Plant / 70 t GCM / 57.5 t PBS tipper and quad-axle dog trailer
Truck and Quad-Axle Dog
The premier Australian bulk haulage combination for earthworks, quarry aggregates, road base delivery, and site spoil cartage under PBS mass limits.
- Truck bodyConfirm legal and project payload for the combination.
- DrawbarAccess and turning space affect spotting and travel.
- Dog trailerInclude unloading and return time for the complete haul cycle.
- Net legal payload
- 40,000kg
- Combined volume
- 41.0m³
AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.
Choosing this class of truck and quad-axle dog
A truck and quad-axle dog trailer combination is the benchmark high-productivity bulk material transport platform across Australian civil infrastructure, road construction, and quarry operations. Based on a heavy rigid tipper truck (such as the Kenworth T410 8x4 / 6x4 with PACCAR MX-13 343-380 kW powertrain) coupled via a 50 mm automatic pin coupling to a 4-axle dog trailer with steerable front dolly and dual tipping bodies, it achieves up to 57.5 t GCM under NHVR Performance-Based Standards (PBS Level 2) with net legal payloads approaching 40.0 t. Productivity is modeled per round-trip cycle time, legal payload tonnage, and material loose density across bulk earthworks, pavement aggregate delivery, and off-site spoil disposal.
The premier Australian bulk haulage combination for earthworks, quarry aggregates, road base delivery, and site spoil cartage under PBS mass limits.
70 t GCM rating / 57.5 t PBS Level 2 / Truck & Quad Dog / Civil haulage guide
- Bulk earthworks haulage and cut-to-fill cartage on major civil corridors and highway construction
- Off-site spoil removal and cartage to licensed recycling facilities or EPA-approved repositories
- Quarry line-haul of aggregates, ballast, and raw rock spalls to concrete and asphalt batch plants
- Delivery and controlled spreading of crushed rock road base (CBR 80, 20 mm DGB) for pavement construction
- Embankment import fill haulage from commercial borrow pits to site formation footprints
- Demolition waste and crushed concrete rubble haulage to materials recycling facilities
Class planning guide
Published manufacturer specifications for the Kenworth T410 (8x4 / 6x4) tipper paired with a 4-axle dog trailer. Use supplier specifications for exact procurement.
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 01.01 | Gross Combination Mass (GCM) | 57.5 t (PBS L2) / 50.5 t (PBS L1) | Statutory GCM under NHVR Performance-Based Standards; 70.0 t OEM chassis rating. |
| 01.02 | Net legal payload | 40.0 t (PBS L2) / 33.0 t (PBS L1) | Derived: GCM less ~17.5 t unladen combination tare mass. |
| 01.03 | Engine power & torque | 343 to 380 kW (460 to 510 hp) / 2,508 Nm | PACCAR MX-13 12.9 L turbo diesel; high torque plateau at 1,000-1,425 rpm. |
| 01.04 | Combined body volume | 41.0 m³ struck / 47.0 m³ heaped | 15.0 m³ rigid tipper body + 26.0 m³ quad dog trailer body. |
| 01.05 | Overall combination length | 19.50 m | Complies with 20.0 m statutory envelope under NHVR National Class 3 Notice. |
| 01.06 | Fuel allowance | About 18 to 34 L/hr (25.0 L/hr mixed) | PACCAR MX-13 telematics proxy at 50-57.5 t GCM; DEF consumption approx 1.25 L/hr. |
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 02.01 | PBS Level 2 network | 57.5 t GCM / 40.0 t payload | Maximizes bulk quarry and infrastructure earthworks haulage efficiency on approved routes. |
| 02.02 | PBS Level 1 access | 50.5 t GCM / 33.0 t payload | Operates across broad general access networks with 19 m / 20 m envelope. |
| 02.03 | Alloy tipper bodies | High-tensile aluminium | Optimizes tare mass (~17.5 t total) to maximize revenue payload. |
| 02.04 | Tipping stability | Front multi-stage hoists | Requires level, compacted tipping ground (<2.0° cross-slope) and overhead line checks (8.2 m tip height). |
| 02.05 | Road-friendly suspension | Airglide / Airbag axles | Preserves road pavements and satisfies statutory HML/PBS requirements. |
Dimensions and transport planning
Combination dimensions reflect the coupled vehicle ready for highway transit. Verify loaded envelope, axle group mass limits, bridge formulas, route permits and PBS vehicle approval before deployment.
| Code | Dimension | Published value | Planning note |
|---|---|---|---|
| 1 | Overall combination travel length | 19,500 mm | Complies with 20.0 m statutory envelope under NHVR National Class 3 Notice. |
| 2 | Overall vehicle width across bodies | 2,500 mm | Standard legal road width across tipping bodies and mirror envelope. |
| 3 | Overall travel height (unladen to roll tarp) | 3,350 mm | Ground line to highest point of rollover tarp bows unladen. |
| 4 | Rigid truck tipping body length | 5,200 mm | High-tensile aluminium alloy front body. |
| 5 | Quad dog trailer body length | 7,800 mm | High-tensile aluminium alloy trailer body. |
| 6 | Drawbar effective length (pin to turntable center) | 4,800 mm | Articulated A-frame drawbar with 50 mm automatic pin coupling. |
| 7 | Maximum truck tipping height (raised at 48°) | 6,800 mm | Full extension of truck body hoist (requires minimum 7.5 m overhead clearance). |
| 8 | Maximum trailer tipping height (raised at 50°) | 8,200 mm | Full extension of trailer front hoist (requires minimum 9.0 m overhead clearance). |
| 9 | Bumper-to-Back-of-Cab (BBC) | Not verified | 112 in BBC Day Cab with set-back front axle, maximizing body deck length. |
| 10 | Rigid truck chassis wheelbase | 5,600 mm | Front steer axle to center of drive tandem group. |
| 11 | Minimum ground clearance under differentials | 280 mm | Ground clearance under rear drive axle housings. |
| 12 | Low-speed turning swept path radius | 13,700 mm | Complies with PBS Level 1 low-speed swept path criteria (≤13.7 m). |
Payload capacity & tipping range
Volumetric capacities, legal payload limits, hoist discharge geometry, and highway operating ranges for the truck and quad-axle dog combination. Payloads are governed by statutory mass schemes (PBS Level 2 vs Level 1 vs GML) and material bulk density.
| Code | Capacity & range item | Published value | Planning note |
|---|---|---|---|
| 1 | Net combination payload (PBS Level 2 @ 57.5 t GCM) | 40.0 t (40,000 kg) | Lightweight aluminium bodies with 17.5 t combination tare mass |
| 2 | Net combination payload (PBS Level 1 @ 50.5 t GCM) | 33.0 t (33,000 kg) | General metropolitan PBS Level 1 network access |
| 3 | Net combination payload (GML baseline @ 42.5 t GCM) | 25.0 t (25,000 kg) | Statutory General Mass Limits without PBS concessions |
| 4 | Combined body volume (water level struck) | 41.0 m³ | 15.0 m³ truck body + 26.0 m³ quad dog trailer body |
| 5 | Combined body volume (heaped 1.5:1) | 46.0 to 48.0 m³ | Allows volumetric fill for lighter materials (1.3 to 1.5 t/m³) |
| 6 | Maximum trailer tipping height | 8.20 m | Multi-stage front hoist at 50° tip angle; min 9.0 m wire clearance required |
| 7 | Maximum truck tipping height | 6.80 m | Truck tipping body at 48° tip angle; min 7.5 m clearance required |
| 8 | Tipping discharge angle | 48° to 50° | Steep discharge angle ensures clean gravity dump of sticky clay and wet fill |
| 9 | Highway fuel operating range | 800 to 1,000 km | 450 L fuel tank capacity at 48-52 L/100 km average civil consumption |
| 10 | AdBlue operating range | 3,000 to 3,500 km | 75 L AdBlue reservoir supports 3-4 diesel tank refills |
| 11 | Low-speed turning swept path radius | ≤ 13.7 m | Complies with NHVR PBS Level 1 low-speed intersection swept path standard |
Direct cost and market hire prices
Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this truck and quad-axle dog combination are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.
Metro and Remote direct costs
| Basis / AUD ex GST | Metro | Remote |
|---|---|---|
| Direct dry / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Direct wet / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Heavy vehicle driver / paid site hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Delivered diesel / L | 1.94 (reference proxy) | 2.23 (reference proxy) |
| Maintenance, parts and freight | Base allowance | Base plus 25% |
| Roster and camp | Metro working-week roster | 14/7 FIFO, 12-hour days, camp and flights |
Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.
Mobilisation, separate one-off cost
| Purchased transport / AUD ex GST | Metro | Remote |
|---|---|---|
| One delivery event | To be quoted by haulier | To be quoted by haulier |
Combination mobilisation depends on transport distance, whether self-driven under NHVR PBS permits or relocated by haulier, and project route access. Allow separate return demobilisation event.
| Source / date | Hire basis | Per hour | Per day | Per week | Conditions |
|---|---|---|---|---|---|
| Awaiting supplier tender verification Status: Unquoted placeholder |
Dry / Wet pending quotes | Not yet quoted | Not yet quoted | Not yet quoted | All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including PBS Level 2 route permits, Smart OBM compliance, fuel inclusion, wear terms, and mobilisation conditions. |
First-principles direct hourly cost
| Component | Direct dry AUD/hr | Direct wet AUD/hr |
|---|---|---|
| Ownership: depreciation and interest | Not yet quoted | Not yet quoted |
| Insurance and registration | Not yet quoted | Not yet quoted |
| Maintenance, servicing, tyres and wear parts | Not yet quoted | Not yet quoted |
| Fuel and operating lubricants (25.0 L/hr proxy) | 0.00 | Not yet quoted |
| Heavy vehicle driver cost per paid site hour | 0.00 | Not yet quoted |
| Direct cost per operating hour | Not yet quoted | Not yet quoted |
Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.
Productivity and calculator
Trips per Hour = (60 / Cycle Time min) x Efficiency. Hourly Output Rate (t/hr) = Trips per Hour x Effective Payload (t). Hourly Volumetric Output (m³/hr) = Hourly Tonnage / Loose Bulk Density (t/m³). Cycle time = Load Time + Haul Time + Tip & Maneuver Time + Return Time. All factors are Vaultix civil estimating assumptions, not OEM guarantees.
Activity estimating guides
Vaultix estimating standards, 10 November 2026. Joint planning scenarios, not statistical confidence limits.
Haulage scenarios model round-trip cycle time (loading, laden haul, dual-body tipping, return travel, and queuing delays), legal payload under PBS Level 2 or Level 1, loose bulk density, and site efficiency.
01Bulk earthworks haulage
Haulage of bulk cut-to-fill or site-won material within large project corridors or short external dumps (typically 3-6 km haul distance).
Vaultix assumptions: Payload 38.5 t (PBS Level 2); cycle time 22.0 min (5 km round trip: load 4 min + haul 7 min + tip 3 min + return 6 min + queue/maneuver 2 min); loose density 1.65 t/m³; efficiency 82%.
Worked example: (60 / 22.0 min) x 0.82 efficiency = 2.24 trips/hr; 2.24 x 38.5 t = 86.1 t/hr (52.2 m³/hr), or 689 t in an 8-hour shift.
Allow for: Excavator loading time (4-5 passes per body), haul road dust suppression, split-tipping coordination at embankment, and site turnaround maneuvers.
Pitfalls: Haul road ruts and poor drainage drastically increase rolling resistance and cycle times; soft tip pads require dozer maintenance to prevent tipping rollover.
02Spoil removal
Off-site cartage of excess excavation spoil to licensed commercial tip, EPA-regulated repository, or reclamation fill site (typically 15-25 km one-way).
Vaultix assumptions: Payload 38.0 t; cycle time 54.0 min (18 km urban haul: load 5 min + haul 24 min + tip & weighbridge 5 min + return 20 min); loose density 1.50 t/m³; efficiency 78%.
Worked example: (60 / 54.0 min) x 0.78 efficiency = 0.87 trips/hr; 0.87 x 38.0 t = 32.9 t/hr (22.0 m³/hr), or 263 t in an 8-hour shift.
Allow for: Urban traffic light cycles, automated roll tarp deployment, wheel wash before road exit, and disposal tipping fees / weighbridge dockets.
Pitfalls: Urban traffic peak-hour delays can extend cycle times by >50%; cohesive wet clay sticking in body nose risks vehicle overturn during tipping.
03Quarry / pit to site cartage
Bulk line-haul of uncrushed quarry rock, coarse spalls, aggregate, or raw gravels from regional extractive pits to concrete batch plants or project sites (typically 30-50 km one-way).
Vaultix assumptions: Payload 39.0 t; cycle time 80.0 min (35 km highway haul: load 6 min + haul 38 min + tip 4 min + return 32 min); loose density 1.75 t/m³; efficiency 82%.
Worked example: (60 / 80.0 min) x 0.82 efficiency = 0.62 trips/hr; 0.62 x 39.0 t = 24.0 t/hr (13.7 m³/hr), or 192 t in an 8-hour shift.
Allow for: Quarry bin batching or large wheel loader loading, highway cruising speeds, stockpile discharge, and tare-in/gross-out dockets.
Pitfalls: Strict axle group limits must be maintained at quarry weighbridge; coarse rock impact requires durable wear liners in aluminium bodies.
04Road base and aggregate cartage
Delivery of crushed rock road base (CBR 80, 20 mm DGB) and asphalt paving aggregates from quarry to active road construction workfronts (typically 20-30 km one-way).
Vaultix assumptions: Payload 38.5 t; cycle time 60.0 min (25 km cartage: load & tarp 5 min + haul 27 min + controlled tip 6 min + return 22 min); loose density 1.90 t/m³; efficiency 80%.
Worked example: (60 / 60.0 min) x 0.80 efficiency = 0.80 trips/hr; 0.80 x 38.5 t = 30.8 t/hr (16.2 m³/hr), or 246 t in an 8-hour shift.
Allow for: Metered tailgate chains for controlled tipping, roll tarp deployment, traffic integration on active civil alignments, and moisture management.
Pitfalls: Tipping while moving along workfront requires experienced driver and level pavement surface to avoid trailer sway and rollover risk.
05Import fill
Sourcing and hauling certified clean structural fill, subgrade capping, or sand from commercial borrow pits to site embankment footprints (typically 10-20 km one-way).
Vaultix assumptions: Payload 38.0 t; cycle time 45.0 min (15 km cartage: load 4 min + haul 18 min + tip 3 min + return 16 min + queue/tarp 4 min); loose density 1.65 t/m³; efficiency 82%.
Worked example: (60 / 45.0 min) x 0.82 efficiency = 1.09 trips/hr; 1.09 x 38.0 t = 41.5 t/hr (25.2 m³/hr), or 332 t in an 8-hour shift.
Allow for: Borrow pit wheel loader loading, rapid travel over regional arterials, uninhibited tip pad dumping, and roll tarp covering.
Pitfalls: Moisture fluctuations in borrow material affect bulk density and pay tonnage; verify load dockets against certified compaction volume.
06Demolition waste haulage
Removal of crushed concrete slabs, brick, masonry, and road profiling asphalt rubble from urban demolition sites to recycling facilities (typically 15-25 km one-way).
Vaultix assumptions: Payload 34.0 t (volume-limited by rubble voids); cycle time 65.0 min (20 km cartage: careful excavator load 8 min + haul 26 min + tip & tailgate check 6 min + return 22 min + tarp 3 min); loose density 1.35 t/m³; efficiency 75%.
Worked example: (60 / 65.0 min) x 0.75 efficiency = 0.69 trips/hr; 0.69 x 34.0 t = 23.5 t/hr (17.4 m³/hr), or 188 t in an 8-hour shift.
Allow for: Careful bucket placement to prevent body damage, manual tarp edge securing, recycling yard sorting queues, and tailgate release checks.
Pitfalls: Steel rebar catching on tailgates during tipping can hang up load and tip trailer; irregular voids reduce effective payload density.
07Asphalt cartage and paving supply
Delivery of hot mix asphalt (AC14 / AC20) or dense graded asphalt from batch plant to active road resurfacing paver or material transfer vehicle (typically 20-30 km one-way).
Vaultix assumptions: Payload 38.0 t (PBS Level 2); cycle time 68.0 min (22 km haul: load & tarp 8.0 min + haul 26.0 min + paver discharge 16.0 min + return 18.0 min = 68.0 min); loose density 2.35 t/m³; efficiency 80%.
Worked example: (60 / 68.0 min) x 0.80 efficiency = 0.71 trips/hr; 0.71 x 38.0 t = 26.8 t/hr (11.4 m³/hr), or 215 t in an 8-hour shift.
Allow for: Dedicated thermal roll tarps, paver contact roller bump clearance, slow continuous discharge into asphalt paver hopper, and truck washdown at plant.
Pitfalls: Paver stoppages cause asphalt mix cooling, risking load rejection; controlled pushing requires precise alignment to avoid trailer sway.
Estimator checks
- Verify NHVR PBS route approval: Combination operates at 57.5 t GCM on PBS Level 2 networks (approx 40.0 t net payload) or 50.5 t GCM on PBS Level 1 networks (approx 33.0 t net payload). Confirm project access permits before tendering.
- Smart On-Board Mass (OBM) & IAP telematics: Mandatory in NSW, QLD, and VIC for Higher Mass Limits (HML) / PBS access to prove axle group compliance electronically.
- Tipping stability on site: Quad dog trailers have a high center of gravity when hoisted to 8.2 m; require level, compacted tip pads (cross-slope ≤ 2.0° / 1:30) and alignment in a straight line before hoisting.
- Overhead powerline exclusion zones: Hoisted trailer reaches 8.20 m; enforce Look Up and Live protocols with minimum 3.0 m clearance from low-voltage lines and 8.0 m from high-voltage transmission lines.
- Combination tare mass: Standard alloy tipper and quad dog combination tares at approximately 17,500 kg (truck ~11,500 kg, dog trailer ~6,000 kg). Verify tare bridge dockets from specific body builder.
- Production modeling: Haulage output is governed by cycle time (load, haul, split-tip, return, queue), material loose density, and legal axle payloads, rather than vehicle volume alone.
- All hire rate schedules are unquoted placeholders. In accordance with Vaultix estimating principles, never invent hire rates without formal supplier tenders.
- Heavy vehicle driver licensing: Heavy Combination (HC) or Multi-Combination (MC) licence required.
Data basis. Independent check 10 November 2026 against the Kenworth T410 brochure: axle ratings (6.6 t front, 18.1 t and 20.9 t rear, 13.2 t twin front) and the 70 t GCM class matched. Power is listed in horsepower only (460 and 510 hp); the kW figures are conversions. Not verified (not on the sheet): the 12.9 L displacement, bumper-to-back-of-cab, the 450 L fuel tank, the 17,500 kg combination tare, and the tipper body and trailer figures. Reference model: Kenworth T410 (8x4 / 6x4) Rigid Tipper paired with a 4-Axle Dog Trailer (Hercules HEDT-4 / Sloanebuilt 4-AD). Specifications sourced from Kenworth T410 Product Brochure (PACCAR Australia) and NHVR National Class 3 Notice. Sourced 10 November 2026. Fuel burn uses telematics benchmarks for PACCAR MX-13. Productivity and costs are Vaultix estimating models. Sources and assumptions documented in files/truck-quad-dog.md.