Plant / 10 to 14 t single smooth drum vibratory roller
12-Tonne Smooth Drum Roller
The benchmark single drum vibratory soil compactor for road subgrade, granular pavement layers, and bulk earthworks compaction.
- Smooth drumEffective width and overlap determine coverage per pass.
- Vibration systemUse the specified trial and rolling pattern for the material.
- Rear tyresAllow for turning and repositioning at lift boundaries.
- Drum width
- 2.13m
- Centrifugal force
- 301kN
AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.
Choosing this class of smooth drum roller
A 10-14 t class single smooth drum vibratory roller is the core compaction machine across Australian civil earthworks and pavement construction. Equipped with a standard 2,134 mm (84 in) smooth compaction drum, high/low dual amplitude (2.10 mm / 0.98 mm), and up to 301 kN centrifugal dynamic force, it delivers specified dry density across subgrades, select granular fills, crushed rock road base, and rockfill embankments. Compaction productivity is modeled by compacted surface area (m²/hr) or compacted volume (m³/hr) governed by travel speed, drum width, required pass count, lift thickness, and site efficiency.
The benchmark single drum vibratory soil compactor for road subgrade, granular pavement layers, and bulk earthworks compaction.
10 to 14 t class / 2,134 mm (84 in) drum / Smooth drum roller / Civil estimating guide
- Proof rolling and deflection testing of prepared subgrades to identify soft spots prior to pavement construction
- Compacting select granular fill, crushed rock sub-base, and stabilized capping layers
- Granular base course compaction (e.g. 150 mm DGB20 / Type 2.1) achieving specified dry density ratio without crushing aggregate
- High-capacity bulk earthworks embankment layer compaction on civil infrastructure and mining formations
- Compaction of coarse rockfill lifts and heavy quarry material up to 500 mm layer thickness
- Routine maintenance, surface tightening, and finishing of heavy civil and mine haul roads
- Industrial hardstand, building pad, and rail formation sub-ballast compaction




Illustrations featuring the Vaultix civil livery. Machine geometry, articulation, and attachments represent typical Australian civil specifications.
Class planning guide
Published manufacturer specifications for the Caterpillar CS56B / 10-14 t class smooth drum vibratory roller. Use supplier specifications for exact procurement.
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 01.01 | Operating mass | 11,555 kg (cab) / 6,355 kg (at drum) | Standard operating weight with full fluids, operator, and enclosed ROPS/FOPS cab. |
| 01.02 | Static linear load | 29.8 kg/cm | Static drum mass divided by drum width (meets MRTS04/05 and TfNSW R44 standards). |
| 01.03 | Centrifugal force | 301 kN (high) / 141 kN (low) | Dual amplitude dynamic impact force at 30.5 Hz standard frequency. |
| 01.04 | Drum dimensions | 2,134 mm width x 1,534 mm diameter | 30 mm drum shell thickness rolled high-strength steel. |
| 01.05 | Engine gross power | 116.1 kW (155.7 hp) | Cat C7.1 (or 117.0 kW Cat C4.4 Tier 4F build). |
| 01.06 | Fuel allowance | About 7.0 to 15.5 L/hr | 11.0 L/hr telematics medium duty used in planning; duty and vibration time matter. |
| 01.07 | Shipping mass | About 11,280 kg (derived) | Derived: 11,555 kg operating weight less 75 kg operator and 90% fuel (~200 kg). Standard float transport. Excludes trailer. Confirm with haulier. |
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 02.01 | Subgrade proof rolling | Low speed & static / low amplitude | Detects deflection and subgrade pumping under drum load. |
| 02.02 | Granular base course | Low amplitude (0.98 mm) / Eco-mode | Prevents aggregate shattering while achieving required 98% density. |
| 02.03 | Deep embankment lifts | High amplitude (2.10 mm) / 301 kN | Deep dynamic impact penetration up to 500 mm rock/fill layers. |
| 02.04 | Compaction control | MDP & CMV with GNSS mapping | Eliminates over-compaction and maps pass coverage in real time. |
| 02.05 | Transport | Drop-deck low loader float | 2.30 m machine width and 3.11 m height allow general access road transit. |
Dimensions and transport planning
Machine dimensions exclude the transport float trailer. Obtain verified deck height, loaded envelope, axle group weights, route clearance and restraint plans from haulier before mobilisation.
| Code | Dimension | Published value | Planning note |
|---|---|---|---|
| 1 | Overall length (without leveling blade) | 5,860 mm | Bumper to bumper without optional front blade (5,900 mm on Tier 4F). |
| 2 | Overall length with optional leveling blade | 6,400 mm | Length including optional factory front strike-off / leveling blade. |
| 3 | Overall width (standard) | 2,300 mm | Maximum outside width across drum frame / tyres without blade. |
| 4 | Overall width with leveling blade | 2,500 mm | Blade width at cutting edges; within standard 2.50 m general access limit. |
| 5 | Drum compaction width | 2,134 mm | Standard 84.0 in smooth compaction drum width. |
| 6 | Drum shell thickness | 30 mm | Heavy-duty rolled steel drum shell plate for wear resistance. |
| 7 | Drum diameter | 1,534 mm | Smooth drum outside diameter. |
| 8 | Overall height to top of cab (ROPS/FOPS) | 3,110 mm | Ground line to top of ROPS/FOPS cab roof / beacon. Excludes float deck. |
| 9 | Wheelbase | 2,900 mm | Center of drum axle to center of rear wheel drive axle. |
| 10 | Ground clearance under central hitch | 442 mm | Lowest point under central articulation hitch and chassis. |
| 11 | Curb side clearance | 494 mm | Clearance between drum frame side plates and vertical kerb or wall. |
| 12 | Optional leveling blade height | 688 mm | Blade face height on optional front strike-off blade. |
Working range & kinematics
Compaction dynamics, vibratory performance, and steering kinematics for the Cat CS56B 12 t smooth drum vibratory roller. Dual amplitude settings and articulation geometry dictate layer compaction capacity and site manoeuvrability.
| Code | Kinematic range item | Published value |
|---|---|---|
| 1 | Drum compaction path width | 2,134 mm |
| 2 | Drum diameter | 1,534 mm |
| 3 | Drum shell thickness | 30 mm |
| 4 | Maximum centrifugal compaction force (high amplitude) | 301 kN (67,600 lbf) |
| 5 | Minimum centrifugal compaction force (low amplitude) | 141 kN (31,670 lbf) |
| 6 | Nominal amplitude (high) | 2.10 mm |
| 7 | Nominal amplitude (low) | 0.98 mm |
| 8 | Standard vibratory frequency | 30.5 Hz (1,830 vpm) |
| 9 | Eco-mode vibratory frequency | 27.7 Hz (1,664 vpm) |
| 10 | Steering hitch articulation angle | ±34 degrees |
| 11 | Chassis hitch oscillation angle | ±15 degrees |
| 12 | Inside turning radius | 3,680 mm |
| 13 | Outside turning radius (derived) | 5,810 mm (Derived: 3.68 m inside radius + 2.134 m drum width = 5.814 m) |
Direct cost and market hire prices
Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 10-14 t smooth drum roller class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.
Metro and Remote direct costs
| Basis / AUD ex GST | Metro | Remote |
|---|---|---|
| Direct dry / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Direct wet / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Roller operator / paid site hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Delivered diesel / L | 1.94 (reference proxy) | 2.23 (reference proxy) |
| Maintenance, parts and freight | Base allowance | Base plus 25% |
| Roster and camp | Metro working-week roster | 14/7 FIFO, 12-hour days, camp and flights |
Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.
Mobilisation, separate one-off cost
| Purchased transport / AUD ex GST | Metro | Remote |
|---|---|---|
| One delivery event | To be quoted by haulier | To be quoted by haulier |
Float mobilisation depends on transport distance, route permits, and float deck availability. Machine dimensions (2.30 m width, 3.11 m height) comply with standard Australian general access limits without permits. Allow separate return demobilisation event.
| Source / date | Hire basis | Per hour | Per day | Per week | Conditions |
|---|---|---|---|---|---|
| Awaiting supplier tender verification Status: Unquoted placeholder |
Dry / Wet pending quotes | Not yet quoted | Not yet quoted | Not yet quoted | All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including GPS/intelligent compaction control options, fuel inclusion, drum wear terms and float costs. |
First-principles direct hourly cost
| Component | Direct dry AUD/hr | Direct wet AUD/hr |
|---|---|---|
| Ownership: depreciation and interest | Not yet quoted | Not yet quoted |
| Insurance and registration | Not yet quoted | Not yet quoted |
| Maintenance, servicing, tyres and drum wear | Not yet quoted | Not yet quoted |
| Fuel and operating lubricants (11.0 L/hr proxy) | 0.00 | Not yet quoted |
| Roller operator cost per paid site hour | 0.00 | Not yet quoted |
| Direct cost per operating hour | Not yet quoted | Not yet quoted |
Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.
Productivity and calculator
Hourly Compacted Area m²/hr = (Speed km/h x 1,000 x Drum Width m x Efficiency) / Passes. Hourly Compacted Volume m³/hr = Compacted Area m²/hr x Compacted Layer Thickness m. Single-Pass Rate m²/hr = Speed km/h x 1,000 x Drum Width m x Efficiency. Linear Advance km/hr = (Speed km/h x Efficiency) / Passes. All speed, pass count, thickness and efficiency factors are Vaultix estimating assumptions.
Activity estimating guides
Vaultix estimating standards, 9 November 2026. Joint civil earthworks planning scenarios, not statistical confidence limits.
Low: travel speed x 0.85, drum width x 0.90, efficiency x 0.80, passes x 1.20. High: travel speed x 1.15 (cap 11.4 km/h), drum width x 1.00 (2.134 m drum), efficiency x 1.10 (cap 1.00), passes x 0.85 (min 1).
01Subgrade proof rolling
Low-speed test rolling over prepared subgrade to visually identify surface deflection, soft spots, pumping, or shear failure under 12 t drum loading prior to sub-base placement.
Vaultix assumptions: Speed 3.5 km/h; drum width 2.13 m; 3 passes; efficiency 75%; lift thickness 0.00 m (surface proof roll).
Worked example: (3.5 x 1000 x 2.13 x 0.75) / 3 = 1,864 m²/hr, or 14,910 m² in an 8-hour shift. Net advance: 0.88 linear km/hr.
Allow for: Pauses for geotechnical superintendent inspection, marking out soft spots, test-rolling signoff, and formation boundary turnarounds.
Pitfalls: Operating above 4 km/h prevents accurate deflection observation; excessive vibration on saturated subgrades can induce liquefaction and shear failure.
02Select fill and sub-base compaction
Compacting imported select granular fill and crushed rock sub-base layers to achieve specified 98% Standard / 95% Modified Proctor density.
Vaultix assumptions: Speed 4.0 km/h; drum width 2.13 m; 6 passes; efficiency 78%; lift thickness 0.20 m.
Worked example: (4.0 x 1000 x 2.13 x 0.78) / 6 = 1,108 m²/hr (222 m³/hr), or 8,861 m² (1,772 m³) in an 8-hour shift. Net advance: 0.52 linear km/hr.
Allow for: 4 passes at high amplitude followed by 2 passes at low amplitude, coordination with water cart moisture conditioning, and pass overlap tracking.
Pitfalls: Rolling unconditioned dry material leads to density failure; excessive high-amplitude passes on thin lifts can shatter aggregate particles.
03Granular base course compaction
Compaction and tight surface finish of high-specification unbound granular road base (e.g. 150 mm DGB20 or Type 2.1 crushed rock) to 100% or 102% Modified Proctor density.
Vaultix assumptions: Speed 3.5 km/h; drum width 2.13 m; 8 passes; efficiency 72%; lift thickness 0.15 m.
Worked example: (3.5 x 1000 x 2.13 x 0.72) / 8 = 671 m²/hr (101 m³/hr), or 5,368 m² (805 m³) in an 8-hour shift. Net advance: 0.32 linear km/hr.
Allow for: 6 passes for core interlock plus 2 low-amplitude passes to lock the upper running surface, nuclear density gauge testing, survey dipping, and surface misting.
Pitfalls: High amplitude on compacted base course shatters aggregate and causes decompaction; operate strictly in low amplitude or static mode for final passes.
04Embankment layer compaction
High-volume bulk earthworks embankment layer compaction on broad road formations, structural fills, and civil site footprints.
Vaultix assumptions: Speed 4.5 km/h; drum width 2.13 m; 5 passes; efficiency 82%; lift thickness 0.30 m.
Worked example: (4.5 x 1000 x 2.13 x 0.82) / 5 = 1,572 m²/hr (472 m³/hr), or 12,575 m² (3,773 m³) in an 8-hour shift. Net advance: 0.74 linear km/hr.
Allow for: Long continuous rolling runs, high-amplitude 301 kN dynamic impact penetration, and coordinated dump truck dumping sequences.
Pitfalls: Spreading lifts thicker than 300 mm without verifying compaction depth can leave soft uncompacted bridging layers deep within the embankment.
05Rock fill / stabilised layer compaction
Heavy compaction of coarse rock fill and stabilized embankment layers up to 450-500 mm lift thickness utilizing high amplitude and maximum dynamic impact force.
Vaultix assumptions: Speed 3.0 km/h; drum width 2.13 m; 8 passes; efficiency 70%; lift thickness 0.45 m.
Worked example: (3.0 x 1000 x 2.13 x 0.70) / 8 = 559 m²/hr (252 m³/hr), or 4,473 m² (2,013 m³) in an 8-hour shift. Net advance: 0.26 linear km/hr.
Allow for: Low travel speed to absorb rock rebound, pass tracking until zero settlement is reached, and wear management on drum shell.
Pitfalls: Rock fragment sizes exceeding two-thirds of the layer thickness prevent drum interlock and cause severe machine bouncing and drum hop.
06Haul road finishing
Rapid maintenance compaction and surface sealing of active heavy civil and quarry haul roads behind routine maintenance blading.
Vaultix assumptions: Speed 6.0 km/h; drum width 2.13 m; 3 passes; efficiency 82%; lift thickness 0.10 m.
Worked example: (6.0 x 1000 x 2.13 x 0.82) / 3 = 3,493 m²/hr (349 m³/hr), or 27,946 m² (2,795 m³) in an 8-hour shift. Net advance: 1.64 linear km/hr.
Allow for: 2 to 3 passes in low-amplitude or static mode to seal and smooth running tracks, UHF radio coordination with hauling traffic, and water cart suppression.
Pitfalls: Avoid over-vibrating dry gravel roads which breaks the cohesive binding matrix and increases loose gravel generation and dusting.
Estimator checks
- Compaction drum width: Standard 2,134 mm (84 in) smooth drum; standard overlap between adjacent passes should be 150 mm to 200 mm to prevent uncompacted strips.
- Select appropriate amplitude setting: High amplitude (2.10 mm, 301 kN) is required for deep embankment lifts and coarse rockfill; low amplitude (0.98 mm, 141 kN) must be used on thin base courses to prevent aggregate shattering and decompaction.
- Intelligent compaction: Confirm if machine is equipped with Cat Compaction Control (MDP and CMV) and GNSS mapping to monitor stiffness in real time and eliminate unnecessary passes.
- Padfoot conversion: Check if project specifications require a two-piece clamp-on padfoot shell kit (+1,730 kg to +1,880 kg) for cohesive clay soils or embankment zones.
- Transport dimensions: Machine width is 2.30 m (or 2.50 m with optional leveling blade) and height is 3.11 m. Combined height on a 900 mm drop-deck float is ~4.01 m, well within standard 4.30 m general access limits without permits.
- Shipping mass: Derived shipping mass is approximately 11,280 kg dry (11,555 kg operating weight less 75 kg operator and 90% fuel allowance). Standard 3-axle or 4-axle float is suitable.
- Exclusion zones and vibration safety: Ground vibration can affect adjacent structures, retaining walls, and underground utilities. Disable drum vibration within 5 m of sensitive assets.
- All hire rate schedules are unquoted placeholders. In accordance with Vaultix estimating principles, never invent hire rates without formal supplier tenders.
- Output is area-governed (m²/hr) and layer volume-governed (m³/hr), not bucket payload. Balance roller coverage with earthmoving dump spreads and water cart delivery.
- No HRWL class required; operator competency confirmed by VOC and RIIMPO317F (Conduct roller operations).
Data basis. Corrected 10 November 2026 after an independent check against the Cat sheets: the net power (98.1 kW) and DEF tank (19 L) belong to the Tier 4 Final Cat C4.4 build, not the Cat C7.1 Tier 3 build, which publishes gross power only and has no DEF. Drum diameter and shell thickness differ between the Tier 3, Tier 4i and Tier 4 Final sheets. Which build Australia receives is not stated. Reference model: Caterpillar CS56B Smooth Drum Vibratory Soil Compactor, OEM sheets QEHQ2464 and QEHQ1558-06. Sourced 9 November 2026. Fuel uses OEM Performance Handbook telematics proxy (11.0 L/hr medium duty). Productivity uses Vaultix estimating formulas. Hire rates remain unquoted placeholders pending verified tenders. Sources and assumptions.
Entry / roller-smooth-12t Issue / 2026-11-09