operating position. |
| L_rot | Rotating bed transport length | 13,250 mm | Primary heavy float payload module; mass 39,612 kg. |
| W_rot | Rotating bed transport width | 3,200 mm | Requires NHVR Class 1 OSOM oversize permit for travel. |
| H_rot | Rotating bed transport height | 2,870 mm | Requires drop-deck low-loader to meet bridge clearance limits. |
| L_car | Carbody transport length | 6,780 mm | Includes central turntable and 4 swing drive planetary gearboxes. |
| W_car | Carbody transport width | 3,000 mm | Carbody module transport width; mass 28,161 kg. |
| H_car | Carbody transport height | 2,520 mm | Carbody module transport height on float deck. |
| W_tray | Upper counterweight tray width | 8,330 mm | Base counterweight tray transport width; mass 19,958 kg. |
Working range & kinematics
Rated lifting capacities, hook heights, and operating reach envelopes for the Manitowoc 16000 crawler crane. Capacities are strictly governed by working radius, boom length, and counterweight ballast under AS 1418.5 / AS 2550.5.
| Code | Kinematic range item | Published value |
|---|---|---|
| 1 | Maximum rated lifting capacity (360° slew, 6.4 m radius, 30 m boom) | 400,000 kg (Rated on 30.0 m No. 58 heavy-lift main boom at 6.4 m radius with 205 t Series 3 ballast, 26 parts of line) |
| 2 | Maximum load moment (standard liftcrane) | 2,599 mton-m (18,800 ft-kips; maximum structural rating on standard crawlers) |
| 3 | Maximum load moment with MAX-ER® | 5,066 mton-m (36,405 ft-kips; achieved with wheeled or hanging MAX-ER attachment) |
| 4 | Capacity at 8.0 m radius (360°, 30 m boom) | 323,800 kg (323.8 t; 323.3 t on 36 m boom; 283.4 t on 42 m boom) |
| 5 | Capacity at 10.0 m radius (360°, 30 m boom) | 256,400 kg (256.4 t; 256.6 t on 42 m boom; 257.2 t on 48 m boom) |
| 6 | Capacity at 12.0 m radius (360°, 30 m boom) | 194,800 kg (194.8 t; bridge girder rating; 195.5 t on 42 m boom; 181.9 t on 60 m boom) |
| 7 | Capacity at 14.0 m radius (360°, 30 m boom) | 153,700 kg (153.7 t; civil erection rating; 154.5 t on 60 m boom; 134.0 t on 72 m boom) |
| 8 | Capacity at 18.0 m radius (360°, 30 m boom) | 106,300 kg (106.3 t; intermediate reach rating; 105.8 t on 60 m boom; 77.2 t on 96 m boom) |
| 9 | Capacity at 22.0 m radius (360°, 30 m boom) | 79,600 kg (79.6 t; 78.9 t on 60 m boom; 75.8 t on 96 m boom) |
| 10 | Capacity at 26.0 m radius (360°, 30 m boom) | 62,400 kg (62.4 t; 61.6 t on 60 m boom; 58.4 t on 96 m boom) |
| 11 | Capacity at 30.0 m radius (360°, 30 m boom) | 50,300 kg (50.3 t; long-reach rating; 49.6 t on 60 m boom; 46.2 t on 96 m boom) |
| 12 | Capacity at 40.0 m radius (360°, 96 m boom) | 27,600 kg (27.6 t; high-reach placement on 96 m fully extended heavy-lift boom) |
| 13 | Capacity at 50.0 m radius (360°, 96 m boom) | 17,000 kg (17.0 t; extended radius rating on 96 m boom; 18.7 t at 48 m radius) |
| 14 | Capacity at 60.0 m radius (360°, 96 m boom) | 10,100 kg (10.1 t; long-radius placement rating on 96 m boom) |
| 15 | Capacity at 70.0 m radius (360°, 96 m boom) | 5,300 kg (5.3 t; extreme reach placement rating on 96 m boom) |
| 16 | Capacity at maximum main boom radius (76.0 m radius, 96 m boom) | 3,700 kg (3.7 t; maximum reach limit on 96.0 m heavy-lift main boom) |
| 17 | Maximum hook height (main boom) | 96.0 m (At 82° elevation angle on 96.0 m No. 58 boom; tip height approx. 98.0 m) |
| 18 | Maximum hook height with luffing jib | 138.0 m (With 54.0 m No. 58 main boom plus 84.0 m No. 59 luffing jib; tip height 140.0 m / 453 ft) |
Direct cost and market hire prices
Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 350 to 450 t crawler crane class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.
Metro and Remote direct costs
| Basis / AUD ex GST | Metro | Remote |
|---|---|---|
| Direct dry / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Direct wet / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Crane operator and rigger crew / paid site hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Delivered diesel / L | 1.94 (reference proxy) | 2.23 (reference proxy) |
| Maintenance, parts and freight | Base allowance | Base plus 25% |
| Roster and camp | Metro working-week roster | 14/7 FIFO, 12-hour days, camp and flights |
Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.
Mobilisation, separate one-off cost
| Purchased transport / AUD ex GST | Metro | Remote |
|---|---|---|
| One delivery event | To be quoted by haulier | To be quoted by haulier |
Mobilisation requires modular breakdown across 15 to 20 heavy low-loader and drop-deck float trailers (up to 25 to 30 loads with luffing jib or MAX-ER), NHVR Class 1 OSOM permits, route surveys, pilot escorts, and 2 to 3 days site assembly via an auxiliary 100 t to 150 t assist crane. Allow separate return demobilisation and assist crane allowance.
| Source / date | Hire basis | Per hour | Per day | Per week | Conditions |
|---|---|---|---|---|---|
| Awaiting supplier tender verification Status: Unquoted placeholder |
Dry / Wet pending quotes | Not yet quoted | Not yet quoted | Not yet quoted | All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including boom configuration (up to 96 m), luffing jib options, 205 t Series 3 counterweight fitment, assist crane assembly, fuel inclusion, and 15 to 20 transport float loads. |
First-principles direct hourly cost
| Component | Direct dry AUD/hr | Direct wet AUD/hr |
|---|---|---|
| Ownership: depreciation and interest | Not yet quoted | Not yet quoted |
| Insurance and registration | Not yet quoted | Not yet quoted |
| Maintenance, servicing, tracks and wear parts | Not yet quoted | Not yet quoted |
| Fuel and operating lubricants (32.0 L/hr crane proxy) | 0.00 | Not yet quoted |
| Crane operator and rigger crew labour per paid site hour | 0.00 | Not yet quoted |
| Direct cost per operating hour | Not yet quoted | Not yet quoted |
Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.
Productivity and calculator
Lifts per Day = (8 h × Efficiency × 3,600) / Cycle s; where Total Cycle Time (s) = T_hook + T_slew/luff + T_set/release. Picks per Hour = 3,600 / Cycle s × Efficiency. Hourly Output Rate (t/hr) = Picks per Hour × Typical Unit Load (t). Assembly and disassembly days (typically 2 to 3 days using an auxiliary 100–150 t assist crane across 15–20 transport float loads) must be budgeted as a separate mobilization allowance, not diluted into shift lifting rates. Lifting capacity is governed by configuration (boom length, working radius, and Series 1–3 counterweight up to 205 t, derating from 400.0 t at 6.4 m to 106.3 t at 18.0 m, 50.3 t at 30.0 m, and 3.7 t at 76.0 m on 96.0 m boom; not a fixed lifting chart). All factors are Vaultix civil estimating assumptions.
Activity estimating guides
Vaultix crane estimating standards, 10 November 2026. Joint planning scenarios, not statistical confidence limits.
Cycle times based on 3-part cycle: hook/rigging (120-720 s), slew/luff/hoist (120-480 s), and set/release/de-rig (180-1440 s). Productivity model: Lifts per Day = (8 h × Efficiency × 3,600) / Cycle s. Assembly and disassembly (2 to 3.5 days via assist crane) budgeted as separate allowance. Capacity is strictly governed by configuration (boom length, radius, and counterweight ballast).
01Bridge segment erection
Rigging, hoisting, slewing, and precision landing of precast segmental bridge deck units or balanced cantilever box girder segments onto bridge piers and abutments.
Vaultix assumptions: Hook time 480 s; slew & luff time 300 s; set & release time 720 s; total cycle time 1,500 s; efficiency 60%; typical unit load 45.0 t at 24.0 m operating radius; Series 3 counterweight 205 t; configuration rated capacity 70.0 t.
Worked example: Lifts per 8 h day = (8 h × 0.60 × 3,600) / 1,500 s = 11.5 lifts/day (1.44 picks/hr); 1.44 picks/hr × 45.0 t = 64.8 t/hr placed (~518 t/shift). Assembly & disassembly: 2.5 days separate allowance.
Allow for: Certified heavy spreader beam, multi-point sling/shackle connections, dual tag lines, two certified riggers, surveyor 3D coordinate verification, temporary PT strand alignment, continuous wind speed monitoring, and 2.5-day assist crane mobilization allowance.
Pitfalls: Strict road/rail possession windows; boom deflection increases radius by up to 1.5 m under heavy load; wind gusts exceeding 9 m/s necessitate immediate lift hold.
02Heavy plant lifts
Hoisting heavy industrial modules, transformers, autoclaves, ball mill shells, or refinery vessels off transport floats and positioning onto plinths.
Vaultix assumptions: Hook time 420 s; slew & luff time 240 s; set & release time 600 s; total cycle time 1,260 s; efficiency 55%; typical unit load 60.0 t at 20.0 m operating radius; Series 3 counterweight 205 t; configuration rated capacity 90.0 t.
Worked example: Lifts per 8 h day = (8 h × 0.55 × 3,600) / 1,260 s = 12.6 lifts/day (1.57 picks/hr); 1.57 picks/hr × 60.0 t = 94.2 t/hr placed (~754 t/shift). Assembly & disassembly: 2.5 days separate allowance.
Allow for: Modular spreader frames, certified heavy grommets, dual dogmen for blind landing, vibration isolators, millwright alignment, anchor bolt clearance, and 2.5-day assist crane mobilization allowance.
Pitfalls: Asymmetric center of gravity; millwright clearance tolerances; dynamic load deration on long radius.
03Pile cage and casing handling
Attaching spreader bar to heavy reinforced foundation pile cages (up to 2.5 m diameter, 25-40 m length), pitching vertical over bored holes, and lowering into position.
Vaultix assumptions: Hook time 300 s; slew & luff time 210 s; set & release time 540 s; total cycle time 1,050 s; efficiency 70%; typical unit load 35.0 t at 18.0 m operating radius; Series 3 counterweight 205 t; configuration rated capacity 106.3 t.
Worked example: Lifts per 8 h day = (8 h × 0.70 × 3,600) / 1,050 s = 19.2 lifts/day (2.40 picks/hr); 2.40 picks/hr × 35.0 t = 84.0 t/hr placed (~672 t/shift). Assembly & disassembly: 2.0 days separate allowance.
Allow for: 4-part spreader bar, auxiliary whip line for pitch-up, drill rig coordination, bentonite slurry inspection hold points, mechanical coupler splicing pauses, and 2.0-day assist crane mobilization allowance.
Pitfalls: Long pile cages buckle if rigged without certified spreader bar; slurry suction forces; tag line control in wind.
04Tower and pylon lifts
Hoisting lattice transmission tower sections, wind turbine tower segments, or communication pylons to high hook elevation (50 to 90 m) and guiding flange bolting.
Vaultix assumptions: Hook time 360 s; slew & luff time 300 s; set & release time 660 s; total cycle time 1,320 s; efficiency 58%; typical unit load 35.0 t at 28.0 m operating radius; Series 3 counterweight 205 t; configuration rated capacity 55.0 t.
Worked example: Lifts per 8 h day = (8 h × 0.58 × 3,600) / 1,320 s = 12.7 lifts/day (1.58 picks/hr); 1.58 picks/hr × 35.0 t = 55.3 t/hr placed (~443 t/shift). Assembly & disassembly: 3.0 days separate allowance.
Allow for: Specialized lifting yokes, nylon grommets, dual tag lines, MEWP access for bolting, bolt torque certification, boom-tip anemometer monitoring, and 3.0-day assist crane mobilization allowance.
Pitfalls: High-altitude wind velocity limits; boom chord deflection at height; tag line tensioning.
05Power station / industrial lifts
Precision hoisting and placement of heat recovery steam generator (HRSG) modules, turbine rotors, stator units, condenser sections, or flue gas ducts in brownfield industrial plants.
Vaultix assumptions: Hook time 420 s; slew & luff time 300 s; set & release time 780 s; total cycle time 1,500 s; efficiency 52%; typical unit load 40.0 t at 26.0 m operating radius; Series 3 counterweight 205 t; configuration rated capacity 62.0 t.
Worked example: Lifts per 8 h day = (8 h × 0.52 × 3,600) / 1,500 s = 10.0 lifts/day (1.25 picks/hr); 1.25 picks/hr × 40.0 t = 50.0 t/hr placed (~400 t/shift). Assembly & disassembly: 3.0 days separate allowance.
Allow for: Heavy lifting beams, multi-dogman radio relay for blind lifts, thermal expansion guide key alignment, shimming, permit-to-work isolations, and 3.0-day assist crane mobilization allowance.
Pitfalls: Congested brownfield envelopes; blind lift coordination; live facility hot work permits.
06Wind turbine generator installation
High-elevation hoisting and precision mounting of wind turbine nacelles, drive trains, generators, and pre-assembled rotor star assemblies onto tower top flanges.
Vaultix assumptions: Hook time 420 s; slew & luff time 360 s; set & release time 900 s; total cycle time 1,680 s; efficiency 50%; typical unit load 75.0 t at 22.0 m operating radius; Series 3 counterweight 205 t; configuration rated capacity 82.0 t.
Worked example: Lifts per 8 h day = (8 h × 0.50 × 3,600) / 1,680 s = 8.6 lifts/day (1.07 picks/hr); 1.07 picks/hr × 75.0 t = 80.4 t/hr placed (~643 t/shift). Assembly & disassembly: 3.5 days separate allowance.
Allow for: Specialized wind turbine lifting yokes, No. 58 WA boom with 7.0 m extended upper boom point, dual certified tag line crews, boom-tip ultrasonic anemometer, MEWP access for bolt tensioning, and 3.5-day assist crane mobilization allowance.
Pitfalls: Strict wind speed cut-offs (operations cease at >9.0 m/s); extreme boom deflection at 100+ m hook height; dynamic wind gust sail area effects.
07Crane assembly and disassembly
Auxiliary assist crane unloading and positioning of crawler side frames, counterweight slabs, moving mast, boom butt, lattice inserts, and boom top during mobilization.
Vaultix assumptions: Hook time 240 s; slew & luff time 210 s; set & release time 360 s; total cycle time 810 s; efficiency 75%; typical unit load 18.0 t at 12.0 m operating radius; Series 3 counterweight 205 t; assist crane capacity 45.0 t.
Worked example: Lifts per 8 h day = (8 h × 0.75 × 3,600) / 810 s = 26.7 lifts/day (3.33 picks/hr); 3.33 picks/hr × 18.0 t = 60.0 t/hr placed (~480 t/shift). Assembly & disassembly: 2.5 days separate allowance.
Allow for: FACT quick-alignment guide pins, hydraulic pin pushers, assist crane rigging crew, Manitowoc certified rigging master, electrical CAN-bus connections, and 2.5-day mobilization allowance.
Pitfalls: Exclusion zone during boom raising (1.2x boom length); pinch point hazards during counterweight stacking; ground bearing under assist crane outriggers.
Estimator checks
- SafeWork High Risk Work Licences: Operator must hold HRWL class C0 (Open capacity slewing mobile crane) or CO with crawler endorsement; minimum 2 to 3 qualified riggers/dogmen holding class DG (Dogging), RI (Intermediate Rigging), or RA (Advanced Rigging) required for heavy multi-point slinging and precast segmental bridge erection. Critical lifts (>20 t, tandem lifts, rail/highway corridors, or lifts exceeding 75% chart capacity) require an appointed Lift Supervisor and Lift Engineer under AS 2550.1 and AS 2550.5.
- Mobilisation transport fleet logistics: The crane cannot travel on public roads assembled and requires complete breakdown into 15 to 20 transport float loads for standard 48-60 m boom trim (and up to 25 to 30 loads for 96 m boom with luffing jib or MAX-ER). The governing single transport load is the rotating bed module (length 13.25 m, width 3.20 m, height 2.87 m, mass 39,612 kg) requiring a 4-axle or 5-axle drop-deck platform trailer. Each crawler unit (32,665 kg) and carbody (28,161 kg) requires dedicated heavy float transport.
- Auxiliary assist crane for site assembly: While the moving mast has self-erect capabilities for crawler and ballast positioning, standard Australian civil practice utilizes an auxiliary 100 t to 150 t all-terrain crane to safely erect the crane in 2 to 3 days (16 to 24 crane hours). Full 96 m boom with luffing jib requires 4 to 5 days assembly. Disassembly requires an equivalent 2 to 3 days. Mobilization freight, assist crane hire, and assembly/disassembly days must be budgeted as separate project lump-sum allowances.
- Geotechnical working hardstand & track bearing pressures: Operating weight reaches approx. 395 t in basic Series 3 trim (and exceeds 430 t with long boom and dynamic hook load). Track ground bearing pressures on the 10.43 m x 1.52 m crawlers can reach 250 to 450 kPa (up to 45 t/m²) under adverse slewing quadrants. An RPEQ/geotechnical engineer must inspect and certify the crane working pad, and engineered hardwood cribbing or steel crane mats must be deployed to distribute track bearing safely.
- Dynamic load chart deration by radius: Crawler crane lifting capacity derates steeply as radius increases (e.g. 400.0 t at 6.4 m, 153.7 t at 14.0 m, 106.3 t at 18.0 m, 50.3 t at 30.0 m, 27.6 t at 40.0 m, and 3.7 t at 76.0 m on 96.0 m boom). Estimators must verify that total suspended mass (load + hook block + rigging) does not exceed 75% to 80% of rated chart capacity at governing placement coordinates.
- Boom deflection growth: Heavy loads on long lattice booms (60 to 96 m) induce structural boom chord deflection that increases working radius by 0.5 to 1.5 m. The crane operator and dogman must account for hook radius drift during initial load pickup to prevent side-loading of the boom head.
- Counterweight tailswing exclusion zone: The 205 t Series 3 counterweight swings through a 7.56 m radius (and up to 15.0 m with MAX-ER). A physical exclusion zone with rigid barricading and warning signage must be maintained around the complete slewing perimeter to prevent fatal crush hazards.
- All hire rate schedules are unquoted placeholders. In accordance with Vaultix estimating principles, never invent hire rates without formal supplier tenders.
- Output is pick-governed (picks/hr) and load-governed (t/hr), not bucket payload. Balance crane placement rate with delivery transport and installation crew pacing.
- SafeWork HRWL Class C0 required for crane operator; Class DG, RI or RA required for dogman/rigger.
Data basis. Independent check 10 November 2026 against the Manitowoc 16000 product guide: 9 of 12 values matched (capacity 400 t at 6.4 m, boom, engine 372 kW, fuel, speed, pad width, counterweight, bed and crawler masses). Not verified (not on the sheet): total operating weight, ground bearing pressure, working width and tailswing, and the engine emissions standard. The load-out table on the sheet is for a 108 m boom and spans 19 trailer loads. Reference model: Manitowoc 16000 Lattice Boom Crawler Crane (400 t class). Technical specifications sourced from Manitowoc Cranes / Universal Cranes Australian Fleet Technical Specification (Universal Cranes specification sheet). Verified 10 November 2026. Fuel burn derived from Cummins QSX15 engine telematics duty load factor mapping (32.0 L/hr civil lifting likely). Productivity uses Vaultix heavy civil crane cycle formulas. Hire rates remain unquoted placeholders pending verified tenders. Sources and assumptions.
Entry / crawler-400t Issue / 2026-11-10
Library navigation
Plant and method index · Discipline work packages · Survey conformance and lot release