Plant / 20 to 23 t crawler hydraulic excavator

20-Tonne Hydraulic Excavator

The benchmark 20-tonne civil hydraulic excavator for bulk earthmoving, deep drainage trenching, truck loading and precision site preparation.

20-Tonne Hydraulic Excavator
  1. BucketSize and fill factor determine material per cycle.
  2. Boom and stickReach and swing distance affect cycle time.
  3. TracksAllow for repositioning and platform condition.
Illustrative Vaultix machine configuration. Consult the selected model’s data for dimensions and capacities.
Standard bucket
1.19m³
Net power
128.5kW
Direct wet cost
Not quoted yet
Hire rates need dated supplier quotes →

AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.

General class information

Choosing this class of hydraulic excavator

A 20 to 23 t class crawler hydraulic excavator (benchmark Cat 320 Next Generation) is the multi-purpose production workhorse of Australian civil infrastructure, commercial site preparation, and pipeline installation. Featuring a 5.7 m reach boom, 2.9 m stick, and standard 1.19 m³ heavy-duty bucket, it delivers 148 kN bucket digging force (161 kN boost) and a maximum digging depth of 6.72 m. Productivity is modeled per hour in loose cubic metres (LCM/hr) and bank cubic metres (BCM/hr) based on cycle times, bucket fill factors, swell allowances, and civil job efficiency.

The benchmark 20-tonne civil hydraulic excavator for bulk earthmoving, deep drainage trenching, truck loading and precision site preparation.

20 to 23 t class / 1.19 m³ HD bucket / Hydraulic excavator / General estimating guide

  • Bulk excavation of foundations, basements, and civil road cut benches
  • Trenching for stormwater drainage pipes, deep sewer mains, water utilities, and electrical services conduits
  • Loading 10-wheel tippers and truck-and-dog haul fleets from excavation benches
  • Batter trimming, embankment dressing, and drainage swale profiling (1:2 to 1:4 slopes)
  • Secondary rock breaking and demolition using a 1,800 kg class hydraulic breaker hammer
  • Spreading, back-blading, pad levelling, and pipe zone aggregate distribution
  • Trench shield handling and pipe crane lifting under AS 1418.8 / AS 2550.1

Illustrations featuring the Vaultix civil livery. Machine geometry, tracks, boom configuration, and attachments represent typical Australian civil specifications.

Class planning guide

Published manufacturer specifications for the Cat 320 Next Gen / 20-23 t class crawler hydraulic excavator. Use supplier specifications for exact procurement.

Class planning values
RefItemValuePlanning note
01.01Operating mass21,900 kg (equipped) / 20,800 kg (base)Standard reach configuration with 5.7 m boom, R2.9 stick, 1.19 m³ HD bucket and 600 mm shoes.
01.02Engine net power128.5 kW (172 hp)Cat C4.4 turbocharged 4-cylinder engine at 2,200 rpm; Tier 4 Final / EU Stage V compliant.
01.03Standard bucket1.19 m³ (1,200 mm width)ISO heaped capacity; standard Heavy Duty bucket with side cutters.
01.04Maximum dig depth6,720 mm (6.72 m)Maximum vertical digging depth with standard 5.7 m boom and 2.9 m stick.
01.05Fuel allowanceAbout 10 to 20 L/hr14.4 L/hr medium civil duty adopted in rate proxy; idle and duty cycles affect burn.
01.06Shipping massAbout 21.6 t equipped / 20.7 t bareOperating mass less fuel and operator (derived). Requires tri-axle/quad-axle float.
Choosing the machine
RefItemValuePlanning note
02.01Bulk earthworks1.19 m³ bucket & 161 kN boostHigh breakout force and fast 20-22 s cycle times for bulk bench cutting.
02.02Trenching & servicesLaser / 3D Grade control & 6.72 m depthDeep vertical wall capability (5.19 m) and level bottom trenching (6.55 m).
02.03Truck loadingHigh dump height (6.52 m)Easily clears 10-wheel tippers and truck-and-dog combinations from bench.
02.04Pipe & box liftingAS 1418.8 crane safety packageFactory check valves, rated lift eye and acoustic overload alarm for pipe laying.
02.05Transport2.98 m width / Class 1 OSOMRequires NHVR Class 1 Oversize Notice and drop-deck float (4.06 m loaded height).

Dimensions and transport planning

Machine dimensions exclude the transport float trailer. Obtain verified deck height, loaded envelope, axle group weights, route clearance and restraint plans from haulier before mobilisation.

20 t Hydraulic Excavator: Illustrative low-loader arrangement
Fig T01Illustrative low-loader float arrangementScale NTS Source: Vaultix illustrative render. Sources and assumptions
Machine only, excludes trailer (Cat 320 reference)
CodeDimensionPublished valuePlanning note
AShipping height (top of cab)2,960 mmMeasured with standard 600 mm shoes. Height with FOGS structure is 3,100 mm.
BShipping height (boom transport peak)3,160 mmGoverns transport clearance over float deck (900 mm deck + 3.16 m = 4.06 m total).
CShipping length9,530 mmOverall machine length with reach boom, R2.9 stick, and bucket resting flat.
DTail swing radius2,830 mmSlew counterweight clearance boundary from centre of rotation.
ECounterweight clearance1,050 mmGround clearance under counterweight rear.
FGround clearance470 mmCentre clearance under carbody belly plate.
GTrack length4,450 mmOverall crawler track frame length from idler to sprocket tip.
HLength to center of rollers3,650 mmTumbler distance (centre of front idler to centre of drive sprocket).
ITrack gauge2,380 mmTransverse distance between crawler track centerlines.
JTransport width (600 mm shoes)2,980 mmTransverse width across outside edge of 600 mm shoes (2,380 mm gauge + 600 mm shoe = 2,980 mm).
KUpperframe width2,780 mmWidth across cab walkway and machinery house doors.
LHandrail height2,950 mmGround line to top of superstructure service walkway safety handrails.

Working range & kinematics

Working range and digging envelope with standard 5.7 m reach boom, 2.9 m stick, and 1.19 m³ HD bucket. Allow for trench shields, bench clearances, batter stability, and operator line-of-sight.

Working range envelope (Reach Boom 5.7 m, R2.9 Stick, 1.19 m³ HD bucket)
CodeWorking range itemPublished value
R1Maximum digging depth6,720 mm
R2Maximum reach at ground level9,860 mm
R3Maximum cutting height9,570 mm
R4Maximum loading height6,520 mm
R5Minimum loading height2,170 mm
R6Maximum depth cut for 2,440 mm level bottom6,550 mm
R7Maximum vertical wall digging depth5,190 mm
Cost planning

Direct cost and market hire prices

Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 20-23 t hydraulic excavator class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.

Metro and Remote direct costs

Location comparison (AUD ex GST)
Basis / AUD ex GSTMetroRemote
Direct dry / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Direct wet / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Excavator operator / paid site hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Delivered diesel / L1.94 (reference proxy)2.23 (reference proxy)
Maintenance, parts and freightBase allowanceBase plus 25%
Roster and campMetro working-week roster14/7 FIFO, 12-hour days, camp and flights

Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.

Mobilisation, separate one-off cost

Excluded from hourly costs
Purchased transport / AUD ex GSTMetroRemote
One delivery eventTo be quoted by haulierTo be quoted by haulier

Float mobilisation depends on transport distance, NHVR Class 1 Oversize permits (for 2.98 m transport width), escort requirements and drop-deck float availability. Allow separate return demobilisation event.

Published hire tariffs: market prices including supplier margin. AUD ex GST.
Source / dateHire basisPer hourPer dayPer weekConditions
Awaiting supplier tender verification
Status: Unquoted placeholder
Dry / Wet pending quotes Not yet quoted Not yet quoted Not yet quoted All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including 2D/3D machine guidance options, bucket packages, quick hitch compliance, fuel inclusion, wear terms and float costs.

First-principles direct hourly cost

Cost schedule / AUD ex GST
ComponentDirect dry AUD/hrDirect wet AUD/hr
Ownership: depreciation and interestNot yet quotedNot yet quoted
Insurance and registrationNot yet quotedNot yet quoted
Maintenance, servicing, tracks and GETNot yet quotedNot yet quoted
Fuel and operating lubricants (14.4 L/hr proxy)0.00Not yet quoted
Excavator operator cost per paid site hour0.00Not yet quoted
Direct cost per operating hourNot yet quotedNot yet quoted

Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.

Vaultix planning estimates

Productivity and calculator

Hourly Loose Output (LCM/hr) = (3,600 / cycle time sec) x bucket capacity m³ x fill factor x job efficiency; Bank Output (BCM/hr) = LCM/hr / (1 + swell). Governed by swing angle, dig depth, bench geometry, operator skill, and haul truck fleet matching. All cycle times, fill factors, and efficiency factors are Vaultix civil estimating assumptions.

Instrument / 01

Production scenario

LCM/hr

Scenario inputs

Hourly cost defaults to placeholder ($0.00). Enter your project-quoted wet hire or direct cost to calculate unit cost. All results are estimates.

Activity estimating guides

Vaultix civil estimating standard, 11 November 2026. Joint planning scenarios based on Caterpillar 320 Next Gen cycle times.

Low: conservative cycle time, dense material fill factor, lower job efficiency. High: fast swing cycle, heaped bucket fill, continuous production efficiency.

01Bulk excavation

Unrestricted bulk bench cut into native cohesive earth or granular soil, swinging 60° to 90° to spoil or stockpile. Standard 1.19 m³ HD bucket.

Vaultix assumptions: Cycle time 22 s; bucket 1.19 m³; fill factor 95%; efficiency 75%.

Worked example: (3,600 / 22) x 1.19 x 0.95 x 0.75 = 138.8 LCM/hr, or 111.0 BCM/hr (25% swell; 888 BCM per 8-hour shift).

Allow for: Bucket tooth penetration, bench edge cleanup, swing angle variations, and swell factor (25% swell assumed for BCM).

Pitfalls: Digging too deep beneath the track plane without stepping down benches causes excessive cycle times and boom strain.

02Trenching for services

Narrow trenching for deep stormwater pipelines, sewer mains, or civil utility corridors down to 3.0-5.0 m depth using 600-800 mm buckets.

Vaultix assumptions: Cycle time 35 s; bucket 0.65 m³; fill factor 85%; efficiency 60%.

Worked example: (3,600 / 35) x 0.65 x 0.85 x 0.60 = 34.2 LCM/hr, or 27.4 BCM/hr (25% swell; 219 BCM per 8-hour shift).

Allow for: Trench shield / shoring moves, laser grade staff checks, pipe layer coordination, and bedding gravel placement delays.

Pitfalls: Live underground utility strikes (mandatory BYDA potholing required) and trench wall slumping; ensure track placement is perpendicular to trench lip.

03Loading trucks

Excavator positioned on an elevated bench (1.5 to 2.5 m) loading 10-wheel tippers or truck-and-dog combinations with 60° to 90° swing.

Vaultix assumptions: Cycle time 20 s; bucket 1.19 m³; fill factor 100%; efficiency 72%.

Worked example: (3,600 / 20) x 1.19 x 1.00 x 0.72 = 154.2 LCM/hr, or 123.4 BCM/hr (25% swell; 987 BCM per 8-hour shift).

Allow for: Truck spotting, queue delays, heap profiling, tare weight limits, and payload distribution across axles.

Pitfalls: Truck queue mismatch causing excavator idle time; loading trucks at excessive swing angles (>120°) severely degrades hourly output.

04Batter trimming

Profiling and trimming cut/fill batters (1:2 to 1:4 slopes) to ±30 mm civil tolerance using a 1.8 m tilting batter bucket.

Vaultix assumptions: Cycle time 30 s; bucket 1.10 m³; fill factor 70%; efficiency 60%.

Worked example: (3,600 / 30) x 1.10 x 0.70 x 0.60 = 55.4 LCM/hr, or 44.4 BCM/hr (25% swell; 355 BCM per 8-hour shift).

Allow for: Frequent repositioning along batter crest, tilt bucket angle adjustments, and grade checker checks.

Pitfalls: Track slippage or soft crest slumping when working near slope edges; keep tracks aligned perpendicular to slope crest.

05Rock breaking with hammer

Secondary rock breaking and boulder reduction in hard or cemented rock formations using a 1,800 kg class hydraulic breaker.

Vaultix assumptions: Cycle time 35 s; equivalent chunk volume 0.30 m³; fill factor 85%; efficiency 55%.

Worked example: (3,600 / 35) x 0.30 x 0.85 x 0.55 = 14.4 LCM/hr, or 10.7 BCM/hr (35% swell; 85 BCM per 8-hour shift).

Allow for: Repositioning per boulder, point penetration, and mandatory 15-second rest bursts to avoid hydraulic fluid overheating.

Pitfalls: Continuous blank firing damages hammer pistons and tool bushings; dry firing overheats hydraulic seals.

06Dozing and spreading

Spreading dumped earth fill, pad back-blading, trench backfill distribution, and workfront tidying using bucket edge or front blade.

Vaultix assumptions: Cycle time 22 s; bucket 0.90 m³; fill factor 80%; efficiency 65%.

Worked example: (3,600 / 22) x 0.90 x 0.80 x 0.65 = 76.6 LCM/hr, or 61.3 BCM/hr (25% swell; 490 BCM per 8-hour shift).

Allow for: Bucket sweep angles, material spreading thickness control, and padfoot/smooth drum roller coordination.

Pitfalls: Spreading lifts too thick for following compaction equipment causes subgrade density test failures.

07Trench shield & pipe lifting

Handling trench shields and crane lifting precast concrete pipes or civil structures under AS 1418.8 / AS 2550.1 using certified lift eye and rigging.

Vaultix assumptions: Cycle time 75 s; equivalent handling volume 0.85 m³; fill factor 90%; efficiency 50%.

Worked example: (3,600 / 75) x 0.85 x 0.90 x 0.50 = 18.4 LCM/hr, or 14.7 BCM/hr (25% swell; 118 BCM per 8-hour shift).

Allow for: Licensed dogman coordination, certified lifting chains/slings, trench shield dragging, laser alignment, and bedding gravel placement.

Pitfalls: Exceeding rated capacity chart under AS 1418.8; slewing over personnel; lifting without secondary quick hitch positive visual lock pin confirmed.

Estimator checks

  • Confirm machine control fitment: factory Cat Grade 2D, Cat Grade 3D (dual GNSS antennas and radio modem), or aftermarket Trimble/Topcon systems substantially increase trenching and batter grading speed while reducing over-excavation.
  • Verify quick hitch compliance: machine must be fitted with a dual-locking quick hitch complying with AS 4772 / ISO 13031 with visual locking indicator and acoustic alarm.
  • Lifting and crane operations: when using the excavator to sling and install trench boxes or concrete pipes, ensure compliance with AS 1418.8 / AS 2550.1, including certified lift eye, rated SWL capacity chart, and boom/arm check valves.
  • Transport permits: 2.98 m width exceeds the 2.50 m general access limit and requires an NHVR Class 1 Oversize Notice with warning signs, safety flags, and amber beacon. Stripped shipping mass is derived at 20,711 kg and equipped mass is 21,561 kg; requires a tri-axle or quad-axle drop-deck float.
  • Loaded travel height: bare machine boom peak is 3.16 m; on a standard 900 mm drop-deck float, loaded height is 4.06 m, well within the standard 4.30 m bridge and overhead line envelope.
  • Ground bearing pressure: standard 600 mm shoes exert 47.3 kPa; evaluate whether 700 mm (41.2 kPa) or 790 mm (37.0 kPa) shoes, or hardwood swamp mats, are required for soft or tidal subgrades.
  • Hire rates: all rate schedules remain unquoted placeholders pending dated competitive tenders. Never invent hire rates.
  • Regional engine emissions: verify whether the tendered machine is the Tier 4 Final / Stage V build requiring Diesel Exhaust Fluid (39 L DEF tank) or a regional Tier 3 variant.
  • No HRWL class for earthmoving excavator; operator competency verified by VOC and national unit of competency (RIIMPO320F Conduct civil construction excavator operations).

Data basis. Reference model: Cat 320 Next Generation Hydraulic Excavator, OEM technical specification AEXQ2211-07 (5.7 m boom, R2.9 stick, 1.19 m³ HD bucket, 600 mm shoes). Sourced 11 November 2026. Fuel consumption telematics sourced from Caterpillar Performance Handbook (14.4 L/hr medium duty proxy). Productivity modeled via Vaultix cycle and bucket volume formulas. Hire rates remain unquoted placeholders pending verified project tenders. Sources and assumptions.

Notes / 0120 t Hydraulic Excavator / estimating referenceScale NTS Source: Vaultix plant library. Sources and assumptions

Entry / excavator-20t   Issue / 2026-11-11

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.