Plant / 3 to 4 m³ articulated wheel loader (20 to 24 t class)
3 m³ Wheel Loader
The primary rehandling machine for highway construction, civil earthworks, quarry operations, and concrete/asphalt batch plants throughout Queensland and Australia.
- BucketFill factor and material density set the load per cycle.
- Lift armsDump height and loading position affect truck servicing.
- ArticulationTravel and turning distance influence the loading cycle.
- Standard bucket
- 3.1m³
- Net power
- 168kW
AUD ex GST. *Unquoted placeholder. In accordance with Vaultix estimating principles, hire rates are never invented or extrapolated. Obtain current supplier quotations.
Choosing this class of wheel loader
A 3 to 4 m³ articulated wheel loader (20 to 24 t class, such as the Caterpillar 950 GC) is the standard rehandling and truck-loading workhorse across Australian civil infrastructure, quarries, and stockpile yards. Combining a 3.1 m³ general-purpose bucket, 168 kW net power, heavy-duty Z-bar linkage, and powershift transmission, it excels across highway truck loading, stockpile rehandling, crusher feeding, and civil site housekeeping.
The primary rehandling machine for highway construction, civil earthworks, quarry operations, and concrete/asphalt batch plants throughout Queensland and Australia.
20 to 24 t class / 3.1 m³ bucket / Articulated wheel loader / General estimating guide
- Loading highway road trucks and articulated dump trucks from stockpiles or excavated faces
- Stockpile rehandling, benching, material blending and surge pile shaping
- Feeding mobile and fixed crushing, screening, and pugmill plants
- Quarry face loading of blasted or ripped rock and raw aggregates
- Bulk earthworks fill rehandling, layer placement, and site material transfer
- Batch plant charging and aggregate bin loading in concrete and asphalt plants
- Civil site clean-up, haul road spillage removal, and workfront housekeeping
Class planning guide
Published manufacturer specifications for the Caterpillar 950 GC / 20 to 24 t class wheel loader. Use supplier specifications for exact procurement.
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 01.01 | Operating mass | 18,849 kg (equipped) / 18,800 to 19,586 kg range | With 3.1 m3 GP BOCE bucket, 23.5R25 L3 tyres, full fluids, 75 kg operator; range across all brochure bucket/coupler options. |
| 01.02 | Engine net power | 168 kW (225 hp) | Cat C7.1 ACERT at 1,700 rpm (ISO 9249 / SAE J1349); gross power 179 kW (240 hp). |
| 01.03 | Standard bucket | 3.10 m3 rated (3.40 m3 @ 110% fill) | General Purpose Pin-On bucket with Bolt-On Cutting Edges (BOCE). |
| 01.04 | Rated operating payload | 5,503 kg (5.50 t) (Derived) | Derived: 11,006 kg x 0.50 = 5,503 kg (50% of full 38 deg turn static tipping load per ISO 14397-1). |
| 01.05 | Breakout force | 154 kN (34,638 lbf) | With 3.10 m3 GP BOCE bucket; up to 168 kN with 2.90 m3 teeth bucket. |
| 01.06 | Hydraulic cycle time | 9.4 s total | Raise 5.4 s, dump 1.2 s, lower float 2.8 s. |
| 01.07 | Fuel burn allowance | Not verified | Not published in AEHQ7967 or AEXQ1967; requires telematics or Cat Performance Handbook. |
| 01.08 | Shipping mass | 18,849 kg (Operating mass proxy) | Brochure publishes operating weight only. Confirm bare dry transport mass with haulier. |
| Ref | Item | Value | Planning note |
|---|---|---|---|
| 02.01 | Truck loading | 3.1 m3 GP bucket & 3,050 mm dump clearance | 3–4 pass match to highway tippers and 6x4/8x4 trucks; clears standard sideboards. |
| 02.02 | Stockpile rehandling | 110% fill factor & 9.4 s hydraulic cycle | High breakout force (154 kN) and fast cycle times optimize loose bulk aggregate rehandling. |
| 02.03 | Load and carry | Cat Ride Control & 4-speed powershift | Ride Control dampens boom pitch during haul runs up to 36 km/h. |
| 02.04 | Quarry & face | Heavy-duty Z-bar linkage & radial L3 tyres | High breakout pry-out and durable 23.5R25 radial tyres for rough quarry floors. |
| 02.05 | Transport | Low-loader float (OSOM permit) | 2.93 m bucket width and 3.46 m machine height require oversize permits and low float deck. |
Dimensions and transport planning
Machine dimensions exclude the transport float trailer. Obtain verified deck height, loaded envelope, axle group weights, route clearance and restraint plans from haulier before mobilisation.
| Code | Dimension | Published value | Planning note |
|---|---|---|---|
| 1 | Height to top of ROPS | 3,458 mm | Standard ROPS/FOPS cab; loaded float height requires low deck to stay near 4.30 m. |
| 2 | Height to top of exhaust pipe | 3,416 mm | Vertical exhaust stack clearance from ground line. |
| 3 | Height to top of hood | 2,673 mm | Rear engine hood profile height. |
| 4 | Ground clearance | 460 mm | Minimum clearance under center articulation / axle. |
| 5 | B-pin height at maximum lift | 4,188 mm | Maximum hinge pin elevation for high-sided hopper or truck loading. |
| 6 | Rear axle centreline to edge of counterweight | 2,055 mm | Rear overhang for float deck positioning and turning swing. |
| 7 | Wheelbase | 3,300 mm | Axle-to-axle wheelbase providing longitudinal stability. |
| 8 | B-pin height at carry | 655 mm | Standard carry position elevation per SAE / ISO standards. |
| 9 | Rear axle centreline to hitch | 1,650 mm | Distance to central articulation hitch joint. |
| 14 | Height to axle centreline | 750 mm | Static axle height with standard 23.5R25 tyres. |
| 15 | Lift arm clearance | 3,649 mm | Clearance under lift arms at full lift. |
| LEN | Overall length, bucket on ground (3.1 m3 GP BOCE) | 8,292 mm | With standard 3.1 m³ GP BOCE bucket rested on deck. |
| HMAX | Overall height, bucket at maximum lift (3.1 m3 GP BOCE) | 5,642 mm | Maximum vertical envelope during discharge cycle. |
| WTIRE | Width over tyres (23.5R25 Maxam MS302) | 2,822 mm | Exceeds 2.50 m general access; requires Class 1 OSOM notice/permit. |
| WBKT | Bucket width (3.1 m3 GP BOCE) | 2,927 mm | Maximum transport width; oversize warning banners/flags required. |
| TURN-O | Turning radius, outside of tyres / counterweight | 6,196 mm | Turning radius outside tyres; 38° full articulation angle. |
| TURN-I | Turning radius, inside of tyres | 3,419 mm | Inner clearance radius during maximum articulation. |
Working range & kinematics
Kinematic capabilities for dump clearance, reach, digging depth, bucket angles and rated operating capacity. Allow for material density, bucket fill factors, and stable footing.
| Code | Kinematic range item | Published value |
|---|---|---|
| 1 | Dump clearance at max lift and 45 deg discharge | 3,050 mm |
| 2 | Reach at max lift and 45 deg discharge | 1,261 mm |
| 3 | Reach at level lift arm, bucket level | 2,719 mm |
| 4 | Digging depth | 86 mm |
| 5 | Loader clearance circle diameter (bucket at carry) | 13,819 mm |
| 6 | Rack back at maximum lift (degrees) | 60 degrees |
| 7 | Dump angle at maximum lift (degrees) | 52 degrees |
| 8 | Rack back at carry (degrees) | 45 degrees |
| 9 | Rack back at ground (degrees) | 40 degrees |
| 10 | General purpose bucket capacity (pin-on BOCE) | 3.10 m3 rated (3.40 m3 @ 110%) |
| 11 | Light material bucket capacity | 4.40 m3 rated (4.80 m3 @ 110%) |
| 12 | Rated safe payload limit (50% full-turn tipping) | 5,503 kg (5.50 t) (Derived) |
Direct cost and market hire prices
Never invent hire rates. In strict accordance with Vaultix estimating governance, all hire rate figures for this 20-24 t (3 m³) wheel loader class are recorded as not-yet-quoted placeholders. Enter verified project supplier quotes in the calculator below.
Metro and Remote direct costs
| Basis / AUD ex GST | Metro | Remote |
|---|---|---|
| Direct dry / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Direct wet / hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Wheel loader operator / paid site hr | Not yet quoted (placeholder) | Not yet quoted (placeholder) |
| Delivered diesel / L | 1.94 (reference proxy) | 2.23 (reference proxy) |
| Maintenance, parts and freight | Base allowance | Base plus 25% |
| Roster and camp | Metro working-week roster | 14/7 FIFO, 12-hour days, camp and flights |
Standing decision: Rates for this class have not yet been quoted or audited for vaultix.com.au. To ensure estimating integrity, rates are never estimated from other classes without supplier evidence. Estimators can input their project quotes directly in the instrument below.
Mobilisation, separate one-off cost
| Purchased transport / AUD ex GST | Metro | Remote |
|---|---|---|
| One delivery event | To be quoted by haulier | To be quoted by haulier |
Float mobilisation depends on transport distance, route permits, oversize permits and warning requirements (for 2.93 m bucket width) and low-loader float deck height. Allow separate return demobilisation event.
| Source / date | Hire basis | Per hour | Per day | Per week | Conditions |
|---|---|---|---|---|---|
| Awaiting supplier tender verification Status: Unquoted placeholder |
Dry / Wet pending quotes | Not yet quoted | Not yet quoted | Not yet quoted | All hire rate values are unquoted placeholders. Obtain 3 dated project rate cards including bucket and coupler options, fuel inclusion, wear terms and float transport costs. |
First-principles direct hourly cost
| Component | Direct dry AUD/hr | Direct wet AUD/hr |
|---|---|---|
| Ownership: depreciation and interest | Not yet quoted | Not yet quoted |
| Insurance and registration | Not yet quoted | Not yet quoted |
| Maintenance, servicing, tyres and GET | Not yet quoted | Not yet quoted |
| Fuel and operating lubricants (unverified proxy) | 0.00 | Not yet quoted |
| Wheel loader operator cost per paid site hour | 0.00 | Not yet quoted |
| Direct cost per operating hour | Not yet quoted | Not yet quoted |
Placeholder. Replace with a current supplier quote; no hire rates are invented or assumed.
Productivity and calculator
Loads/hr = 3,600 / cycle time (s). Output (t/hr) = bucket payload (t) × loads/hr × job efficiency. Bucket payload is capped at the ISO 14397-1 50% full-turn static tipping limit (5,503 kg / 5.50 t). All cycle times, payloads, and efficiency factors are Vaultix civil estimating assumptions.
Activity estimating guides
Vaultix estimating standards, 11 November 2026. Joint planning scenarios, not statistical confidence limits.
Output (t/hr) = bucket payload (t) × (3,600 / cycle time s) × efficiency. Bucket payload is capped at the ISO 14397-1 50% full-turn tipping limit (5.50 t).
01Loading trucks from stockpile
Rehandling loose sand, gravel, or crushed aggregate (1.55–1.65 t/m³, 100–110% fill factor per AEHQ7967 p. 14) with 3.10 m³ GP BOCE bucket into highway tippers or articulated dump trucks using a tight V-pattern (26–36 s cycle including 9.4 s hydraulic cycle).
Vaultix assumptions: Payload 5.46 t (3.10 m³ GP bucket at 1.60 t/m³, 110% fill); cycle time 30 s (120 loads/hr); job efficiency 80%; speed 12.8 km/h (F2).
Worked example: 5.46 t × (3,600 / 30) × 0.80 = 524.2 t/hr (most likely); range 336.0 to 647.3 t/hr. Derived per ISO 14397-1 rated operating payload limit (5.50 t).
Allow for: Truck positioning, haul queue delays, floor clean-up, and operator coordination.
Pitfalls: Truck overloading; exceeding ISO 14397-1 50% full-turn tipping limit (5.50 t) causing machine rear-end instability.
02Pit and quarry loading
Excavating bank gravel, ripped borrow, or shot rock (≥76 mm rock at 1.60 t/m³ and 85–105% fill factor per AEHQ7967 p. 14) from face into off-highway trucks. Longer crowding and turn cycles (32–45 s) and lower job efficiency due to face floor cleanup and truck spotting.
Vaultix assumptions: Payload 4.96 t (85–105% fill factor); cycle time 38 s (94.7 loads/hr); job efficiency 75%; speed 7.3 km/h (F1).
Worked example: 4.96 t × (3,600 / 38) × 0.75 = 352.4 t/hr (most likely); range 218.4 to 488.9 t/hr.
Allow for: Floor rock clearing, rock sorting, tyre wear management, and face safety standoff.
Pitfalls: Severe tyre spin when penetrating bank face cuts tyre life; oversized rock exceeding bucket capacity.
03Stockpile management
Pushing up, benching, blending, and re-stacking tipped material onto stockpiles (15–30 m push/carry and ramp climb, 30–48 s cycle).
Vaultix assumptions: Payload 5.20 t; cycle time 38 s (94.7 loads/hr); job efficiency 80%; speed 12.8 km/h (F2).
Worked example: 5.20 t × (3,600 / 38) × 0.80 = 394.1 t/hr (most likely); range 236.3 to 561.0 t/hr.
Allow for: Ramp grade negotiation, aggregate moisture blending, and stockpile edge berm formation.
Pitfalls: Operating on loose stockpile slopes risks rollover; maintain carry height low (655 mm B-pin carry).
04Feeding crushers
Load-and-carry from blast pile or surge stockpile to mobile/fixed crusher or screening hopper over a 25–60 m one-way haul in F2 (12.8 km/h max) with Ride Control engaged, including metered dump over grizzly (40–65 s cycle).
Vaultix assumptions: Payload 5.10 t; cycle time 50 s (72 loads/hr); job efficiency 75%; speed 12.8 km/h (F2).
Worked example: 5.10 t × (3,600 / 50) × 0.75 = 275.4 t/hr (most likely); range 165.6 to 410.9 t/hr.
Allow for: Hopper grizzly bridging clearance, metered feed discharge, and haul road maintenance.
Pitfalls: Surge dumping can bridge crusher jaw; engage Ride Control to prevent load spillage on haul run.
05Bulk earthworks rehandling & transfer
Rehandling bulk fill, unclassified earthworks, or subbase gravel from temporary site spoil piles or haul dumps, carrying 20–40 m and spreading/layer placement (30–44 s cycle).
Vaultix assumptions: Payload 5.20 t; cycle time 36 s (100 loads/hr); job efficiency 78%; speed 12.8 km/h (F2).
Worked example: 5.20 t × (3,600 / 36) × 0.78 = 405.6 t/hr (most likely); range 257.7 to 554.4 t/hr. Derived per ISO 14397-1 rated operating payload limit (5.50 t).
Allow for: Loose ground rolling resistance, haul route maintenance, and dump layer thickness control.
Pitfalls: Traveling with elevated bucket destabilises chassis on uneven haul routes; maintain 655 mm carry height.
06Batch plant charging & bin loading
Charging concrete or asphalt batch plant aggregate cold feed bins with washed sand, coarse aggregates, or screenings from adjacent bays (30–60 m run, elevated ramp climb, precise bin dumping, 42–58 s cycle).
Vaultix assumptions: Payload 5.30 t; cycle time 48 s (75 loads/hr); job efficiency 80%; speed 12.8 km/h (F2).
Worked example: 5.30 t × (3,600 / 48) × 0.80 = 318.0 t/hr (most likely); range 204.2 to 400.7 t/hr.
Allow for: Cold feed partition clearance, ramp grade traction, bin level coordination, and avoiding aggregate cross-contamination.
Pitfalls: Contacting bin dividers with 2,927 mm wide bucket; bin overflow spillage causing tyre damage.
07Civil site clean-up
Haul road spillage recovery, quarry floor scraping, crusher apron cleanup, and bench toe tidying. Partial bucket fills (35–75% of rated payload) and extended sweeping/travel cycles (45–75 s).
Vaultix assumptions: Payload 3.10 t; cycle time 60 s (60 loads/hr); job efficiency 70%; speed 7.3 km/h (F1).
Worked example: 3.10 t × (3,600 / 60) × 0.70 = 130.2 t/hr (most likely); range 57.6 to 268.8 t/hr.
Allow for: Intermittent back-blading, sweeping spillage, and maneuvering in congested plant areas.
Pitfalls: Cutting into hard subbase with cutting edge causes premature wear and shock loads to loader linkage.
Estimator checks
- Rated operating load: Safe working payload per ISO 14397-1 / SAE J818 is 5,503 kg (5.50 t) (Derived), calculated as 50% of the full 38 deg turn static tipping load with tyre deflection (11,006 kg). Never size buckets or cycle payloads above 5.50 t.
- Bucket matching: Standard 3.10 m³ GP pin-on bucket with BOCE is matched to crushed rock and aggregate (1.55–1.65 t/m³ at 100–110% fill). For lighter materials (mulch, coal ≤1.2 t/m³), specify the 4.40 m³ light material bucket.
- Transport permits: Machine width of 2,927 mm across bucket (2,822 mm over tyres) exceeds 2.50 m Australian general access (NHVR). An Oversize / Overmass (OSOM) Class 1 permit/notice, warning flags, and daytime travel conditions are required.
- Transport height: Bare machine height to ROPS is 3,458 mm. When loaded on a standard 900 mm drop-deck float, overall height reaches 4,358 mm, exceeding the standard 4.30 m clearance; transport requires a low-loader (<840 mm deck) or a 4.60 m route permit.
- Shipping weight: Standard equipped operating mass is 18,849 kg (up to 19,586 kg with Fusion coupler). Dry bare shipping mass is Not verified in brochure; 18.85 t is adopted as conservative transport planning mass.
- Fuel allowance: Hourly fuel burn rate is Not verified in manufacturer brochures AEHQ7967 / AEXQ1967; obtain telematics data (Cat Product Link) or Cat Performance Handbook consumption tables for site duty cycle.
- All hire rate schedules are unquoted placeholders. In accordance with Vaultix estimating principles, never invent hire rates without formal supplier tenders.
- No HRWL class required; operator competency confirmed by VOC and national unit RIIHAN308F / RIIMPO304E.
Data basis. Reference model: Caterpillar 950 GC Wheel Loader, OEM brochure AEHQ7967 (01-2017) and spec sheet AEXQ1967 (11-2016). Sourced 11 November 2026. Fuel burn rate is Not verified in brochure. Productivity and costs are Vaultix cycle time and payload estimating models. Sources and assumptions documented in files/wheel-loader-3m3.md.