Plant / 15 to 25 t pneumatic multi-tyre roller

20-Tonne Multi-Tyre Roller

The benchmark pneumatic multi-tyre compactor for asphalt intermediate and finish sealing, sprayed seal chip embedment, and granular base kneading.

20-Tonne Multi-Tyre Roller
  1. Pneumatic tyresPressure and ballast govern contact conditions.
  2. Ballast bodyConfirm the agreed working configuration.
  3. Operator stationAllow for turning and overlap in the rolling pattern.
Illustrative Vaultix machine configuration. Consult the selected model’s data for dimensions and capacities.
Rolling width
2.04m
Operating weight
20,000kg
Not verified
Direct wet cost
Not quoted yet
Hire rates need dated supplier quotes →

AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.

General class information

Choosing this class of multi-tyre roller

A 15-25 t ballasted class pneumatic multi-tyre roller (such as the BOMAG BW 27 RH) is the benchmark compaction and kneading machine across Australian road construction and asphalt surfacing. Equipped with 8 smooth compaction tyres (4 front oscillating, 4 rear driven with 42 mm track overlap), hydrostatic dual hydraulic motor rear axle drive, a 100 kW Deutz engine, a 3.5 m³ ballast compartment, and a 400 L pressurised water sprinkler, it delivers tailored ground contact pressure (2.0 to 8.1 bar) for asphalt sealing, chip embedment, and granular base interlock. Compaction productivity is modeled by compacted surface area (m²/hr) or compacted volume (m³/hr) governed by rolling speed, compaction width (2.042 m), required pass count, lift thickness, and site efficiency.

The benchmark pneumatic multi-tyre compactor for asphalt intermediate and finish sealing, sprayed seal chip embedment, and granular base kneading.

15 to 25 t class / 2,042 mm rolling width / Multi-tyre roller / Civil estimating guide

  • Intermediate and finish rolling of dense-graded asphalt courses (AC10, AC14, AC20) to seal surface voids and eliminate microcracks
  • Sprayed chip seal rolling behind aggregate spreader to re-orient aggregate onto its flat face without crushing stone
  • Granular road base kneading (e.g. 150 mm crushed rock / DGB20 / Type 2.1) to interlock flaky aggregates and tighten matrix
  • In-situ cement, lime, or slag stabilized pavement finish rolling to close surface shearing tears before initial set
  • Cold-mix and foamed bitumen stabilized base (FBSB) layer compaction to expel moisture and orient bitumen mastic
  • Subgrade proof rolling and deflection testing to expose soft spots under high concentrated wheel loads
  • Industrial pavement and airport runway asphalt surfacing requiring tight void closure

Illustrations featuring the Vaultix civil livery. Machine geometry, articulation, and attachments represent typical Australian civil specifications.

Class planning guide

Published manufacturer specifications for the BOMAG BW 27 RH / 15-25 t class pneumatic multi-tyre roller. Use supplier specifications for exact procurement.

Class planning values
RefItemValuePlanning note
01.01Operating mass20,000 kg (typical ballasted) / 13,600 kg (unballasted)Derived: 13,600 kg unballasted + 6,400 kg ballast (3.5 m³ sand) = 20,000 kg nominal civil roadworks setup. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
01.02Maximum operating mass27,000 kg (max ballast)Max permissible operating weight with dense ballast (magnetite or steel scrap). Max ballast about 13,100 kg (largest granulate option) (Derived: 27,000 kg - 13,600 kg). Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
01.03Compaction width2,042 mm8 smooth compaction tyres (4 front, 4 rear) with 42 mm track overlap for gapless surface kneading. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
01.04Mean wheel loadNot verified (depends on tyre count)Derived: 20,000 kg / 8 = 2,500 kg/tyre. At 27,000 kg max weight = 3,375 kg/tyre (Derived: 27,000 kg / 8). Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
01.05Engine power100 kW (134 hp)Deutz TCD 2012 L04 2V turbocharged 4-cylinder diesel at 2,300 rpm (Stage IIIa / Tier 3; no DEF required). Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
01.06Tyre air pressure range2.0 to 8.1 bar (200 to 810 kPa)Pushbutton modulation via optional factory Central Tyre Inflation System (Air-on-the-Run). Source: https://www.bomag.com / Technical Data PRE 99 400 001 pp. 2–3
01.07Fuel allowanceAbout 7.5 to 17.5 L/hr12.5 L/hr civil roadworks medium duty used in planning; 250 L fuel tank provides ~18.5 hours continuous rolling. Source: Telematics & Deutz 100 kW engine load factor.
01.08Shipping massAbout 13,400 kgDerived: 13,600 kg CECE operating weight less 75 kg operator and fluid allowance (~125 kg) = 13,400 kg unballasted dry transport mass. Excludes float trailer. Ballast must be completely emptied before float transport. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
Choosing the machine
RefItemValuePlanning note
02.01Asphalt intermediate rolling550 to 750 kPa / 18-22 t ballastKneads mix horizontally to close void structure without crushing aggregates; operates behind breakdown steel drum.
02.02Sprayed seal embedment450 to 600 kPa / 15-18 t ballastContours around stone chips to re-orient aggregate onto flat face without fracturing aggregate edges.
02.03Granular base kneading300 to 500 kPa / 20-25 t ballastDeep horizontal kneading shear forces knit unbound crushed rock and eliminate laminations.
02.04Water sprinkler system400 L pressurised electric sprinklerDual spray bars with individual tyre nozzles and cocoa mats prevent hot asphalt pick-up.
02.05TransportDrop-deck low loader float2.10 m width and 3.09 m height allow general access highway transit without NHVR oversize permits. Must travel unballasted.

Dimensions and transport planning

Machine dimensions exclude the transport float trailer. Obtain verified deck height, loaded envelope, axle group weights, route clearance and restraint plans from haulier before mobilisation.

20 t Multi-Tyre Roller: Illustrative low-loader arrangement
Fig T01Illustrative low-loader float arrangementScale NTS Source: Vaultix illustrative render. Sources and assumptions
Machine only, excludes trailer (BOMAG BW 27 RH reference)
CodeDimensionPublished valuePlanning note
AWheelbase3,700 mmCenterline front axle to centerline rear drive axle. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
BOverall width2,098 mmMaximum overall machine width across chassis and outer tyre sidewalls. General access boundary. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
HHeight without cabin / ROPS2,840 mmHeight to top of steering console / folding frame. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
H2Height with ROPS cabin3,090 mmGround line to top of ROPS/FOPS cabin roof beacon / structure. Excludes float deck. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
KGround clearance300 mmLowest chassis ground clearance under central frame. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
LOverall length4,940 mmBumper to bumper overall length. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
WCompaction / working width2,042 mmStandard rolling width covered across 8 compaction tyres. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
OverlapWheel track overlap42 mmOffset overlap between front and rear tyre tracks ensuring complete gapless surface kneading. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
R1Inner track radius5,320 mmTurning radius measured to inside wheel track at full steering articulation. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2
R2Outer turning radius (derived)7,362 mmDerived: 5,320 mm inner radius + 2,042 mm working width = 7,362 mm outside turning radius. Source: https://www.bomag.com / Technical Data PRE 99 400 001 p. 2

Working range & kinematics

Operational geometry, ballast capacity, ground contact pressures, and steering kinematics for the BOMAG BW 27 RH 20 t pneumatic multi-tyre roller. Ballast media payload and tyre pressure settings govern compaction performance and site manoeuvrability.

Geometric planning limits and capacities
CodeKinematic range itemPublished value
1Compaction path width2,042 mm
2Wheel track overlap42 mm
3Inner turning radius5,320 mm
4Outer turning radius (derived)7,362 mm (Derived: 5,320 mm inner radius + 2,042 mm working width = 7,362 mm)
5Chassis ground clearance300 mm
6Ballast compartment volume3.5 m³
7Water sprinkler tank capacity400 L
8Operating mass range (unballasted to max ballast)13,600 kg to 27,000 kg
9Mean wheel load range (unballasted to max ballast)1,700 kg to 3,375 kg (Derived: 13,600 kg / 8 to 27,000 kg / 8)
10Tyre contact pressure range200 to 810 kPa (2.0 to 8.1 bar)
11Steering articulation angle±30 degrees
12Maximum travel speed20.0 km/h
Cost planning

Direct cost and market hire prices

Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 15-25 t pneumatic multi-tyre roller class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.

Metro and Remote direct costs

Location comparison (AUD ex GST)
Basis / AUD ex GSTMetroRemote
Direct dry / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Direct wet / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Roller operator / paid site hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Delivered diesel / L1.94 (reference proxy)2.23 (reference proxy)
Maintenance, parts and freightBase allowanceBase plus 25%
Roster and campMetro working-week roster14/7 FIFO, 12-hour days, camp and flights

Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.

Mobilisation, separate one-off cost

Excluded from hourly costs
Purchased transport / AUD ex GSTMetroRemote
One delivery eventTo be quoted by haulierTo be quoted by haulier

Float mobilisation depends on transport distance, route permits, and float deck availability. Machine dimensions (2.10 m width, 3.09 m height, ~13.4 t unballasted shipping mass) comply with standard Australian general access limits without NHVR oversize permits. Mandatory requirement: All ballast must be completely drained or emptied prior to transport. Allow separate return demobilisation event.

Published hire tariffs: market prices including supplier margin. AUD ex GST.
Source / dateHire basisPer hourPer dayPer weekConditions
Awaiting supplier tender verification
Status: Unquoted placeholder
Dry / Wet pending quotes Not yet quoted Not yet quoted Not yet quoted All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including CTIS (Central Tyre Inflation System), thermal apron fitment, water sprinkler system, fuel inclusion, and float transport costs.

First-principles direct hourly cost

Cost schedule / AUD ex GST
ComponentDirect dry AUD/hrDirect wet AUD/hr
Ownership: depreciation and interestNot yet quotedNot yet quoted
Insurance and registrationNot yet quotedNot yet quoted
Maintenance, servicing, tyres and wear partsNot yet quotedNot yet quoted
Fuel and operating lubricants (12.5 L/hr proxy)0.00Not yet quoted
Roller operator cost per paid site hour0.00Not yet quoted
Direct cost per operating hourNot yet quotedNot yet quoted

Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.

Vaultix planning estimates

Productivity and calculator

Hourly Compacted Area m²/hr = (Speed km/h x 1,000 x Rolling Width m x Efficiency) / Passes, with ballast and tyre-pressure settings noted. Single-Pass Rate m²/hr = Speed km/h x 1,000 x Rolling Width m x Efficiency. Linear Advance km/hr = (Speed km/h x Efficiency) / Passes. Mean Wheel Load kg/wheel = (Ballast Mass t x 1,000) / 8 tyres. All operating parameters are Vaultix estimating assumptions.

Instrument / 01

Production scenario

m²/hr

Scenario inputs

Hourly cost defaults to placeholder ($0.00). Enter your project-quoted wet hire or direct cost to calculate unit cost per m². Ballast mass and tyre inflation pressure configure ground contact pressure for each application. All results are estimates.

Activity estimating guides

Vaultix compaction model, 9 November 2026. Joint civil roadworks planning scenarios, not statistical confidence limits.

Low: travel speed x 0.85, rolling width x 0.90, efficiency x 0.80, passes x 1.20. High: travel speed x 1.15 (cap 20.0 km/h), rolling width x 1.00 (2.042 m), efficiency x 1.10 (cap 1.00), passes x 0.85 (min 1).

01Asphalt intermediate / finish rolling

Intermediate and finish asphalt rolling behind steel breakdown roller to knead mix, close surface voids, eliminate microcracks, and achieve 3% to 5% target air voids within the 80°C to 130°C temperature window.

Vaultix assumptions: Speed 6.0 km/h; rolling width 2.042 m; 8 passes; efficiency 75%; ballast 20.0 t (2,500 kg/wheel); tyre pressure 600 kPa (6.0 bar).

Worked example: (6.0 x 1,000 x 2.042 x 0.75) / 8 = 1,149 m²/hr (approx. 9,189 m² in an 8-hour shift). Net advance: 0.56 linear km/hr. Mean wheel load: 2,500 kg at 600 kPa tyre pressure.

Allow for: 8 passes, water sprinkler misting with release agent, heated tyre aprons for cool weather, and synchronized paver pacing.

Pitfalls: Rolling cold asphalt (<80°C) risks decompaction; dry or unheated tyres cause severe hot bitumen pick-up and surface tear.

02Sprayed seal rolling

Rapid rolling immediately behind aggregate spreader to embed cover aggregate into hot bitumen binder before binder skins or cools, re-orienting stone onto its flat face without crushing.

Vaultix assumptions: Speed 7.0 km/h; rolling width 2.042 m; 6 passes; efficiency 80%; ballast 16.0 t (2,000 kg/wheel); tyre pressure 500 kPa (5.0 bar).

Worked example: (7.0 x 1,000 x 2.042 x 0.80) / 6 = 1,906 m²/hr (approx. 15,247 m² in an 8-hour shift). Net advance: 0.93 linear km/hr. Mean wheel load: 2,000 kg at 500 kPa tyre pressure.

Allow for: 4 to 6 full-cover passes per Austroads / state road agency specifications (e.g. MRTS11, TfNSW R106), close tracking behind spreader, and tyre pressure adjusted to 450–550 kPa.

Pitfalls: Delayed rolling after aggregate spread results in poor chip embedment and stone stripping under traffic; excessive wheel load shatters soft aggregate.

03Granular base kneading

Deep kneading and horizontal shear compaction of unbound crushed rock road base (e.g. 150 mm Class 1 / DGB20 / Type 2.1) using ballasted 20-24 t mass and lowered tyre pressure (350-450 kPa) to interlock aggregates and eliminate shear planes.

Vaultix assumptions: Speed 4.5 km/h; rolling width 2.042 m; 8 passes; efficiency 75%; ballast 24.0 t (3,000 kg/wheel); tyre pressure 400 kPa (4.0 bar).

Worked example: (4.5 x 1,000 x 2.042 x 0.75) / 8 = 861 m²/hr (approx. 6,892 m² in an 8-hour shift). Net advance: 0.42 linear km/hr. Mean wheel load: 3,000 kg at 400 kPa tyre pressure.

Allow for: 8 passes, coordination with grader or trimmer spreading, water cart slurry misting, and surface level dipping.

Pitfalls: Rolling over-wet base induces pore pressure and pumping; rolling dry base causes aggregate segregation and ravelling.

04Stabilised pavement finishing

Smooth finish rolling of in-situ cement, lime, or slag stabilized pavement layers (200-250 mm) behind reclaimer/stabiliser and grader final trim to knit together hairline shear fissures and close blade tear marks.

Vaultix assumptions: Speed 5.0 km/h; rolling width 2.042 m; 6 passes; efficiency 72%; ballast 22.0 t (2,750 kg/wheel); tyre pressure 450 kPa (4.5 bar).

Worked example: (5.0 x 1,000 x 2.042 x 0.72) / 6 = 1,225 m²/hr (approx. 9,802 m² in an 8-hour shift). Net advance: 0.60 linear km/hr. Mean wheel load: 2,750 kg at 450 kPa tyre pressure.

Allow for: 4 to 6 passes completed within strict 2-hour hydration window following binder incorporation, water cart curing spray, and nuclear density gauge testing.

Pitfalls: Compacting past binder initial set breaks crystalline cement matrix, causing permanent strength reduction and surface flaking.

05Cold-mix / foamed bitumen layers

Pneumatic tyre kneading of cold emulsion and foamed bitumen stabilized base (FBSB) courses (125-200 mm) applying uniform high contact pressure to expel moisture and orient bitumen droplets around aggregate particles.

Vaultix assumptions: Speed 4.0 km/h; rolling width 2.042 m; 8 passes; efficiency 75%; ballast 22.0 t (2,750 kg/wheel); tyre pressure 450 kPa (4.5 bar).

Worked example: (4.0 x 1,000 x 2.042 x 0.75) / 8 = 766 m²/hr (approx. 6,126 m² in an 8-hour shift). Net advance: 0.38 linear km/hr. Mean wheel load: 2,750 kg at 450 kPa tyre pressure.

Allow for: 8 passes, monitoring moisture evaporation, coordination with recycling train, and heavy ballasting (20-24 t).

Pitfalls: Insufficient pneumatic kneading leads to low early shear strength and post-construction deformation under heavy axle loads.

06Subgrade and sub-base proof rolling

Heavy pneumatic proof rolling across subgrade and sub-base formations using high ballasted mass (24-27 t, >3,000 kg/wheel) and elevated tyre pressure (600-700 kPa) to detect sub-surface deflection, soft spots, and uncompacted zones under statutory test rolling specs.

Vaultix assumptions: Speed 5.0 km/h; rolling width 2.042 m; 4 passes; efficiency 70%; ballast 25.0 t (3,125 kg/wheel); tyre pressure 700 kPa (7.0 bar).

Worked example: (5.0 x 1,000 x 2.042 x 0.70) / 4 = 1,787 m²/hr (approx. 14,294 m² in an 8-hour shift). Net advance: 0.88 linear km/hr. Mean wheel load: 3,125 kg at 700 kPa tyre pressure.

Allow for: 3 to 4 full coverage passes per Austroads / AS 3798 test rolling protocols, geometric overlap tracking, and engineering inspection flagging.

Pitfalls: Proof rolling over-saturated clays causes severe subgrade shearing and rutting; roller must maintain constant slow rolling without abrupt braking or sharp turns.

07Dense-graded asphalt wearing course kneading

High-specification dense-graded asphalt (AC10 / AC14) surfacing and polymer-modified binder (PMB) kneading behind the paver to achieve tight surface texture, eliminate permeability, and meet strict 93-97% density specs without crushing aggregate.

Vaultix assumptions: Speed 5.5 km/h; rolling width 2.042 m; 10 passes; efficiency 75%; ballast 20.0 t (2,500 kg/wheel); tyre pressure 650 kPa (6.5 bar).

Worked example: (5.5 x 1,000 x 2.042 x 0.75) / 10 = 842 m²/hr (approx. 6,739 m² in an 8-hour shift). Net advance: 0.41 linear km/hr. Mean wheel load: 2,500 kg at 650 kPa tyre pressure.

Allow for: 8 to 10 passes, heated tyre aprons in cooler weather, continuous water/soap sprinkler spray, and paver matching.

Pitfalls: Tyre cooling causes polymer binder pick-up and gouging; excessive speed leads to mix shoving and horizontal displacement.

Estimator checks

  • Verify ballast media and operating weight: 3.5 m³ ballast compartment allows machine mass to range from 13.6 t unballasted to 27.0 t with dense ballast. 20.0 t is the civil roadworks benchmark.
  • Ballast transport rule: Ballast compartment must be completely emptied/drained prior to float transport; transporting ballasted rollers overloads float axles and introduces severe liquid/granular surge hazards.
  • Tyre pressure modulation: Compaction efficacy is governed by wheel load and tyre pressure (2.0 to 8.1 bar / 200 to 810 kPa). Low pressure for granular base kneading; high pressure for asphalt and sprayed seal embedment.
  • Confirm Central Tyre Inflation System (CTIS): Check if hire unit includes in-cab CTIS (Air-on-the-Run) for on-the-fly pressure adjustments between granular base and asphalt layers.
  • Thermal aprons for asphalt paving: When rolling polymer-modified asphalt in cool conditions (<15°C), verify thermal tyre blankets are fitted to retain tyre heat and prevent pick-up.
  • Sprinkler system and release agents: Ensure 400 L water sprinkler pump and spray nozzles are operating; use approved biodegradable release agents to prevent hot asphalt pick-up.
  • Transport dimensions: 2.10 m width, 3.09 m height, 4.94 m length, and ~13.4 t dry shipping mass operate within general access float limits without oversize permits.
  • All hire rate schedules are unquoted placeholders. In accordance with Vaultix estimating principles, never invent hire rates without formal supplier tenders.
  • Output is area-governed (m²/hr) and layer volume-governed (m³/hr), not bucket payload. Balance roller coverage with asphalt paver rate, aggregate spreader pace, and water cart delivery.
  • No HRWL class required; operator competency confirmed by VOC and RIIMPO317F (Conduct roller operations).

Data basis. Corrected 10 November 2026 against the Bomag BW 24 RH / 27 RH data sheet: maximum ballast is the sheet figure, gear 1 speed is 7.0 km/h, overall width is 2,098 mm. Not verified (not on any sheet found): tyre count and wheel loads, basic machine weight, electrical voltage and engine displacement. The earlier source citation (PRE 99 400 001) could not be traced; the real sheet is PRE 538 xx 010. Reference model: BOMAG BW 27 RH Pneumatic Tyred Roller, OEM sheet PRE 99 400 001. Sourced 9 November 2026. Fuel uses Deutz 100 kW telematics proxy (12.5 L/hr medium duty). Productivity uses Vaultix estimating formulas. Hire rates remain unquoted placeholders pending verified tenders. Sources and assumptions.

Notes / 0120 t Multi-Tyre Roller / estimating referenceScale NTS Source: Vaultix plant library. Sources and assumptions

Entry / roller-multi-tyre-20t   Issue / 2026-11-09