Plant / 13 to 16 t multipurpose hydraulic crawler drill rig

Soil Nail Drilling Rig

The versatile hydraulic crawler drill rig for soil nailing, ground anchor tiebacks, foundation micropiles, rock bolting and slope stabilization across Australian civil infrastructure.

Soil Nail Drilling Rig
  1. Feed beamSet the drilling orientation to the released nail location.
  2. Drill rodRecord achieved depth and ground response.
  3. Crawler baseInclude repositioning between nail rows.
Illustrative Vaultix machine configuration. Consult the selected model’s data for dimensions and capacities.
Max rotary torque
22.2kNm
Mast stroke
7.30m
Direct wet cost
Not quoted yet
Hire rates need dated supplier quotes →

AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.

General class information

Choosing this class of soil nail drilling rig

A 13-16 t class multipurpose hydraulic crawler drill rig (such as the Casagrande C6 XP-2) is the primary geotechnical production platform for Australian civil slope stabilization, excavation retention, ground anchorage, and foundation micropiles under AS 4678, AS 2159, and Transport for NSW QA Specification R64. Powered by a 142 kW (190 hp) Cummins B4.5 Stage V turbocharged diesel engine with Smart Power Management (SPM) load-sensing hydraulics delivering 319 L/min at 350 bar, it mounts modular mast columns (6100 MR or 9100 MR with up to 7.3 m single-pass stroke, 100 kN extraction and crowd force), interchangeable rotary heads up to 22.2 kNm torque (T2500 EP), M42 hydraulic clamp and breaker (60 to 424 mm passage with 283 kN clamping force), full Front The Wall (FTW) ±93° kinematic mast articulation, and an automated onboard rod carousel. Productivity is modeled across borehole drilling, tendon insertion, and tremie or pressure dynamic grouting cycles.

The versatile hydraulic crawler drill rig for soil nailing, ground anchor tiebacks, foundation micropiles, rock bolting and slope stabilization across Australian civil infrastructure.

13 to 16 t class / 22.2 kNm rotary torque / Multipurpose crawler drill / Casagrande C6 XP-2

  • Soil nail drilling and solid steel threadbar installation (100–150 mm boreholes, 6–14 m depth) for civil slope stabilization, rail cuttings, and road widening cut batters under AS 4678 and TfNSW R64
  • Self-drilling anchor (SDA) hollow-bar nails with simultaneous dynamic cement grouting in collapsible gravels, talus, and saturated silt formations
  • High-capacity prestressed active ground anchors (tiebacks) for multi-level basement excavation shoring, soldier pile retention, and bridge abutments
  • Pattern rock bolting and rock dowel installation with high-frequency hydraulic top hammer drifter (T40) on jointed rock cuttings, tunnel portal headings, and spillway excavations
  • Small-diameter cased foundation micropiles and pin piles (100–300 mm diameter) using T2500 EP rotary head or double-rotary heads for bridge underpinning and seismic retrofits
  • Single-pass jet grouting columns up to 20.1 m depth with lattice mast extension structure and high-pressure P114/P200 hydraulic chuck
  • Exploratory geotechnical core drilling and horizontal slope drainage holes up to 4.15 m horizontal spindle height

Class planning guide

Published manufacturer specifications for the Casagrande C6 XP-2 / 13 to 16 t class multipurpose hydraulic crawler drill rig. Use supplier specifications for exact procurement.

Class planning values
RefItemValuePlanning note
01.01Operating massAbout 15 t (13.5 t to 15.5 t)Varies with mast length, rotary head selection, clamp model, and rod carousel.
01.02Engine power142 kW (190 hp) @ 2,000 rpmCummins B4.5 Stage V / Tier 4 Final; UN/ECE R96 Tier 3 option 123 kW.
01.03Rotary torqueUp to 22.2 kNm (T2500 EP) / 15.2 kNm (T20 EP)High-torque head for micropiles/casings; balanced head for soil nails.
01.04Mast stroke4.3 m (6100 MR) / 7.3 m (9100 MR)Carriage travel stroke for 3 m or 6 m single-pass rod drilling.
01.05Feed crowd / pull87 kN nominal / 100 kN optionalHydraulic cylinder down-thrust and extraction pull-back force.
01.06Shipping massAbout 15,000 kg bareLoads on standard 3-axle drop-deck float; within 2.50 m general access width.
01.07Fuel burn allowance11.0 to 26.0 L/hr (18.0 L/hr likely)Derived from Cummins B4.5 (142 kW) load factor mapping with SPM load-sensing hydraulics.
01.08Ground bearing pressure~70.0 kPa (derived)Derived: 15,000 kg on 2.104 m² contact = 69.94 kPa (~70.0 kPa); spikes to ~150 kPa under dynamic crowd/breakout.
Choosing the machine
RefItemValuePlanning note
02.01Soil nailingT20 EP rotary head & RC6 carouselHigh-speed drilling (up to 400 rpm) with automated rod handling for 6-14 m nails.
02.02Hollow-bar anchorsContinuous rotary injection & SDA bitsSingle-pass drilling with dynamic grout injection for collapsing ground conditions.
02.03Ground anchorsDouble clamp M42 & casing extractionAdvancing and extracting temporary casing strings with 200 kN casing pull.
02.04MicropilesT2500 EP head & double rotary optionHigh torque (22.2 kNm) for advancing large casings up to 424 mm diameter.
02.05Transport & access2.25 m overall width, 2.99 m heightNo oversize width permit required; standard general access transport envelope.

Dimensions and transport planning

Machine dimensions exclude the transport float trailer. Obtain verified deck height, loaded envelope, axle group weights, route clearance and restraint plans from haulier before mobilisation.

Machine only, excludes trailer (Casagrande C6 XP-2 reference)
CodeDimensionPublished valuePlanning note
ATransport length with 6100 MR mast (stroke 4,300 mm)8,420 mmOverall longitudinal travel length with compact mast folded horizontally.
BTransport length with 9100 MR mast (stroke 7,300 mm)10,805 mmOverall longitudinal travel length with standard long mast folded down (10,805 mm to 11,420 mm).
COverall transport height2,985 mmHighest point of folded mast assembly during road transit (2.99 m).
DOverall transport / undercarriage width2,250 mmFixed overall width across 400 mm triple grouser steel track shoes (inside 2.50 m general access).
EOverall crawler track length3,300 mmLongitudinal tip-to-tip track frame length.
FUndercarriage track gauge (center-to-center)1,850 mmDerived: 2,250 mm overall undercarriage width less 400 mm track shoe width = 1,850 mm track gauge.
GCrawler track shoe width400 mmWidth of standard triple grouser steel track shoes.
HGround clearance under carbody290 mmClearance under central carbody belly plate.
IMast crowd positioning slide stroke1,250 mmLongitudinal sliding displacement of complete mast column along the carrier chassis.
JWorking height in vertical orientation (6100 MR mast)7,805 mmGround to crown of mast when erected vertically in compact configuration (7.81 m).
KWorking height in vertical orientation (9100 MR mast)10,805 mmGround to crown of mast when erected vertically in standard configuration (10.81 m).
LMaximum horizontal drilling height4,150 mmSpindle centerline elevation in horizontal orientation above ground level.
MMast kinematic lateral slew articulation±93°Continuous bilateral rotation of the mast column relative to crawler carrier (±93°, 186° total sweep).
NTailswing / counterweight swing radius2,630 mmRear overhang radius from kinematic center of rotation.

Working range & kinematics

Kinematic capabilities for mast articulation, Front The Wall (FTW) slew rotation, stroke travel, clamp passage, and rotary torque. Allow for geotechnical ground resistance, working bench stability, and operator exclusion zones.

Geometric and kinematic planning limits
CodeKinematic range itemPublished value
1Maximum single-pass stroke (Mast 9100 MR)7,300 mm (7.30 m)
2Maximum single-pass stroke (Mast 6100 MR)4,300 mm (4.30 m)
3Maximum double rotary head stroke (Mast 9100 MR)6,100 mm (6.10 m)
4Maximum double rotary head stroke (Mast 6100 MR)3,100 mm (3.10 m)
5Maximum clamp passage diameter (M42 / M42S)60 mm to 424 mm
6Maximum clamping force283 kN (28.8 tonnes)
7Maximum clamp breakout torque46 kNm
8Maximum rotary torque (T2500 EP rotary head)22.2 kNm (22,200 Nm)
9Maximum rotary torque (T20 EP rotary head)15.2 kNm (15,200 Nm)
10Maximum rotary speed (T14 EP rotary head)500 rpm
11Maximum extraction / crowd force87 kN nominal / 100 kN optional (8.9 t / 10.2 t)
12Maximum feed speed (extraction / crowd)53 m/min standard / 77 m/min optional
13Maximum drilling depth with RC6 rod carousel22.3 m
14Maximum drilling depth with RC10 rod carousel35.3 m
15Maximum single-pass jet grouting depth20.1 m
16Auxiliary hoist winch capacity2,000 kg to 3,000 kg (20 kN - 30 kN)
Cost planning

Direct cost and market hire prices

Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 13 to 16 t soil nail drilling rig class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.

Metro and Remote direct costs

Location comparison (AUD ex GST)
Basis / AUD ex GSTMetroRemote
Direct dry / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Direct wet / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Drill rig operator and dogman crew / paid site hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Delivered diesel / L1.94 (reference proxy)2.23 (reference proxy)
Maintenance, parts and freightBase allowanceBase plus 25%
Roster and campMetro working-week roster14/7 FIFO, 12-hour days, camp and flights

Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.

Mobilisation, separate one-off cost

Excluded from hourly costs
Purchased transport / AUD ex GSTMetroRemote
One delivery eventTo be quoted by haulierTo be quoted by haulier

Float mobilisation on a standard 3-axle drop-deck trailer depends on transport distance, deck specifications, and site access. With a 2.25 m machine width, no oversize permits or pilot escorts are required for width. Allow separate return demobilisation event.

Published hire tariffs: market prices including supplier margin. AUD ex GST.
Source / dateHire basisPer hourPer dayPer weekConditions
Awaiting supplier tender verification
Status: Unquoted placeholder
Dry / Wet pending quotes Not yet quoted Not yet quoted Not yet quoted All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including rotary head selection, automated rod carousel, mast stroke length, fuel inclusion, tooling wear terms and float costs.

First-principles direct hourly cost

Cost schedule / AUD ex GST
ComponentDirect dry AUD/hrDirect wet AUD/hr
Ownership: depreciation and interestNot yet quotedNot yet quoted
Insurance and registrationNot yet quotedNot yet quoted
Maintenance, servicing, undercarriage and GET/wear partsNot yet quotedNot yet quoted
Fuel and operating lubricants (18.0 L/hr drilling proxy)0.00Not yet quoted
Drill rig operator and dogman crew per paid site hour0.00Not yet quoted
Direct cost per operating hourNot yet quotedNot yet quoted

Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.

Vaultix planning estimates

Productivity and calculator

Vaultix estimate: Nails per shift = (shift hours × efficiency) / (drill h + install h + grout cycle h); Linear meters per shift = nails per shift × average nail length (m); Face area stabilized per shift (m²/day) = nails per shift × horizontal nail spacing (m) × vertical nail spacing (m). In standard Australian civil soil nailing (100–150 mm diameter boreholes, 6–12 m tendon length, 1.5 m × 1.5 m grid spacing on cut batters), a 10-hour shift operating at 70–75% efficiency typically achieves 12 to 22 completed solid-bar nails (110 to 200 linear meters of drilling and grouting), stabilizing approximately 27 to 50 m² of batter face per day. When utilizing self-drilling hollow-bar anchors (SDA) with simultaneous dynamic grouting, cycle times drop significantly, achieving 18 to 32 completed nails (160 to 290 linear meters), stabilizing 40 to 72 m² of face area per shift. All factors are Vaultix estimating assumptions.

Instrument / 01

Production scenario

nails/shift

Scenario inputs

Hourly cost defaults to placeholder ($0.00). Enter your project-quoted wet hire or direct cost to calculate unit cost per installed nail and m² face area. All results are estimates.

Activity estimating guides

Vaultix estimating standards, 10 November 2026. Joint planning scenarios, not statistical confidence limits.

Penetration rates and cycle times reflect rotary or rotary-percussive drilling in typical civil soils and weathered rock under AS 4678, AS 2159, and Transport for NSW QA Specification R64. Production requires verification against site-specific geotechnical borehole logs and grout plant capacity.

01Soil nail drilling and installation

Drilling cased or open boreholes, installing centraliser-fitted solid Grade 500N threadbar tendons, and tremie grouting under gravity or low pressure to form passive soil reinforcement for slope stabilization and excavation retention.

Vaultix assumptions: Hole depth 9.0 m (spec 6.0–14.0 m); penetration rate 28.0 m/hr (18.0–42.0 m/hr); install time 6.0 min; grout cycle 8.0 min (14.0 min install & grout); grid spacing 1.5 m × 1.5 m; efficiency 72% (60%–82%).

Worked example: Drilling time 19.3 min; install and grout 14.0 min; total cycle time 33.3 min; output 13.0 completed nails per 10-hour shift (117.0 linear m; 29.25 m² face area stabilized at 1.5 m × 1.5 m grid spacing).

Allow for: Rod tripping, steel bar handling from laydown, grout line connections, batching colloidal cement grout, flushing tremie tubes, and daily rig washdown.

Pitfalls: Hole collapse in uncased loose sands or gravel lenses requiring temporary casing; loss of grout in open rock fissures; rod binding in swelling reactive clays.

02Ground anchors

Execution of high-capacity prestressed ground anchors (strand or high-tensile threadbar) for deep basement retention walls, shoring systems, bridge abutment tiebacks, and dam stabilizing anchors.

Vaultix assumptions: Anchor depth 18.0 m (spec 12.0–26.0 m); drilling rate 20.0 m/hr (12.0–32.0 m/hr); tendon install 14.0 min; grout cycle 18.0 min (32.0 min install & grout); spacing 2.5 m × 2.5 m; efficiency 68% (55%–78%).

Worked example: Drilling time 54.0 min; install and grout 32.0 min; total cycle time 86.0 min; output 4.7 completed anchors per 10-hour shift (85.4 linear m).

Allow for: Temporary casing advancement and extraction with hydraulic sliding clamp M42S/C, tendon crane assist, grout batch testing (bleed, flow cone, cubes), and post-grout TAS tube clearing.

Pitfalls: Casing jam in abrasive fractured rock; grout communication between adjacent anchor boreholes; water ingress under artesian heads washing out fresh cement paste.

03Shotcrete facing support & mesh pinning

Drilling short boreholes, inserting anchor pins/dowels and grouting to secure structural wire mesh (SL82/SL92) and strip filter drains against cut slope faces prior to spraying reinforced structural shotcrete facing.

Vaultix assumptions: Pin depth 4.0 m (spec 2.5–6.0 m); drilling rate 32.0 m/hr (22.0–45.0 m/hr); pin install 3.0 min; grout seal 4.0 min (7.0 min install & grout); spacing 1.5 m × 1.5 m; efficiency 72% (60%–82%).

Worked example: Drilling time 7.5 min; install and grout 7.0 min; total cycle time 14.5 min; output 29.8 completed mesh pinning dowels per 10-hour shift (119.2 linear m; 67.0 m² face mesh secured).

Allow for: Geotechnical soil trimming, fixing strip filter drains (wick drains), installing SL82/SL92 reinforcing mesh, shooting test panels for UCS and EFNR testing, and rebound spoil clearance.

Pitfalls: Shadowing behind dense reinforcing steel; excessive rebound on dry soil; delamination of fresh shotcrete caused by uncontrolled groundwater seepage behind the face.

04Rock bolting

Installation of pattern rock bolts, rock dowels, and cable bolts in jointed rock cuttings, tunnel portals, spillway excavations, and highwall stabilization.

Vaultix assumptions: Bolt length 4.5 m (spec 3.0–6.5 m); drilling penetration 36.0 m/hr (22.0–52.0 m/hr); resin capsule insert 3.0 min; tension & grout 4.0 min (7.0 min install & grout); spacing 1.5 m × 1.5 m; efficiency 74% (62%–84%).

Worked example: Drilling time 7.5 min; install and tension 7.0 min; total cycle time 14.5 min; output 30.6 completed bolts per 10-hour shift (137.8 linear m; 68.9 m² rock face stabilized).

Allow for: Rock scaling, hole flushing with compressed air, resin capsule insertion sticks, torque wrench calibration checks, and proof-load pull testing per AS 4678.

Pitfalls: Over-drilled hole causing resin to pool beyond bolt tip; resin capsule loss in open joints; premature spinning causing resin flash-set before full depth engagement.

05Micropiles

Construction of high-capacity small-diameter foundation micropiles, pin piles, and underpinning elements for bridge abutments, building foundations, seismic retrofits, and tower bases.

Vaultix assumptions: Pile depth 15.0 m (spec 9.0–22.0 m); cased drilling rate 14.0 m/hr (8.0–22.0 m/hr); bar install 15.0 min; tremie grout 25.0 min (40.0 min install & grout); spacing 2.0 m × 2.0 m; efficiency 70% (58%–80%).

Worked example: Drilling time 64.3 min; reinforcement and tremie grout 40.0 min; total cycle time 104.3 min; output 4.0 completed micropiles per 10-hour shift (60.4 linear m).

Allow for: Casing section alignment and welding/threading, rebar centraliser assembly, structural grout batch testing per AS 1012, and static load test frame setup.

Pitfalls: Casing lockup in boulder till or gravel layers; necking of grout column during casing withdrawal; loss of flush circulation undermining adjacent foundations.

06Hollow-bar nails with grout

Single-pass installation of self-drilling anchor (SDA) hollow-core soil nails with simultaneous continuous grout injection, ideal for collapsing soils, gravels, saturated silts, and talus deposits.

Vaultix assumptions: Nail length 9.0 m (spec 6.0–15.0 m); simultaneous drill penetration 25.0 m/hr (15.0–38.0 m/hr); rod coupling 5.0 min; grout swivel & finish 5.0 min (10.0 min handling); spacing 1.5 m × 1.5 m; efficiency 76% (65%–85%).

Worked example: Simultaneous drilling and grouting 21.6 min; rod coupling and handling 10.0 min; total cycle time 31.6 min; output 14.4 completed SDA nails per 10-hour shift (129.8 linear m; 32.45 m² face area at 1.5 m × 1.5 m grid).

Allow for: Coupling multiple 3 m bar segments, connecting rotary injection swivel, monitoring continuous grout return at the borehole collar, and fitting spherical washer bearing plates.

Pitfalls: Grout nozzle blockage in sacrificial drill bit; excessive grout consumption in open voids or cavernous strata; over-torquing hollow bar couplers in hard rock.

07Sub-horizontal slope drainage

Drilling 75 mm to 100 mm diameter boreholes at 5° upward rake to depths of 8 m to 15 m, installing perforated PVC drain pipes wrapped in geotextile filter sock, and grouting collar seals to relieve hydrostatic pore water pressure behind the soil nail wall.

Vaultix assumptions: Drain depth 10.0 m (spec 6.0–15.0 m); drilling penetration 30.0 m/hr (20.0–45.0 m/hr); slotted PVC pipe insert 8.0 min; collar seal grout 4.0 min (12.0 min install & seal); spacing 3.0 m × 3.0 m; efficiency 74% (62%–84%).

Worked example: Drilling time 20.0 min; pipe install and collar seal 12.0 min; total cycle time 32.0 min; output 13.9 completed drainage relief holes per 10-hour shift (138.8 linear m; 124.9 m² batter face depressurized at 3.0 m × 3.0 m grid).

Allow for: Flushing boreholes with clean water/air, handling slotted PVC drain pipe strings with filter sock sleeves, setting packers/seals, and connecting collection outlet pipes.

Pitfalls: Hole collapse in saturated silt or sand before drain insertion requiring sacrificial casing; drilling into artesian pockets creating sudden high-volume water ingress.

Estimator checks

  • Working platform and bench bearing capacity: The 15.0 t crawler drill rig exerts nominal ground bearing pressures of ~70 kPa, spiking up to 140–160 kPa under dynamic mast crowd thrust (100 kN) or casing breakout. Working benches on steep slope batters must be geotechnically verified, proof-rolled, and constructed with adequate safety bunds prior to rig tracking.
  • Mast stroke selection: 6100 MR mast (4.30 m single-pass stroke, 8.42 m transport length) suits standard 3 m drill rods and restricted headroom benches; 9100 MR mast (7.30 m single-pass stroke, 10.81 m transport length) enables high-productivity 6 m rod strings.
  • Borehole collapse and casing requirements: In uncased loose sands, gravel lenses, or collapsing alluvial fill, specify self-drilling anchor (SDA) hollow bars with simultaneous dynamic grouting or temporary outer casing with M42 double hydraulic clamp (up to 424 mm passage) and T2500 EP rotary head.
  • Grout plant and water support: Drilling production strictly requires synchronized colloidal grout mixing and pumping plant. Plan for water cart / mains water supply for grout batching and high-pressure drill tool flushing.
  • Transport and site access: With a fixed 2.25 m transport width across 400 mm steel tracks, the machine travels inside the 2.50 m Australian general access width limit on a standard 3-axle drop-deck float without width permits or escorts. Folded mast transit height is 2.99 m (~3.84–3.94 m loaded height on a 0.85–0.95 m deck).
  • Automated rod carousel: Equipping the rig with the RC6 (6 x 3 m rods) or RC10 (10 x 3 m rods) carousel eliminates manual drill steel lifting, dramatically reducing crew fatigue and musculoskeletal injury risks while satisfying EN 16228 safety standards.
  • All hire rate schedules are unquoted placeholders. In accordance with Vaultix estimating principles, never invent hire rates without formal supplier tenders.
  • Output is cycle-governed (nails per shift) and linear penetration-governed (m/hr), not bulk earthmoving. Factor site ground conditions, borehole stability, and batch grout delivery into production schedules.
  • National civil plant competency / VOC (RIIMPO323E) required for rig operator; High Risk Work Licence Dogging (CPCCLDG3001A) mandatory for drill support crew.

Data basis. Independent check 10 November 2026 against the Casagrande C6 XP-2 brochure: all 10 key values matched (weight, engine 142 kW, fuel, torque, crowd force, mast, undercarriage). Derived values and hydraulic rows were not checked. Reference model: Casagrande C6 XP-2 Hydraulic Crawler Drill Rig. Technical specifications sourced from official Casagrande S.p.A. technical brochure EN 07.2026 (https://casagrandegroup.com/wp-content/uploads/2026/02/C6XP-2-brochure.pdf), IDE Casagrande C6-2 specifications (https://www.idedrills.com/wp-content/uploads/2024/07/CasagrandeC6-2-2024.pdf), and Fortec Australia data sheet (https://www.fortec.com.au/wp-content/uploads/2023/09/Drill-rig-data-sheet-CASSAGRANDE-C6-XP.pdf). Verified 10 November 2026. Fuel burn derived from Cummins B4.5 engine telematics load factor mapping (18.0 L/hr ground engineering likely). Productivity uses Vaultix geotechnical cycle formulas. Hire rates remain unquoted placeholders pending verified tenders. Sources and assumptions.

Notes / 01Soil Nail Drilling Rig / estimating referenceScale NTS Source: Vaultix plant library. Sources and assumptions

Entry / soil-nail-rig   Issue / 2026-11-10

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.