Plant / 13 kL (13,000 L) 6x4 rigid water cart

13 kL Water Cart

Heavy-duty 6x4 civil water cart for haul road dust suppression, fill moisture conditioning, compaction support, and site washdown.

13 kL Water Cart
  1. TankUsable water volume governs refill frequency.
  2. Spray barApplication width and rate determine area served.
  3. CarrierInclude travel to refill and return to the workfront.
Illustrative Vaultix machine configuration. Consult the selected model’s data for dimensions and capacities.
Nominal capacity
13,000L
Gross vehicle mass
23,500kg
Direct wet cost
Not quoted yet
Hire rates need dated supplier quotes →

AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.

General class information

Choosing this class of water cart

A 13 kL (13,000 L) 6x4 rigid water cart is an essential production and environmental control machine across Australian civil infrastructure, bulk earthworks, and quarry operations. Built on a heavy-duty 6x4 cab-chassis (such as the Isuzu FVZ 260-300 with 221 kW engine and Allison automatic transmission) and fitted with a baffled hot-dipped galvanised water module, it delivers up to 2,400 L/min pumping capacity across rear fan sprays (12 m swath), side batter sprays, a 2.4 m dribble bar, and a cab-controlled water cannon (55 m throw). Operates within Australian 24.0 t CML/HML mass limits under standard road access.

Heavy-duty 6x4 civil water cart for haul road dust suppression, fill moisture conditioning, compaction support, and site washdown.

13 kL (13,000 L) capacity / 6x4 rigid cab-chassis / Water cart / Civil estimating guide

  • Continuous haul road dust suppression and particulate control on unsealed civil access corridors and mine haul roads
  • Moisture conditioning of bulk earthworks fill, cut-to-fill borrow materials, and structural embankments to achieve OMC
  • Water supply and moisture maintenance for vibratory smooth drum, padfoot, and multi-tyre compaction rollers
  • Gravel re-sheeting watering and unbound granular pavement blending ahead of basecourse shaping and final compaction
  • Site access crossover washdown, wheel wash facility replenishment, and street sweeper support to prevent mud tracking
  • Emergency on-site firefighting standby, site clearing burn protection, and hot works safety with remote water cannon
  • Bulk water transfer for site amenities, dust suppression misting cannons, drill rigs, and sediment pond dewatering

Class planning guide

Published manufacturer specifications for the Isuzu FVZ 260-300 / 13 kL class water cart. Use supplier specifications for exact procurement.

Class planning values
RefItemValuePlanning note
01.01Nominal water capacity13,000 L (13.0 kL / 13.0 t)Fabricated heavy-duty oval tank with internal latitudinal and longitudinal surge baffles.
01.02Gross vehicle mass (laden)23,500 kg (23.5 t)Derived: unladen tare 10,500 kg + 13,000 kg water payload. Operates within 24.0 t CML/HML limit.
01.03Cab-chassis engine & power221 kW (300 PS / 296 hp)Isuzu 6HK1-TCS 7.8 L 6-cylinder turbo-diesel, 981 Nm peak torque @ 1,450 rpm.
01.04Water pump flow & pressure1,800 to 2,400 L/min @ 500 kPa4x3 in cast-iron centrifugal pump with PTO or hydraulic drive.
01.05Spray coverage width10 to 14 m (rear) / up to 18 m (batters)3 rear duckbill fan sprays plus 2 side batter sprays and 2.4 m gravity dribble bar.
01.06Fuel burn allowanceAbout 12 to 25 L/hr (18.0 L/hr civil avg)Isuzu 6HK1 engine in mixed haul and spraying cycle; DEF burn ~0.80 L/hr.
01.07Unladen tare / transport massAbout 10,500 kg (10.5 t)Derived: cab-chassis tare (6,915 kg) + water module tare (3,450 kg) + 200 L fuel (~170 kg).
Choosing the machine
RefItemValuePlanning note
02.01Haul road dust suppressionTriple rear fan sprays (12 m swath)10-14 m single-pass coverage controls particulate dust on unsealed haul corridors.
02.02Fill moisture conditioningDribble bar & heavy duckbillsSupplies uniform moisture into uncompacted borrow fill to achieve Optimum Moisture Content (OMC).
02.03Compaction supportGravity dribble bar (2.4 m)Non-atomised trickle wetting ahead of smooth drum and padfoot rollers prevents crust drying.
02.04Fire & washdownRemote water cannon & hose reelJoystick-controlled cannon (1,400 L/min, 55 m throw) for emergency defense and stockpile spraying.
02.05Highway transitDirect road drive (General Access / CML)Complies with statutory dimensions (2.49 m width, 3.25 m height); no pilot escorts required.

Dimensions and transport planning

Vehicle dimensions reflect the complete 6x4 rigid water truck ready for road transit. Unladen water carts are driven directly via the road network under standard heavy vehicle registration without float transport or oversize permits.

Rigid vehicle dimensions (Isuzu FVZ 260-300 & STG WT13000 reference)
CodeDimensionPublished valuePlanning note
AOverall vehicle travel length8,850 mmComplete vehicle bumper to rear spray bar.
BOverall travel width (mirrors folded)2,490 mmWithin statutory 2.50 m general access width envelope.
COverall travel height (folded safety handrails)3,250 mmTo top of folded safety handrails (3,550 mm raised).
DChassis wheelbase (steer to bogie centerline)5,300 mmIsuzu MLWB chassis wheelbase.
EFront overhang (bumper to steer axle centerline)1,440 mmCab-chassis front overhang.
FRear overhang (bogie centerline to rear spray bar)2,110 mmChassis rear overhang including spray bar.
GTandem axle bogie spread1,370 mmRear drive tandem axle spacing.
HFront steer wheel track2,060 mmCentreline of front steer tyres.
IRear drive wheel track1,850 mmCentreline of rear dual wheels.
JMinimum ground clearance (rear differential bowl)265 mmGround clearance under rear drive axle bowl.
KMinimum turning circle diameter (kerb to kerb)18,500 mmTurning circle for MLWB 6x4 chassis.
LWater tank shell length5,200 mm13 kL modified oval baffled tank shell length.

Working range & capacity

Spray coverage swaths, pumping discharge rates, tank discharge durations, and refill turnaround cycles for the 13 kL water cart. Operating range depends on pump throttle, spray head configuration, and standpipe flow rate.

Working range and operational limits
CodeWorking range & capacity itemPublished value
1Nominal water tank payload capacity13,000 L (13.0 kL / 13.0 t)
2Rear fan spray swath width10.0 to 14.0 m (12.0 m nominal)
3Side batter spray swath width16.0 to 20.0 m (18.0 m nominal)
4Water cannon throw distance45 to 60 m (55 m nominal)
5Continuous road spraying duration per load12 to 18 min (750-1,080 L/min)
6Water cannon continuous discharge duration6.5 to 9.0 min (1,400-2,000 L/min)
7Dribble bar gravity discharge duration25 to 35 min per load
8Overhead standpipe / hydrant refill time5 to 7 min (1,800-2,600 L/min)
9Self-fill suction drafting duration6 to 8 min (4-inch circuit)
10Diesel fuel operating autonomy600 to 800 km (10 to 14 engine hours)
11DEF / AdBlue operating autonomy1,800 to 2,200 km (40 to 50 engine hours)
Cost planning

Direct cost and market hire prices

Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 13 kL water cart class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.

Metro and Remote direct costs

Location comparison (AUD ex GST)
Basis / AUD ex GSTMetroRemote
Direct dry / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Direct wet / hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Water cart driver / paid site hrNot yet quoted (placeholder)Not yet quoted (placeholder)
Delivered diesel / L1.94 (reference proxy)2.23 (reference proxy)
Maintenance, parts and freightBase allowanceBase plus 25%
Roster and campMetro working-week roster14/7 FIFO, 12-hour days, camp and flights

Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.

Mobilisation, separate one-off cost

Excluded from hourly costs
Purchased transport / AUD ex GSTMetroRemote
One delivery eventTo be quoted by haulierTo be quoted by haulier

Driven road delivery or purchased float mobilisation to be quoted based on transport distance, route permits, and road network access. Unladen 6x4 water carts travel under standard heavy vehicle registration without pilot escorts. Allow separate return demobilisation event.

Published hire tariffs: market prices including supplier margin. AUD ex GST.
Source / dateHire basisPer hourPer dayPer weekConditions
Awaiting supplier tender verification
Status: Unquoted placeholder
Dry / Wet pending quotes Not yet quoted Not yet quoted Not yet quoted All hire rate values are unquoted placeholders. When procuring 13 kL water carts in Australia, solicit formal quotations covering wet/dry basis, minimum hours, travel/mobilisation, water authority standpipe permits, and fuel inclusion/levies.

First-principles direct hourly cost

Cost schedule / AUD ex GST
ComponentDirect dry AUD/hrDirect wet AUD/hr
Ownership: depreciation and interestNot yet quotedNot yet quoted
Insurance and registrationNot yet quotedNot yet quoted
Maintenance, servicing, tyres and wear partsNot yet quotedNot yet quoted
Fuel and operating lubricants (18.0 L/hr proxy)0.00Not yet quoted
Water cart driver cost per paid site hour0.00Not yet quoted
Direct cost per operating hourNot yet quotedNot yet quoted

Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.

Vaultix planning estimates

Productivity and calculator

Cycle Time (min) = Fill Time + Laden Haul Time + Spray / Discharge Time + Empty Return Time. Loads per Operating Hour = (60 / Cycle Time min) x Efficiency. Hourly Water Output (L/hr) = Tank Capacity (L) x Loads per Hour. Dust Suppression Coverage Area (m²/hr) = Hourly Water Output (L/hr) / Application Rate (L/m²). All cycle times, fill rates, application rates, and efficiency factors are Vaultix civil estimating assumptions, not OEM guarantees.

Instrument / 01

Production scenario

L/hr

Scenario inputs

Hourly cost defaults to placeholder ($0.00). Enter your project-quoted wet hire or direct cost to calculate unit cost per kL and m². All results are estimates.

Activity estimating guides

Vaultix civil estimating standard, 10 November 2026. Joint planning scenarios, not statistical confidence limits.

Low: cycle times x 1.25 (+25% haul road and standpipe delays), efficiency x 0.85, application rate x 1.25 (+25% dry/windy weather). High: cycle times x 0.80 (-20% rapid circuit), efficiency x 1.10 (cap 1.00), application rate x 0.85 (-15% moist air crusting).

01Haul road dust suppression

Continuous spraying of unsealed project haul roads, quarry access corridors, and highway bypass formations to control airborne particulate matter and maintain environmental compliance.

Vaultix assumptions: Tank capacity 13,000 L; cycle time 30.0 min (fill 6.0 min + haul 7.0 min + spray 12.0 min + return 5.0 min); application rate 1.20 L/m²; efficiency 80%.

Worked example: (60 / 30.0 min) x 0.80 efficiency = 1.60 loads/hr; 1.60 x 13,000 L = 20,800 L/hr. Dust suppression coverage at 1.20 L/m² = 17,333 m²/hr, or 138,667 m² in an 8-hour shift.

Allow for: Haul road traffic coordination, speed-limited haul zones (25 km/h), standpipe queue pacing, and overlapping spray runs.

Pitfalls: Over-watering creates slick slurry and aquaplaning hazards for heavy haul trucks. Calibrate spray nozzles to maintain thin misted application (0.8–1.2 L/m²).

02Moisture conditioning of fill

Uniform water application onto uncompacted borrow or cut fill layers (ripped clay, gravel, or sandy silt) to achieve Optimum Moisture Content (OMC) prior to discing and compaction.

Vaultix assumptions: Tank capacity 13,000 L; cycle time 28.0 min (fill 6.0 min + haul 5.0 min + spray 12.0 min + return 5.0 min); application rate 3.00 L/m²; efficiency 78%.

Worked example: (60 / 28.0 min) x 0.78 efficiency = 1.67 loads/hr; 1.67 x 13,000 L = 21,729 L/hr. Fill moisture conditioning coverage at 3.00 L/m² = 7,243 m²/hr, or 57,944 m² in an 8-hour shift.

Allow for: Scraper/dozer dumping coordination, grader rotary discing integration, short-haul dam drafting, and high discharge volumes.

Pitfalls: Uneven water distribution causes localized soft spots or compaction density failures in earthworks embankments. Ensure immediate blending by grader.

03Compaction water supply

Dedicated moisture maintenance and spray support for vibratory smooth drum, padfoot, and multi-tyre rollers on road base pavement courses and structural fill.

Vaultix assumptions: Tank capacity 13,000 L; cycle time 35.0 min (fill 7.0 min + haul 9.0 min + spray 13.0 min + return 6.0 min); application rate 2.00 L/m²; efficiency 80%.

Worked example: (60 / 35.0 min) x 0.80 efficiency = 1.37 loads/hr; 1.37 x 13,000 L = 17,829 L/hr. Compaction support coverage at 2.00 L/m² = 8,914 m²/hr, or 71,314 m² in an 8-hour shift.

Allow for: Dedicated support to 1–2 active compaction trains, site transit between fills, standpipe replenishment, and QA nuclear gauge density testing.

Pitfalls: Allowing pavement surface to dry out prematurely during rolling causes delamination and shearing of crushed rock basecourse layers.

04Pavement basecourse curing

Controlled light surface watering and hydration curing over freshly trimmed crushed rock road base and gravel pavement layers prior to asphalt or spray seal surfacing.

Vaultix assumptions: Tank capacity 13,000 L; cycle time 36.0 min (fill 6.0 min + haul 8.0 min + spray 15.0 min + return 7.0 min); application rate 0.80 L/m²; efficiency 82%.

Worked example: (60 / 36.0 min) x 0.82 efficiency = 1.37 loads/hr; 1.37 x 13,000 L = 17,767 L/hr. Basecourse misting coverage at 0.80 L/m² = 22,208 m²/hr, or 177,667 m² in an 8-hour shift.

Allow for: Slow uniform pass speeds (10–12 km/h), delicate fan spray atomisation to avoid washing fines out of aggregate matrix, and traffic controller escort.

Pitfalls: High-pressure jetting or excessive application washes binder fines from the basecourse matrix, ruining compaction and surface profile tolerances.

05Wheel wash / street sweeping support

Providing water supply for site exit wheel wash facilities, access crossover washdown, and street sweeper replenishment to prevent mud tracking onto public arterial roads.

Vaultix assumptions: Tank capacity 13,000 L; cycle time 56.0 min (fill 6.0 min + haul 12.0 min + spray 28.0 min + return 10.0 min); application rate 1.50 L/m²; efficiency 75%.

Worked example: (60 / 56.0 min) x 0.75 efficiency = 0.80 loads/hr; 0.80 x 13,000 L = 10,446 L/hr. Crossover and exit washdown coverage at 1.50 L/m² = 6,964 m²/hr, or 55,714 m² in an 8-hour shift.

Allow for: Intermittent discharge, public road traffic control integration, hose reel washdown, and sweeper coordination.

Pitfalls: Failure to clean public road crossovers causes environmental and municipal authority infringement notices and roadway traction hazards.

06Subgrade stabilisation and pre-wetting

High-volume pre-wetting of clay subgrades and sub-base layers ahead of lime or cement spreading and in-situ soil stabiliser / reclaimer rotary mixing.

Vaultix assumptions: Tank capacity 13,000 L; cycle time 27.0 min (fill 6.0 min + haul 6.0 min + spray 10.0 min + return 5.0 min); application rate 4.00 L/m²; efficiency 80%.

Worked example: (60 / 27.0 min) x 0.80 efficiency = 1.78 loads/hr; 1.78 x 13,000 L = 23,111 L/hr. Subgrade deep-wetting coverage at 4.00 L/m² = 5,778 m²/hr, or 46,222 m² in an 8-hour shift.

Allow for: Synchronization with bulk spreader trucks, road reclaimer advance speed (4–8 m/min), and fast standpipe or dam refilling.

Pitfalls: Inadequate pre-hydration leads to incomplete chemical hydration of quicklime or cement binders, resulting in non-uniform subgrade CBR strength.

07Fire-fighting standby

Emergency standby, first-response site fire suppression, and rapid filling of water-filled road safety crash barriers along work zones.

Vaultix assumptions: Tank capacity 13,000 L; cycle time 22.0 min (fill 6.0 min + haul 4.0 min + spray 8.0 min + return 4.0 min); application rate 2.50 L/m²; efficiency 90%.

Worked example: (60 / 22.0 min) x 0.90 efficiency = 2.45 loads/hr; 2.45 x 13,000 L = 31,909 L/hr. Rapid spray and barrier filling at 2.50 L/m² = 12,764 m²/hr, or 102,109 m² in an 8-hour shift.

Allow for: Dedicated on-station readiness during high fire danger index (FFDI > 50), rapid dam drafting, and full-throttle monitor operation.

Pitfalls: Operating water cannon near unshielded electrical conductors or unstable edge batters creates electrical shock and crest collapse hazards.

Estimator checks

  • Statutory Mass vs OEM GVM: Statutory general access under NHVR General Mass Limits (GML) restricts 6x4 rigid trucks to 22.5 t (or 23.0 t with steer tyre mass concession). Carrying a full 13,000 L payload (13.0 t) plus 10.5 t tare yields 23.5 t GVM, operating within 24.0 t Concessional Mass Limits (CML) or Higher Mass Limits (HML) with certified road-friendly airbag suspension and Smart OBM telematics.
  • Tare Mass Variation: Module tare mass varies by body builder (~3,450 kg for STG Global hot-dipped galvanised steel vs ~3,600 kg for Shermac/Plantman heavy-duty steel with poly lining). Verify certified tare mass docket from the specific body builder prior to finalized legal axle mass sign-off.
  • Spray Suite Specification: Standard build includes 3 rear duckbill fan sprays (10-14 m swath), 2 side batter sprays (16-20 m combined swath), 2.4 m gravity dribble bar, and joystick-controlled water cannon. Verify cab control toggles allow independent pneumatic isolation of each spray head.
  • Standpipe vs Self-Fill Drafting: High-volume 100 mm overhead site standpipe fills 13 kL in 5 to 7 min. For remote sites without pressurized water infrastructure, allow 6 to 8 min for draft filling using the onboard 4-inch self-priming suction circuit and 6 m suction hose.
  • Water Sourcing & Permits: Connection to municipal mains requires local water authority standpipe permits and verified anti-syphon air gap compliance to prevent potable backflow contamination.
  • Licensing & Competency: Operates under Australian Heavy Vehicle National Law (HVNL); driver must hold an Australian Medium Rigid (MR) or Heavy Rigid (HR) driver licence, White Card, and site-specific Verification of Competency (VOC). No HRWL is required.
  • All hire rate schedules are unquoted placeholders. In accordance with Vaultix estimating principles, never invent hire rates without formal supplier tenders.
  • Output is area-governed (m²/hr) and volume-governed (L/hr). Balance water cart turnaround cycles with earthworks compaction trains and dust suppression demand.
  • Australian HVNL driver licensing: Heavy Rigid (HR) or Medium Rigid (MR) driver licence and site VOC required; no HRWL class applies.

Data basis. Independent check 10 November 2026 against the Isuzu FVZ 260-300 sheet (ARK1390): 8 of 8 chassis values matched (GVM 26,000 kg, GCM 36,000 kg, power 221 kW, torque 981 Nm, axles). Not verified: the 13,000 L tank size and pump and spray details (the supplier sheet is photographs only), and the earlier DEF tank and SCR claim (the Isuzu sheet lists cooled EGR with a particulate filter and no DEF tank). The cited Isuzu web address returned an error; the sheet was read from another copy. Reference model: Isuzu FVZ 260-300 (6x4) MLWB Auto cab-chassis fitted with STG Global WT13000 (13,000 L / 13 kL) hot-dipped galvanised water module. Sourced 10 November 2026 from Isuzu Australia and STG Global technical data sheets. Mass limits sourced from NHVR regulations. Fuel consumption uses fleet telematics benchmarks for the Isuzu 6HK1 engine (18.0 L/hr civil average). Productivity uses Vaultix civil estimating cycle-time models. Sources and assumptions documented in files/water-cart-13kl.md.

Notes / 0113 kL Water Cart / estimating referenceScale NTS Source: Vaultix plant library. Sources and assumptions

Entry / water-cart-13kl   Issue / 2026-11-10