Plant / 18 to 24 t crawler dozer with semi-U or straight blade
20 t Crawler Dozer
The primary bulk earthmoving and heavy ripping workhorse for highway construction, civil subdivisions, rail corridors, and quarry stockpiles throughout Queensland and Australia.
- BladePush distance and material condition influence production.
- TracksGround conditions affect traction and travel.
- RipperSeparate ripping time from pushing and spreading.
- Semi-U blade
- 5.61m³
- Net power
- 162kW
AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.
Choosing this class of crawler dozer
An 18 to 24 t class crawler dozer (represented by the Komatsu D65EX-18 at 21,270 kg base operating weight with 5.61 m³ Semi-U blade, or 23,190 kg Derived with a 1,920 kg 3-shank parallelogram ripper) is the primary mid-size production tractor across Australian civil earthworks, road corridors, quarry stockpiles, and subdivision developments. Powered by a 162 kW (217 HP) net Komatsu SAA6D114E-6 engine paired with a 3F/3R TORQFLOW lock-up torque converter powershift transmission, Hydrostatic Steering System (HSS), and Parallel Link Undercarriage System (PLUS), it handles heavy cut-to-fill bulk pushing, stiff clay/weathered rock ripping, and 3D GNSS (iMC / Trimble / Topcon) final earthworks trim.
The primary bulk earthmoving and heavy ripping workhorse for highway construction, civil subdivisions, rail corridors, and quarry stockpiles throughout Queensland and Australia.
18 to 24 t class / 5.61 m³ Semi-U blade / Crawler dozer / General estimating guide
- Bulk cut-to-fill pushing and slot dozing of common earth, clay, and ripped rock over 20 m to 50 m push distances
- Topsoil stripping, root mat removal, and vegetation clearing across greenfield road corridors and subdivisions
- Multi-shank parallelogram ripping (up to 590 mm depth) of stiff clay, calcrete, and weathered mudstone/sandstone
- Pushing truck-dumped fill, select material, and quarry product up stockpile ramps and embankment batters
- Pioneering haul road alignments, side-casting bench cuts, spreading subbase lifts, and forming safety bunds
- 3D GNSS (Komatsu iMC 2.0 / Trimble / Topcon) final earthworks trimming of building pads, batters, and road formations
Class planning guide
Published manufacturer specifications for the Komatsu D65EX-18 / 18–24 t class crawler dozer. Use supplier specifications for exact procurement.
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 01.01 | Operating mass (Semi-U blade) | 21,270 kg (Sourced) / 23,190 kg with ripper (Derived) | Komatsu D65EX-18 (Form ZESS006900, pp. 14–15); 21,270 kg + 1,920 kg 3-shank ripper = 23,190 kg. |
| 01.02 | Engine net power (ISO 9249) | 162 kW (217 HP) @ 1,950 rpm | Komatsu SAA6D114E-6 (8.85 L), EPA Tier 4 Final / EU Stage IV (p. 14). |
| 01.03 | Blade capacity (ISO 9246) | 5.61 m³ Semi-U or Sigmadozer | 3,460 mm Semi-U width (p. 15); 4.25 m³ PAT / 3.69 m³ Straight Tilt options (CEN00643, p. 18). |
| 01.04 | Travel speeds (3F / 3R TORQFLOW) | 3.6–11.3 km/h F / 4.5–13.6 km/h R | 3-speed planetary powershift with automatic lock-up torque converter (p. 14). |
| 01.05 | Multi-shank rear ripper | 3 shanks / 590 mm max depth / 1,920 kg | Hydraulically controlled parallelogram ripper, 2,170 mm beam, 640 mm max lift (p. 15). |
| 01.06 | Ground bearing pressure | 44.1 kPa (610 mm single-grouser shoe) | 40,910 cm² ground contact area over 2,970 mm track on ground (CEN00643, p. 16). |
| 01.07 | Fuel / DEF tank capacities | 415 L diesel / 23.5 L DEF | Hourly fuel burn (L/hr) is Not verified on opened OEM brochures (see review table NR-01). |
| 01.08 | Derived shipping mass | 20,880 kg (blade) / 22,800 kg (blade + ripper) | Derived: 21,270 − 75 − 314 = 20,881 kg (+ 1,920 kg ripper = 22,801 kg); base tractor 18,780 kg (p. 14). |
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 02.01 | Bulk push & slot dozing | 5.61 m³ Semi-U or Sigmadozer blade | Outside-mounted push arms and curved moldboard wings retain 4.50–5.05 bank m³/trip over 20–45 m pushes. |
| 02.02 | Hard ground & rock ripping | 3-shank parallelogram ripper (590 mm depth) | Adds 1,920 kg rear tractive ballast for fracturing stiff clay, calcrete, and weathered rock in F1 (3.6 km/h). |
| 02.03 | 3D GNSS final trim | Komatsu iMC 2.0 / Trimble / Topcon 3D | Automatised blade lift and tilt (870 mm max tilt) achieves ±20 mm earthworks pad and batter tolerances. |
| 02.04 | Soft ground / wide grading | PAT (4.25 m³) or PX LGP configuration | Power Angle Tilt blade or wider track shoes (760 mm WX / 915 mm PX) suit wet subgrades and windrow spreading. |
| 02.05 | Float transport | Drop-deck low-loader (OSOM with blade on) | 2.49 m Derived bare track width vs 3.46 m Semi-U blade width; 4.06 m Derived loaded height on 0.90 m deck. |
Dimensions and transport planning
Machine dimensions exclude the transport float trailer. Obtain verified deck height, loaded envelope, axle group weights, route clearance and restraint plans from haulier before mobilisation.
| Code | Dimension | Published value | Planning note |
|---|---|---|---|
| A | Overall length with Semi-U blade (no ripper) | 5,540 mm (5,490 mm with Sigmadozer) | Sourced: Komatsu ZESS006900 (p. 15); CEN00643 (p. 17). Increases to 6,360 mm with rear multi-shank ripper. |
| B | Track gauge (centre-to-centre of tracks) | 1,880 mm | Sourced: Komatsu ZESS006900 (p. 15). |
| C | Width over trunnions (outside push arms) | 3,160 mm (Semi-U) / 3,330 mm (Sigmadozer) | Sourced: Komatsu ZESS006900 (p. 15). Blade width is 3,460 mm (Semi-U) or 3,410 mm (Sigmadozer). |
| D | Height to top of ROPS cab (excluding grouser height) | 3,085 mm | Sourced: Komatsu ZESS006900 (p. 15). Overall height including 65 mm grouser is 3,150–3,160 mm. |
| E | Length of track on ground | 2,970 mm | Sourced: Komatsu ZESS006900 (pp. 14–15). Primary longitudinal stability footprint. |
| F | Standard track shoe width | 610 mm | Sourced: Komatsu ZESS006900 (pp. 14–15); CEN00643 (p. 16). Optional 510 mm narrow shoe available on EX. |
| G | Grouser height | 65 mm | Sourced: Komatsu ZESS006900 (p. 15). Single-grouser shoe profile. |
| H | Ground clearance | 415 mm | Sourced: Komatsu ZESS006900 (pp. 14–15). Minimum clearance under tractor belly pan excluding grouser penetration. |
| I | Overall width over tracks (tractor only, blade removed) | 2,490 mm (Derived) | Derived: 1,880 mm track gauge + 610 mm standard track shoe width = 2,490 mm (2,390 mm with optional 510 mm shoes). Derived from Komatsu ZESS006900 (p. 15). |
| J | Overall length with Semi-U blade and multi-shank ripper | 6,360 mm | Sourced: Komatsu ZESS006900 (p. 15). Total transport envelope length with blade and rear 3-shank ripper installed. |
Working range & kinematics
Dozer blade lift, drop, hydraulic tilt, ripper penetration, and turning radius capabilities. Allow for material swell, slot geometry, slope stability, and operator visibility.
| Code | Kinematic range item | Published value |
|---|---|---|
| 1 | Semi-U blade capacity (ISO 9246, 3,460 × 1,425 mm, 2,420 kg) | 5.61 m³ (7.34 yd³) |
| 2 | Sigmadozer blade capacity (ISO 9246, 3,410 × 1,425 mm, 2,460 kg) | 5.61 m³ (7.34 yd³) |
| 3 | PAT / Straight-tilt blade capacity (ISO 9246) | 4.25 m³ (PAT) / 3.69 m³ (Straight Tilt) |
| 4 | Maximum blade lift above ground (Semi-U / Sigmadozer) | 1,100 mm (Semi-U) / 1,130 mm (Sigmadozer) |
| 5 | Maximum blade drop below ground / digging depth (Semi-U / Sigmadozer) | 440 mm (Semi-U) / 505 mm (Sigmadozer) |
| 6 | Maximum hydraulic blade tilt adjustment (Semi-U & Sigmadozer) | 870 mm |
| 7 | Multi-shank ripper maximum digging depth (3 shanks, 2,170 mm beam) | 590 mm |
| 8 | Multi-shank ripper maximum lift above ground | 640 mm |
| 9 | Minimum turning radius (HSS counter-rotation / pivot) | 1.9 m (1,900 mm) |
Direct cost and market hire prices
Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 18–24 t crawler dozer class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.
Metro and Remote direct costs
| Basis / AUD ex GST | Metro | Remote |
|---|---|---|
| Direct dry / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Direct wet / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Crawler dozer operator / paid site hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Delivered diesel / L | 1.94 (reference proxy) | 2.23 (reference proxy) |
| Maintenance, parts and freight | Base allowance | Base plus 25% |
| Roster and camp | Metro working-week roster | 14/7 FIFO, 12-hour days, camp and flights |
Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.
Mobilisation, separate one-off cost
| Purchased transport / AUD ex GST | Metro | Remote |
|---|---|---|
| One delivery event | To be quoted by haulier | To be quoted by haulier |
Float mobilisation depends on transport distance, route permits, pilot escorts (for 3.46 m Semi-U blade width if transported mounted) and float deck availability. Allow separate return demobilisation event.
| Source / date | Hire basis | Per hour | Per day | Per week | Conditions |
|---|---|---|---|---|---|
| Awaiting supplier tender verification Status: Unquoted placeholder |
Dry / Wet pending quotes | Not yet quoted | Not yet quoted | Not yet quoted | All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including 3D GNSS / iMC options, fuel inclusion, undercarriage/GET wear terms and float costs. |
First-principles direct hourly cost
| Component | Direct dry AUD/hr | Direct wet AUD/hr |
|---|---|---|
| Ownership: depreciation and interest | Not yet quoted | Not yet quoted |
| Insurance and registration | Not yet quoted | Not yet quoted |
| Maintenance, servicing, undercarriage and GET | Not yet quoted | Not yet quoted |
| Fuel and operating lubricants (L/hr Not verified) | 0.00 | Not yet quoted |
| Crawler dozer operator cost per paid site hour | 0.00 | Not yet quoted |
| Direct cost per operating hour | Not yet quoted | Not yet quoted |
Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.
Productivity and calculator
Bank m³/hr = effective bank blade payload m³ × trips/hr × job efficiency. Cycle time (min) = (push distance m / (forward speed km/h × 16.67)) + (return distance m / (reverse speed km/h × 16.67)) + fixed maneuver time. Trips/hr = 60 / cycle time. All push distance, speed, blade payload and efficiency factors are Vaultix estimating assumptions.
Activity estimating guides
Vaultix estimating standards, 11 November 2026. Joint planning scenarios, not statistical confidence limits.
Low scenario reflects longer push distances (40–60 m), lower blade fill factors in hard/cohesive material, and 55–65% efficiency. High scenario reflects short slot-dozing or downhill pushes (18–30 m), high blade fill factors, and 75–83% efficiency.
01Bulk push and spread
Assumes 5.61 m³ Semi-U blade in common earth/sandy clay (0.80 bank load factor = 4.50 bank m³/trip likely; 5.05 bank m³/trip with slot dozing). Likely 30 m push in F1 (3.6 km/h = 60 m/min, 0.50 min push) and reverse in R2 (6.7 km/h = 111.7 m/min, 0.27 min return) plus 0.15 min shift/spot = 0.92 min/cycle (65 trips/hr) at 75% efficiency = 219 bank m³/hr (low 94 at 45 m push; high 356 at 20 m slot push).
Vaultix assumptions: Push distance 30 m; forward speed 3.6 km/h (F1); reverse speed 6.7 km/h (R2); effective bank blade payload 4.50 bank m³; 65 trips/hr; efficiency 75%.
Worked example: Cycle time = (30 / 60) + (30 / 111.7) + 0.15 = 0.92 min. Trips/hr = 60 / 0.92 = 65. Output = 4.50 × 65 × 0.75 = 219 bank m³/hr, or 1,752 bank m³ in an 8-hour shift.
Allow for: Slot trench maintenance, water cart dust/moisture conditioning, padfoot/vibratory roller compaction fleet balance, and cutting edge wear.
Pitfalls: Pushing beyond 50–60 m without slot walls increases side spillage and cycle time; use excavator/truck or scraper fleets for longer hauls.
02Slot dozing
Slot dozing utilizes parallel cut trenches where berm sidewalls prevent material from spilling off the blade ends, retaining 5.10 bank m³/trip (up to 91% loose-to-bank volumetric retention with the 5.61 m³ Semi-U blade). Over an average 25 m slot push in F1 (3.6 km/h = 60 m/min, 0.42 min push) and R2 reverse (6.7 km/h = 111.7 m/min, 0.22 min return) plus 0.15 min shift/spot = 0.79 min/cycle (76 trips/hr) at 78% efficiency, likely production reaches 302 bank m³/hr (low 165 at 40 m push; high 425 at 18 m short slot push).
Vaultix assumptions: Slot push distance 25 m; forward speed 3.6 km/h (F1); reverse speed 6.7 km/h (R2); effective bank blade payload 5.10 bank m³; 76 trips/hr; efficiency 78%.
Worked example: Cycle time = (25 / 60) + (25 / 111.7) + 0.15 = 0.79 min. Trips/hr = 60 / 0.79 = 76. Output = 5.10 × 76 × 0.78 = 302 bank m³/hr, or 2,416 bank m³ in an 8-hour shift.
Allow for: Maintaining parallel slot walls (1.0–1.5 m high), pushing berm walls out at completion of cut, and coordinating haul truck loading or scraper collection.
Pitfalls: Dozing deeper than track height traps the machine in wet or unstable ground; step slots down evenly across the workfront.
03Clearing and stripping
Topsoil and light scrub stripping (150–250 mm cut depth) pushed to perimeter windrows or stockpiles. Root mat and shallow cut reduce effective bank payload to 3.50 bank m³/trip likely. At 40 m average push (F1 3.6 km/h forward = 0.67 min, R2 6.7 km/h reverse = 0.36 min, plus 0.15 min turn = 1.18 min/cycle = 51 trips/hr) and 70% efficiency, likely output is 125 bank m³/hr (equivalent to ~625 m²/hr at 200 mm stripping depth).
Vaultix assumptions: Stripping push distance 40 m; forward speed 3.6 km/h (F1); reverse speed 6.7 km/h (R2); effective bank payload 3.50 bank m³; 51 trips/hr; efficiency 70%.
Worked example: Cycle time = (40 / 60) + (40 / 111.7) + 0.15 = 1.18 min. Trips/hr = 60 / 1.18 = 51. Output = 3.50 × 51 × 0.70 = 125 bank m³/hr (~625 m²/hr at 200 mm depth).
Allow for: Environmental clearing boundary flagging, fauna spotter-catcher hold points, root raking, and separate stockpiling of topsoil vs woody debris.
Pitfalls: Over-cutting into underlying subsoil contaminates reusable topsoil stockpiles and increases stripped volume.
04Ripping
3-shank parallelogram ripper (590 mm max depth, 2,170 mm beam) loosening stiff clay, calcrete, or weathered mudstone/sandstone (350–450 mm penetration depth) combined with short dozer clearing passes. Likely scenario models 40 m pass in F1 at 3.0 km/h under high drawbar load (0.80 min forward), R2 reverse at 6.0 km/h (0.40 min return), and 0.25 min shank raise/reposition = 1.45 min/cycle (41 trips/hr), yielding 123 bank m³/hr at 65% efficiency.
Vaultix assumptions: Ripper pass length 40 m; ripping speed 3.0 km/h (F1); reverse return 6.0 km/h (R2); loosened bank volume 4.60 bank m³/pass; 41 passes/hr; efficiency 65%.
Worked example: Cycle time = (40 / 50) + (40 / 100) + 0.25 = 1.45 min. Passes/hr = 60 / 1.45 = 41. Output = 4.60 × 41 × 0.65 = 123 bank m³/hr.
Allow for: Accelerated GET wear (ripper boots, shank protectors, cutting edges), cross-ripping in harder strata, and seismic velocity checks.
Pitfalls: Turning the tractor while ripper shanks are deeply engaged twists shanks and stresses the parallelogram frame; always raise shanks before pivoting.
05Stockpiling
Pushing truck-dumped fill or quarry product up stockpile batters (+10% to +18% adverse grade). Uphill grade reduces effective bank payload to 3.90 bank m³/trip likely. For a 28 m ramp push (F1 3.4 km/h uphill = 0.49 min, R2 6.7 km/h downhill return = 0.25 min, plus 0.15 min spotting around tipper trucks = 0.89 min/cycle = 67 trips/hr) at 72% efficiency, likely output is 188 bank m³/hr.
Vaultix assumptions: Ramp push distance 28 m; uphill push speed 3.4 km/h; reverse speed 6.7 km/h (R2); effective bank payload 3.90 bank m³; 67 trips/hr; efficiency 72%.
Worked example: Cycle time = (28 / 56.7) + (28 / 111.7) + 0.15 = 0.89 min. Trips/hr = 60 / 0.89 = 67. Output = 3.90 × 67 × 0.72 = 188 bank m³/hr.
Allow for: Tip-head spotter/traffic management, maintaining a 1.5 m safety windrow at stockpile edges, and drainage shaping at shift end.
Pitfalls: Pushing too close to uncompacted stockpile crests risks outer track sloughing; maintain a solid windrow stop block when working above batters.
06Haul road formation
Pioneering alignment cuts, cross-slope benching, spreading select subbase lifts, and forming safety windrows/bunds along civil or mine haul roads. Blade angling/tilting yields 3.80 bank m³/trip likely. At 35 m push distance (4.0 km/h forward = 0.52 min, 6.7 km/h reverse = 0.31 min, 0.15 min shift = 0.98 min/cycle = 61 trips/hr) and 70% efficiency, likely output is 162 bank m³/hr.
Vaultix assumptions: Push distance 35 m; forward speed 4.0 km/h; reverse speed 6.7 km/h (R2); effective bank payload 3.80 bank m³; 61 trips/hr; efficiency 70%.
Worked example: Cycle time = (35 / 66.7) + (35 / 111.7) + 0.15 = 0.98 min. Trips/hr = 60 / 0.98 = 61. Output = 3.80 × 61 × 0.70 = 162 bank m³/hr.
Allow for: Haul truck dumping coordination, grader/roller follow-up for running surface finish, and catch-drain cut-outs.
Pitfalls: Leaving oversized rock protruding in the subgrade layer damages haul truck tyres; rip and blend or cast oversize rock into outer safety bunds.
07Site trimming with GPS
3D GNSS (Komatsu iMC 2.0 / Trimble / Topcon) final earthworks trim of building pads, batters, and road formations to ±20 mm vertical tolerance (skim depth 50–120 mm). Partial blade fill during finishing passes averages 2.10 bank m³/trip likely. At 40 m pass length in F2 (4.5 km/h forward = 0.53 min, R2 6.7 km/h reverse = 0.36 min, 0.15 min turn = 1.04 min/cycle = 58 trips/hr) and 70% efficiency, likely volumetric trim output is 85 bank m³/hr (covering ~1,000–1,400 m²/hr of finished pad surface).
Vaultix assumptions: Trimming pass length 40 m; forward speed 4.5 km/h (F2); reverse speed 6.7 km/h (R2); effective bank payload 2.10 bank m³; 58 trips/hr; efficiency 70%.
Worked example: Cycle time = (40 / 75) + (40 / 111.7) + 0.15 = 1.04 min. Trips/hr = 60 / 1.04 = 58. Output = 2.10 × 58 × 0.70 = 85 bank m³/hr (~1,000–1,400 m²/hr surface finish).
Allow for: Daily GNSS base station and rover calibration checks, 3D design model upload verification, and smooth drum roller proof-rolling.
Pitfalls: Aggressive 65 mm single-grouser shoes disturb finished granular surfaces during tight pivots; execute gradual HSS power turns when trimming final lifts.
Estimator checks
- Confirm blade configuration: standard 5.61 m³ Semi-U blade (3,460 mm wide) or 5.61 m³ Sigmadozer (3,410 mm wide) maximizes bulk slot-dozing output, whereas 4.25 m³ PAT (3,870 mm wide) or 3.69 m³ Straight Tilt (3,970 mm wide on PX) suits fine grading and windrow casting (Sourced: Komatsu ZESS006900 p. 15; CEN00643 p. 18).
- Verify rear attachment mass and capability: the 3-shank parallelogram ripper adds 1,920 kg (raising operating weight from 21,270 kg to 23,190 kg Derived) and achieves 590 mm maximum penetration depth (Sourced: Komatsu ZESS006900 pp. 14–15).
- Check 3D GNSS machine control fitment: integrated Komatsu iMC 2.0 (D65EXi-18, 21,370 kg operating weight, p. 14) or aftermarket dual-mast Trimble/Topcon systems automate rough-to-finish dozing and eliminate stringlines.
- Price float transport for OSOM width: bare track width is Derived at 2.49 m (1,880 mm track gauge + 610 mm standard shoe = 2,490 mm), fitting a standard 2.50 m low-loader deck if the blade is removed, whereas floating with the 3.46 m Semi-U blade attached requires an Oversize/Overmass (OSOM) wide-load permit and pilot escort review (NR-06).
- Verify transport mass and loaded height: Derived shipping mass is 20,880 kg with Semi-U blade (21,270 kg − 75 kg operator − 314 kg at 90% fuel) or 22,800 kg with the 1,920 kg ripper fitted; base tractor without blade/ripper is 18,780 kg sourced (p. 14). Machine height of 3.16 m on a 0.90 m drop-deck low-loader yields a Derived loaded height of 4.06 m.
- Hourly fuel burn (L/hr), discrete drawbar pull by working gear (kN), acoustic noise ratings (dB(A)), and ripper cylinder forces (kN) are Not verified on the opened OEM brochures and are documented in the review table (NR-01 to NR-04).
- Hire rates: All dry, wet, and mobilisation rate cells are left null / 'Not yet quoted' in strict compliance with Vaultix governance (NR-05). Never invent hire rates.
- No High Risk Work Licence (HRWL) class is required in Queensland or Australia; confirm operator holds RIIMPO323E (Conduct civil construction dozer operations) and a current site VOC (Sourced: WorkSafe QLD, p. 1).
Data basis. Reference model: Komatsu D65EX-18 Crawler Dozer, sourced from Komatsu Australia Form ZESS006900 (pp. 4–15) and Global Brochure CEN00643 (pp. 16–19). Sourced 11 November 2026. Hourly fuel burn is Not verified on opened OEM sheets. Productivity uses Vaultix cycle-time and bank blade payload models. Hire rates remain unquoted placeholders pending verified tenders. Sources and assumptions.