Plant / 4 to 6 t compact tracked hydraulic excavator

5-Tonne Mini Excavator

Compact radius 5-tonne tracked utility excavator for civil service trenching, pit excavation, confined urban corridors, and landscape grading. Class equivalents include Cat 305E2 CR (5.14 t Cab / 4.98 t Canopy), Kubota KX057-5 (5.60–5.71 t), Takeuchi TB260 (5.50–5.74 t), and Yanmar ViO50-6B (4.93–5.06 t). Confirm tail swing type (compact vs zero vs conventional), stick length, and auxiliary hydraulics.

5-Tonne Mini Excavator
  1. BucketMatch attachment and digging width to the confined excavation.
  2. Offset boomOffset and slew access influence working position.
  3. Front bladeAllow for grading and repositioning between tasks.
Illustrative Vaultix machine configuration. Consult the selected model’s data for dimensions and capacities.
Operating weight
5,140kg
Net power
30.0kW
Max dig depth
3.28m
Track width
1.98m
Direct wet cost
Not quoted yet
Hire rates need dated supplier quotes →

AUD ex GST. *Unquoted placeholder (Not yet quoted). In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.

General class information

Choosing this class of mini excavator

A 5 t class mini hydraulic excavator (4 to 6 t operating mass) is the primary utility excavation workhorse across Australian civil subdivisions, municipal drainage, underground services, and urban roadworks. Combining a 1.98 m track and dozer blade footprint, 1,100 mm compact radius tail swing (Derived: 1,100 − 1,980 / 2 = 110 mm track overhang), swing boom offset (80° left / 50° right), and twin auxiliary hydraulic circuits (80 L/min primary / 25 L/min secondary), the reference Cat 305E2 CR excavates to 3.28 m depth (3.67 m with long stick) while operating inside a single 3.5 m traffic lane. Productivity is modeled in loose cubic metres per hour (LCM/hr) from bucket capacity, cycle time, fill factor, and job efficiency.

Compact radius 5-tonne tracked utility excavator for civil service trenching, pit excavation, confined urban corridors, and landscape grading. Class equivalents include Cat 305E2 CR (5.14 t Cab / 4.98 t Canopy), Kubota KX057-5 (5.60–5.71 t), Takeuchi TB260 (5.50–5.74 t), and Yanmar ViO50-6B (4.93–5.06 t). Confirm tail swing type (compact vs zero vs conventional), stick length, and auxiliary hydraulics.

4 to 6 t class / 3.28 m dig depth (3.67 m Long Stick) / Compact radius (1.10 m tail) / Civil estimating guide

  • Service trench excavation (electrical, communications, water reticulation, gas and stormwater trenches to 1.0–2.5 m depth)
  • Stormwater gully pit, sewer maintenance shaft, pad footing, and strip footing excavation
  • Pipe bedding placement, haunching support, and select backfill spreading/levelling with 1,980 mm dozer blade
  • Landscape grading, topsoil spreading, swale profiling, and batter dressing with hydraulic tilting mud bucket
  • Careful potholing and hand-dig support around live underground utilities under spotter supervision
  • Light structural demolition, concrete footpath/driveway breakout (80 L/min auxiliary hammer circuit) and rubble load-out

Class planning guide

Published manufacturer specifications for the Cat 305E2 CR / 4 to 6 t class mini hydraulic excavator (Caterpillar Specalog AEHQ7738-01, pp. 1–4; Luxton Plant spec sheet, pp. 1–2). Use supplier specifications for exact procurement.

Class planning values
RefItemValuePlanning note
01.01Operating mass (Cab / Canopy, Std Stick)5,140 kg / 4,975 kgIncludes counterweight, 400 mm rubber belt tracks, bucket, operator (75 kg), full fuel, and auxiliary lines (AEHQ7738-01, p. 3; Luxton Plant spec, p. 1). Long stick: 5,185 kg Cab / 5,020 kg Canopy.
01.02Ground bearing pressure (Cab / Canopy)30.5 kPa / 29.5 kPa4.4 psi (Cab) / 4.3 psi (Canopy) with standard 400 mm rubber belt tracks (AEHQ7738-01, p. 3).
01.03Engine net power (ISO 9249 / EEC 80/1269)30.0 kW (40.2 hp)Cat C2.4 diesel (2.4 L, 87 × 102.4 mm bore × stroke) at 2,200 rpm; gross power ISO 14396 is 31.2 kW (41.8 hp). U.S. EPA Tier 4 Final / EU Stage IIIA, no DEF required (AEHQ7738-01, p. 3).
01.04Dig depth (Standard / Long Stick)3,280 mm / 3,670 mmMax vertical wall dig depth 2,320 mm (Standard Stick) / 2,630 mm (Long Stick) (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
01.05Breakout force (Bucket / Stick)44.7 kN / 24.7 kN44.7 kN (10,050 lbf) bucket breakout with 200° bucket rotation; 24.7 kN (5,550 lbf) stick crowd with standard stick or 21.3 kN (4,788 lbf) with long stick (AEHQ7738-01, pp. 3–4).
01.06Hydraulics (Main / Primary / Secondary Aux)150 / 80 / 25 L/min150 L/min @ 2,400 rpm load-sensing variable-displacement piston pump (245 bar equipment/travel, 216 bar swing); Primary aux 80 L/min @ 186 bar; Secondary aux 25 L/min @ 174 bar (AEHQ7738-01, p. 3).
01.07Travel speed, traction & slew speed4.4 & 2.8 km/h / 10.0 rpm4.4 km/h high (24.1 kN traction) / 2.8 km/h low (45.2 kN traction); 10.0 rpm slew; 80° left (60° with stop) / 50° right boom swing; 1,980 × 375 mm dozer blade with float (AEHQ7738-01, p. 3).
01.08Service refill capacities63.0 L fuel / 68.3 L hyd. tank63.0 L fuel tank, 68.3 L hydraulic tank refill, 10.5 L cooling system, 9.5 L engine oil (AEHQ7738-01, p. 3). Total hydraulic system oil volume including lines/cylinders is Not verified.
01.09Fuel burn allowance1.8 to 7.3 L/hr (4.6 L/hr Derived)Cat Performance Handbook (p. 2): Low 1.8–3.7 L/hr, Medium 3.7–5.5 L/hr, High 5.5–7.3 L/hr. Derived medium-duty planning midpoint: (3.7 + 5.5) / 2 = 4.6 L/hr.
01.10Shipping mass (Cab / Canopy, Std Stick)5,020 kg / 4,855 kg (Derived)Derived from AEHQ7738-01 (p. 3): Cab 5,140 kg − 75 kg operator − 47.6 kg (90% of 63 L fuel at 0.84 kg/L) = 5,017.4 kg (rounded to 5,020 kg); Canopy 4,975 − 75 − 47.6 = 4,852.4 kg (rounded to 4,855 kg).
01.11Standard bucket heaped capacityNot verifiedNot fixed as a single bucket size in Specalog AEHQ7738-01 (pp. 1–4); dealer packages span 0.08–0.18 m³. Confirm actual bucket plate on hire unit.
01.12Undercarriage ground clearance & gradeabilityNot verifiedOmitted from the 19-point dimension table in Specalog AEHQ7738-01 (pp. 3–4); confirm against Operation and Maintenance Manual.
01.13Protective certifications & soundROPS / TOPS / FOPS Level IROPS ISO 12117-2, TOPS ISO 12117, Top Guard FOPS ISO 10262 Level I; 81 dB(A) operator (ISO 6396:2008) / 96 dB(A) exterior (ISO 6395:2008) (AEHQ7738-01, p. 3).
Choosing the machine
RefItemValuePlanning note
02.01Confined urban corridors1,100 mm compact tail swingDerived 110 mm track overhang (1,100 − 1,980 / 2 = 110 mm) and Derived 3.45 m total 360° swing corridor (2,350 + 1,100 mm) fits a 3.5 m traffic lane (AEHQ7738-01, p. 3).
02.02Offset wall & kerb trenchingSwing boom (80° L / 50° R)695 mm left / 785 mm right boom offset allows parallel digging beside fences and footings (AEHQ7738-01, p. 3).
02.03Pipe & pit lifting (ISO 10567)2,340 kg front / 1,200 kg side @ 3.0 mDozer blade down at ground level, Standard Stick (AEHQ7738-01, p. 3); deduct bucket and quick-coupler mass (Not verified in spec sheet) from lift chart.
02.04Rock breaking & augering80 L/min primary auxiliary flowDrives 250–350 kg hydraulic breakers and foundation augers without external powerpacks (AEHQ7738-01, p. 3).
02.05Road transportTilt-tray or heavy tag trailer1.98 m width and 2.55 m height require no oversize permits in Australia (AEHQ7738-01, p. 3).

Dimensions and transport planning

Machine dimensions exclude the tilt-tray truck or tag trailer. No oversize permit is required in Australia (1.98 m width is within the 2.50 m general access limit, and 2.55 m machine height on a 0.80 m tag trailer or 1.10 m tilt-tray clears the 4.30 m statutory height limit). Confirm attachment mass and restraint plan with haulier before mobilisation.

Machine only, excludes trailer (Cat 305E2 CR reference, Specalog AEHQ7738-01, p. 3)
CodeDimensionPublished valuePlanning note
1Maximum dig depth (Standard Stick; 3,670 mm Long Stick)3,280 mmStandard stick 3,280 mm; optional long stick 3,670 mm (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
2Maximum vertical wall dig depth (Standard; 2,630 mm Long Stick)2,320 mmVertical trench face depth (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
3Maximum reach at ground level (Standard; 5,810 mm Long Stick)5,330 mmHorizontal ground-level reach from slew centre (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
4Maximum overall reach (Standard; 5,960 mm Long Stick)5,600 mmMaximum digging envelope radius (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
5Maximum dig height (Standard; 5,440 mm Long Stick)5,250 mmMaximum cutting height above ground (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
6Maximum dump clearance height (Standard; 3,920 mm Long Stick)3,720 mmClears bogie tipper bodies comfortably (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
7Boom in reach / min front swing radius (Standard; 2,530 mm Long)2,350 mmMinimum front swing arc with boom fully retracted (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
8Tail swing radius (Compact Radius; Derived 110 mm overhang)1,100 mmDerived overhang outside 1,980 mm tracks: 1,100 − (1,980 / 2) = 110 mm (AEHQ7738-01, p. 3).
9Maximum dozer blade lift height405 mmClearance above ground for travel and trailer loading (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
10Maximum dozer blade dig depth555 mmStabilising depth below grade (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
11Boom height in shipping position (Standard; 2,150 mm Long Stick)1,750 mmBoom lowered in transport posture (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
12Overall shipping height (top of cab / canopy)2,550 mmMachine height excluding deck; 3.35 m on 0.80 m tag trailer or 3.65 m on 1.10 m tilt-tray (AEHQ7738-01, p. 3).
13Swing bearing height615 mmGround to upper structure slew bearing (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
14Overall undercarriage length2,580 mmTrack length over front idler and rear sprocket (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
15Overall shipping length (Standard; 5,290 mm Long Stick)5,180 mmMachine transport length (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
16Boom swing offset — Right (50 degrees)785 mmRight-hand offset for parallel wall/kerb trenching (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
17Boom swing offset — Left (80 degrees without stop / 60 deg with stop)695 mmLeft-hand offset for parallel wall/kerb trenching (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
18Track belt / shoe width (standard rubber belt)400 mmStandard rubber belt track width (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
19Overall track width (and dozer blade width)1,980 mmWithin 2.50 m general road access limit (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
—Undercarriage minimum ground clearanceNot verifiedOmitted from the 19-point dimension table in Specalog AEHQ7738-01 (p. 3).

Working range & lift capacities

Digging envelope, confined-space slew geometry, and ISO 10567:2007 ground-level lift capacities for the Cat 305E2 CR (Standard Stick, 400 mm rubber tracks). Published lift capacities exclude bucket and quick-coupler weight (Not verified in spec sheet; deduct ~65–160 kg for hitch plus bucket/rigging weight).

Working envelope and ISO 10567 lift capacities
CodeWorking range / capacity itemPublished valuePlanning note
1Maximum dig depth — Standard Stick (Long Stick: 3,670 mm)3,280 mm (3,670 mm Long Stick)Practical flat-bottom service trenching depth is typically 65–75% of max depth (approx. 2.1 to 2.5 m with Standard Stick; AEHQ7738-01, p. 3).
2Maximum vertical wall dig depth — Standard Stick (Long Stick: 2,630 mm)2,320 mm (2,630 mm Long Stick)Vertical trench face excavation capability (AEHQ7738-01, p. 3).
3Maximum reach at ground level — Standard Stick (Long Stick: 5,810 mm)5,330 mm (5,810 mm Long Stick)Horizontal reach from slew centre at ground plane (AEHQ7738-01, p. 3).
4Maximum dump clearance height — Standard Stick (Long Stick: 3,920 mm)3,720 mm (3,920 mm Long Stick)Comfortably clears sideboards of 6-wheel and 10-wheel bogie tippers (AEHQ7738-01, p. 3).
5Confined-space 360-deg slew envelope (2,350 mm front + 1,100 mm rear)3,450 mm (Derived)Derived minimum 360-degree slew corridor: 2,350 mm boom-in reach + 1,100 mm tail swing radius = 3,450 mm (3.45 m), operable inside a single 3.5 m lane (AEHQ7738-01, p. 3).
L1Lift capacity @ 3.0 m radius — Dozer Down, Front (Side: 1,200 kg)2,340 kg Front / 1,200 kg SideISO 10567:2007 at ground level, Standard Stick, excluding bucket and quick-coupler weight (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
L2Lift capacity @ 3.0 m radius — Dozer Up, Front (Side: 1,070 kg)1,450 kg Front / 1,070 kg SideISO 10567:2007 tipping-governed capacity at ground level, Standard Stick, excluding bucket/coupler weight (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
L3Lift capacity @ 4.0 m radius — Dozer Down, Front (Side: 640 kg)1,260 kg Front / 640 kg SideISO 10567:2007 at ground level, Standard Stick, excluding bucket and quick-coupler weight (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
L4Lift capacity @ 4.0 m radius — Dozer Up, Front (Side: 570 kg)760 kg Front / 570 kg SideISO 10567:2007 tipping-governed capacity at ground level, Standard Stick, excluding bucket/coupler weight (AEHQ7738-01, p. 3; Luxton Plant spec, p. 2).
Cost planning

Direct cost and market hire prices

Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 4 to 6 t mini excavator class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.

Metro and Remote direct costs

Location comparison (AUD ex GST)
Basis / AUD ex GSTMetroRemote
Direct dry / hrNot yet quotedNot yet quoted
Direct wet / hrNot yet quotedNot yet quoted
Excavator operator / paid site hrNot yet quotedNot yet quoted
Delivered diesel / L1.94 (reference proxy)2.23 (reference proxy)
Maintenance, parts and freightBase allowanceBase plus 25%
Roster and campMetro working-week roster14/7 FIFO, 12-hour days, camp and flights

Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.

Mobilisation, separate one-off cost

Excluded from hourly costs
Purchased transport / AUD ex GSTMetroRemote
One delivery eventNot yet quotedNot yet quoted

Tilt-tray or heavy tag-trailer mobilisation depends on transport distance, bucket and attachment package (add 250–450 kg for bucket set and hydraulic rock breaker on deck), and site access. No oversize permits are required in Australia for the 1.98 m width and 2.55 m height. Allow separate return demobilisation event.

Published hire tariffs: market prices including supplier margin. AUD ex GST.
Source / dateHire basisPer hourPer dayPer weekConditions
Awaiting supplier tender verification
Status: Unquoted placeholder
Dry / Wet pending quotes Not yet quoted Not yet quoted Not yet quoted All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards covering wet/dry basis, minimum daily hours, bucket package (300/450/600 mm GP + 1,200 mm tilt mud bucket), rock breaker/auger attachments, and tilt-tray/tag-trailer delivery.

First-principles direct hourly cost

Cost schedule / AUD ex GST
ComponentDirect dry AUD/hrDirect wet AUD/hr
Ownership: depreciation and interestNot yet quotedNot yet quoted
Insurance and registrationNot yet quotedNot yet quoted
Maintenance, servicing, tracks and GETNot yet quotedNot yet quoted
Fuel and operating lubricants (Derived 4.6 L/hr medium-duty proxy)Not yet quotedNot yet quoted
Excavator operator cost per paid site hourNot yet quotedNot yet quoted
Direct cost per operating hourNot yet quotedNot yet quoted

Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.

Vaultix planning estimates

Productivity and calculator

Productivity model: LCM/hr = 3600 / cycle s × bucket m³ × fill × efficiency. Loose Volume Output (LCM/hr) is calculated from dig-slew-dump cycle time in seconds, heaped bucket capacity in m³, material bucket fill factor, and productive job efficiency. Bank volume (BCM/hr) depends on material swell factor. All cycle times, bucket volumes, fill factors, and efficiencies are Vaultix estimating assumptions requiring site calibration.

Instrument / 01

Production scenario

LCM/hr

Scenario inputs

Hourly cost defaults to placeholder ($0.00 / Not yet quoted). Enter your project-quoted wet hire or direct cost to calculate unit cost per LCM. All results are estimates.

Activity estimating guides

Vaultix estimating standards, 11 November 2026. Joint planning scenarios, not statistical confidence limits.

Low, Most Likely, and High outputs are calculated from LCM/hr = 3600 / cycle s × bucket m³ × fill × efficiency. Low scenario applies +25% cycle time, −15% fill factor, and −20% job efficiency; High scenario applies −15% cycle time, +10% fill factor, and +15% job efficiency.

01Service trench excavation

Excavating 300–600 mm wide electrical, communications, water or stormwater trenches to 1.0–2.2 m depth using a 300–450 mm GP trench bucket (0.11 m³ heaped).

Vaultix assumptions: Cycle time 19 s; bucket capacity 0.11 m³; fill factor 0.85; job efficiency 0.65.

Worked example (Derived): (3,600 / 19 s) × 0.11 m³ × 0.85 × 0.65 = 11.5 LCM/hr (Low: (3,600 / 23.75) × 0.11 × 0.7225 × 0.52 = 6.3 LCM/hr; High: (3,600 / 16.15) × 0.11 × 0.935 × 0.7475 = 17.1 LCM/hr).

Allow for: Laser level checks, bedding sand coordination, trench shoring/boxes where required, and frequent tracking along alignment.

Pitfalls: Trench width and depth over-excavation rapidly inflates imported bedding sand and backfill volumes; verify bucket width matches pipe specification.

02Pit and footing excavation

Excavating stormwater gully pits, sewer maintenance shafts, pad footings and strip footings using a 450–600 mm GP bucket (0.14 m³ heaped), stockpiling spoil or loading directly into a tipper.

Vaultix assumptions: Cycle time 20 s; bucket capacity 0.14 m³; fill factor 0.85; job efficiency 0.70.

Worked example (Derived): (3,600 / 20 s) × 0.14 m³ × 0.85 × 0.70 = 15.0 LCM/hr (Low: (3,600 / 25) × 0.14 × 0.7225 × 0.56 = 8.2 LCM/hr; High: (3,600 / 17) × 0.14 × 0.935 × 0.805 = 22.3 LCM/hr).

Allow for: Corner squaring, level checks, machine repositioning around pit perimeter, and tipper spotting.

Pitfalls: Reduced cycle efficiency in deep square corners and when working near maximum vertical wall depth (2,320 mm standard stick).

03Backfill support

Placing pipe bedding, haunch support and select backfill from stockpiles in 150–200 mm lifts using a 1,000–1,200 mm mud bucket (0.16 m³ heaped) and the 1,980 mm dozer blade.

Vaultix assumptions: Cycle time 16 s; bucket capacity 0.16 m³; fill factor 0.90; job efficiency 0.70.

Worked example (Derived): (3,600 / 16 s) × 0.16 m³ × 0.90 × 0.70 = 22.7 LCM/hr (Low: (3,600 / 20) × 0.16 × 0.765 × 0.56 = 12.3 LCM/hr; High: (3,600 / 13.6) × 0.16 × 0.99 × 0.805 = 33.8 LCM/hr).

Allow for: Compaction hold points, trench rammer or remote padfoot roller cycles, and moisture conditioning.

Pitfalls: Overall backfill production is usually governed by compaction layer thickness and density testing rather than excavator cycle speed.

04Landscape grading

Topsoil spreading, batter dressing, swale profiling and verge trimming using a 1,200–1,500 mm hydraulic tilting mud bucket (0.18 m³ heaped) with partial bucket fills for skim grading.

Vaultix assumptions: Cycle time 18 s; bucket capacity 0.18 m³; fill factor 0.75; job efficiency 0.70.

Worked example (Derived): (3,600 / 18 s) × 0.18 m³ × 0.75 × 0.70 = 18.9 LCM/hr (~125–190 m²/hr at 100–150 mm topsoil thickness; Low: (3,600 / 22.5) × 0.18 × 0.6375 × 0.56 = 10.3 LCM/hr; High: (3,600 / 15.3) × 0.18 × 0.825 × 0.805 = 28.1 LCM/hr).

Allow for: Secondary auxiliary circuit (25 L/min) tilt-bucket articulation, stringline/laser checks, and dozer blade float finishing.

Pitfalls: Track scuffing on finished topsoil if turning sharply; use smooth travel movements and work backwards off completed surfaces.

05Hand-dig support

Careful potholing and excavation around live underground utilities (fibre optic, gas, high-voltage power, water mains) under direct spotter control and vacuum-truck/hand-shovel verification.

Vaultix assumptions: Cycle time 30 s; bucket capacity 0.09 m³; fill factor 0.60; job efficiency 0.40.

Worked example (Derived): (3,600 / 30 s) × 0.09 m³ × 0.60 × 0.40 = 2.6 LCM/hr (Low: (3,600 / 37.5) × 0.09 × 0.51 × 0.32 = 1.4 LCM/hr; High: (3,600 / 25.5) × 0.09 × 0.66 × 0.46 = 3.9 LCM/hr).

Allow for: Dedicated spotter, toothless gum-edge bucket, electronic service locator sweeps, and permit-to-dig hold points.

Pitfalls: Output is deliberately constrained by statutory asset exclusion zones; never price live-service exposure at open-trench production rates.

06Demolition

Breaking and loading out 100–200 mm concrete footpaths, kerb and channel, driveways, and light masonry structures using the 80 L/min primary auxiliary circuit (250–350 kg hydraulic breaker) alternating with a GP/thumb bucket.

Vaultix assumptions: Cycle time 26 s; bucket capacity 0.11 m³; fill factor 0.65; job efficiency 0.55.

Worked example (Derived): (3,600 / 26 s) × 0.11 m³ × 0.65 × 0.55 = 5.4 LCM/hr of broken rubble (Low: (3,600 / 32.5) × 0.11 × 0.5525 × 0.44 = 3.0 LCM/hr; High: (3,600 / 22.1) × 0.11 × 0.715 × 0.6325 = 8.1 LCM/hr).

Allow for: Attachment changeovers between hydraulic hammer and bucket, dust suppression misting, and high-duty fuel burn (5.5–7.3 L/hr).

Pitfalls: Heavy reinforcement mesh or slab thickness >200 mm significantly slows breaker penetration and increases chisel wear.

07Stockpile spoil load-out to tipper

Rehandling loose excavated spoil or imported quarry materials from stockpiles directly into 6-wheel and 10-wheel bogie tippers (3,720 mm standard stick dump clearance) using a 600 mm GP or 1,200 mm mud bucket (0.17 m³ heaped).

Vaultix assumptions: Cycle time 15 s; bucket capacity 0.17 m³; fill factor 0.95; job efficiency 0.75.

Worked example (Derived): (3,600 / 15 s) × 0.17 m³ × 0.95 × 0.75 = 29.1 LCM/hr (Low: (3,600 / 18.75) × 0.17 × 0.8075 × 0.60 = 15.8 LCM/hr; High: (3,600 / 12.75) × 0.17 × 1.045 × 0.8625 = 43.3 LCM/hr).

Allow for: Truck spotting, traffic control corridor gates, and pad preparation to keep slewing angles under 90°.

Pitfalls: Waiting on tipper exchange cycles or loading over high tailgates without a raised bench reduces net hourly output.

Estimator checks

  • Confirm stick configuration: Standard Stick (3,280 mm dig depth, 24.7 kN stick crowd force) vs Long Stick (3,670 mm dig depth, 21.3 kN crowd force, +45 kg mass) (AEHQ7738-01, p. 3).
  • Verify bucket and attachment package: Specalog AEHQ7738-01 does not fix a single standard bucket volume (Not verified); Australian hire units typically supply 300/450/600 mm GP buckets (0.08–0.17 m³) and a 1,200 mm mud bucket (0.18–0.22 m³).
  • Check auxiliary hydraulic requirements: Primary circuit delivers 80 L/min @ 186 bar (1-way hammer / 2-way auger); Secondary circuit delivers 25 L/min @ 174 bar (tilting hitch / thumb) (AEHQ7738-01, p. 3).
  • Lifting deductions: Published ISO 10567 lift capacities (e.g. 2,340 kg front / 1,200 kg side at 3.0 m dozer down) exclude quick-coupler and bucket mass (Not verified in spec sheet; deduct ~65–160 kg for hitch plus bucket/rigging weight).
  • Confined-space safety: Compact radius tail swing (1,100 mm radius) still overhangs the 1,980 mm rubber tracks by Derived 110 mm on each side when slewing at 90° (1,100 − 1,980 / 2 = 110 mm); maintain a physical exclusion zone around the counterweight and 2,350 mm front swing arc.
  • Transport: No oversize permit required in Australia (1.98 m width, 2.55 m height, 5.18 m length, Derived shipping mass 5,020 kg Cab / 4,855 kg Canopy). Typically moved on a rigid tilt-tray or heavy tag trailer.
  • Hire rates: All wet/dry hourly rates and mobilisation figures remain unquoted placeholders (null / Not yet quoted) per Vaultix estimating governance.
  • No HRWL class required for excavator operation; competency verified by RIIMPO320F and site VOC (WorkSafe QLD, p. 1).

Needs review & unverified items log

Items marked Not verified or Not yet quoted in primary OEM data sheets
RefItemStatusVerification note
NR-01Standard bucket heaped capacity (m³) and widths (mm)Not verifiedNot fixed as a single bucket size in Specalog AEHQ7738-01 (pp. 1–4); calculator uses 0.08–0.18 m³ class planning assumptions. Confirm actual bucket plate volumes on hired unit.
NR-02Undercarriage minimum ground clearance (mm)Not verifiedOmitted from the 19-point dimension table on p. 3 of AEHQ7738-01. Confirm against the Operation and Maintenance Manual (OMM).
NR-03Maximum gradeability (degrees / %)Not verifiedNot published in AEHQ7738-01 (pp. 3–4). Confirm continuous slope limit in the OMM before steep batter work.
NR-04Total hydraulic system oil volume (L)Not verifiedAEHQ7738-01 (p. 3) lists 68.3 L hydraulic tank refill capacity, but omits total system volume including lines, cylinders, and auxiliary circuits.
NR-05Quick-coupler & tilt-hitch weight deduction (kg)Not verifiedISO 10567 lift capacities on p. 3 of AEHQ7738-01 exclude bucket and quick-coupler weight. Deduct actual hitch (~65–160 kg) and bucket mass for lift plans.
NR-06Commercial wet/dry hire rates & mobilisation (AUD ex GST)Not yet quotedIn strict compliance with Vaultix governance, no hire rates are invented. Obtain formal supplier quotations for wet/dry hire and tilt-tray/tag-trailer delivery.

Data basis. Reference model: Cat 305E2 CR Mini Hydraulic Excavator with Swing Boom (Cab, Standard Stick, 400 mm rubber tracks, 1,980 mm dozer blade), Caterpillar Specalog AEHQ7738-01 (pp. 1–4) (Cat Scene7 mirror, pp. 1–4) and Luxton Plant spec sheet (pp. 1–2). Sourced 11 November 2026. Fuel burn uses Caterpillar Performance Handbook (p. 2) medium-duty midpoint (Derived: (3.7 + 5.5) / 2 = 4.6 L/hr). Licensing verified against WorkSafe QLD (p. 1). Productivity uses Vaultix cycle-based LCM/hr estimating model. Hire rates remain unquoted placeholders (null / Not yet quoted). Sources and assumptions.

Notes / 015 t Mini Excavator / estimating referenceScale NTS Source: Vaultix plant library. Sources and assumptions

Entry / excavator-mini-5t   Issue / 2026-11-11

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.