Temporary works / Excavation support

Cofferdams

Cofferdams are engineered temporary enclosures constructed in, across, or adjacent to open water or saturated ground to exclude water and retain soil, providing a dewatered workspace for bridge piers, pump stations, and maritime substructures. For civil estimators and construction planners, cofferdams are high-risk, capital-intensive temporary works where hydrodynamic forces, basal heave, clutch seepage, and marine plant logistics govern cost and programme certainty. Accurate budgeting demands first-principles allowances for structural steel hire or purchase, underwater tremie concrete plugs, continuous dewatering and water treatment, and mandatory RPEQ or CPEng engineering certification.

Cofferdam and internal bracing
  1. Sheet pile enclosureInspect the wall line and enclosure interfaces.
  2. Internal bracingLink each installed brace to its released excavation stage.
  3. Dry excavationMaintain inspection access and record water conditions.
Construction context for Cofferdams. The guide below gives the method and release checks.

What it is

In Australian civil construction, a cofferdam is an engineered temporary enclosure constructed in, across, or adjacent to open water or saturated ground to exclude water and retain soil, creating a safe, dewatered workspace for substructure construction. Structurally and geotechnically, cofferdams resist hydrostatic head, hydrodynamic wave and current actions, lateral earth pressures, and plant surcharges, while controlling seepage and basal hydraulic heave through cut-offs or submerged tremie concrete plugs. Under Australian WHS regulations and state road specifications such as Transport for NSW TS 01723 and Queensland TMR MRTS03 and MRTS70, cofferdams represent safety-critical temporary works. Catastrophic failures pose severe drowning, collapse, and waterway pollution hazards. Consequently, they require a formal Temporary Works Design Brief, limit-state structural and geotechnical analysis, and mandatory independent RPEQ or CPEng design certification before installation, dewatering, and personnel entry.

Schematic cross-section of a sheet pile cofferdam showing internal walers, struts, underwater tremie concrete plug, and water level exclusion
Fig 1Sheet Pile Cofferdam Structural Section and Tremie Plug DetailNot to scaleSource: Vaultix schematic. Illustrative only, not a design.

Common types

TypeWhat distinguishes itTypical use
Sheet pile cofferdams (Cantilever, braced, tied-back)Hot-rolled steel Z- or U-piles driven in closed perimeters into bearing strata. Cantilever walls rely on ground embedment for shallow cuts; braced walls utilise internal horizontal walers and cross-struts for deep heads; tied-back walls incorporate external ground anchors or deadman piles to preserve an open, unobstructed interior. Interlocks require applied sealants to restrict seepage.Bridge piers, abutments, cut-and-cover corridors, dry dock entrances, and maritime retaining walls.
Cellular sheet pile cofferdamsStraight-web steel sheet piles interlocked into circular or diaphragm cells backfilled with free-draining granular soil. Acts as a self-supporting gravity mass resisting overturning and sliding without internal struts; well suited to wide waterways and hard rock riverbeds where pile penetration is limited, but requires substantial fill volumes and a broad footprint.Major river barrages, dam construction, navigation weir diversions, deep-water shipping berths, and sites with shallow bedrock.
Braced cofferdams (Framed ground support)Heavy structural steel framing (universal beams, universal columns, tubular pipe struts, or proprietary hydraulic braces) providing rigid perimeter support to sheet pile or secant pile walls. Engineered to withstand intense combined lateral earth and hydrostatic pressures in deep, congested excavations; modular hydraulic struts enable rapid pre-loading and load monitoring.Deep bridge pier footings, wastewater pump station wet wells, intake towers, and congested urban substructure excavations.
Caisson cofferdams (Open, pneumatic, sinking caissons)Prefabricated hollow reinforced concrete or structural steel boxes sunk to foundation depth by excavating soil from within under self-weight or added kentledge ballast. Open caissons are excavated through water before being plugged with underwater tremie concrete; pneumatic caissons utilise compressed air chambers to permit excavation in the dry. Frequently incorporated directly into the permanent structure.Deep bridge foundations in heavy marine or river currents, deep pump station shafts, and microtunnelling reception pits.
Earth bunds (Earthen dykes / Coffer bunds)Trapezoidal embankments formed from compacted low-permeability clay or rockfill placed directly into shallow water. Lowest initial capital cost using standard earthmoving plant, but wide flat batters (typically 1:2 to 1:3) consume waterway cross-section; requires clay cores or geomembrane cut-offs with heavy rock riprap armour to prevent scour and internal piping erosion.Shallow stream diversions, access causeways, canal repairs, wetland environmental works, and low-velocity riverbanks.
Bag bunds and flexible barriersStacked geotextile bulk bags filled with sand or gravel, small sandbags, or portable water-inflated elastomer barrier tubes. Rapid, low-cost deployment and removal for shallow water depths that conforms readily to irregular riverbeds, but vulnerable to punctures, overtopping erosion, and lateral sliding under high stream velocities.Shallow creek works, culvert replacements, weir maintenance, and headwall repairs.

When it is used

  • Bridge substructure construction for piers, pile caps, and abutments located in rivers, estuaries, and marine harbours.
  • Water and wastewater asset installations, including deep wet wells, intake towers, and pump stations extending below the water table.
  • In-stream culvert and weir construction, weir gate repairs, and civil infrastructure requiring stream diversion.
  • Marine retaining structures, including seawalls, wharf footings, lock chambers, and dry dock entrances.
  • Deep utility shafts, outfall structures, river pipeline crossings, and microtunnelling launch or reception pits.
  • Cut-and-cover transport corridors, depressed urban highway alignments, and rail underpasses in saturated ground.
  • Deep foundation construction around driven or bored pile groups located in water-bearing soils.
  • Dam toe drainage works, spillway upgrades, and intake tower maintenance requiring isolated dry working zones.

Do not use cofferdams in deep open marine waters subject to severe waves and currents where jacket structures, gravity caissons, or monopiles are required instead. Avoid driven sheet pile cofferdams in impenetrable bedrock without overburden embedment unless secured with toe rock berms, pin piling, or designed as gravity caissons. Cofferdam bunds should not be used where waterway cross-section constriction creates upstream flood risks or navigation hazards, where contaminated harbour sediments would be disturbed, or in compressible soft clays adjacent to sensitive infrastructure where dewatering induces settlement damage without cut-offs and recharge.

Components and how it works

  • Perimeter cut-off wall. Steel sheet piles (Z- or U-profile), cellular straight-web piles, precast caissons, or compacted earthen bunds forming an impermeable barrier that excludes external water and retains perimeter soil.
  • Clutch sealants. Bitumastic compounds, polyurethane injection grouts, or hydrophilic swelling sealants applied into sheet pile interlocks to prevent water infiltration under high differential heads.
  • Internal framing and propping. Heavy universal beam (UB) or column (UC) walers, tubular steel pipe struts, corner knee braces, and modular hydraulic struts transferring external hydrostatic and earth loads across the pit.
  • Driving falsework and guide templates. Heavy steel tubular spud piles, guide beams, and bi-level template frames ensuring sheet pile verticality, panel alignment, and interlock integrity during driving.
  • Basal tremie plug. A mass concrete slab cast underwater across the excavation base using tremie pipes to prevent basal hydraulic boiling, provide gravity ballast against uplift, and seal the bottom before dewatering.
  • Anchorage systems. High-tensile steel tie rods, ground anchors, or deadman anchor piles providing lateral support to sheet pile walls in tied-back configurations to maintain an open workspace.
  • Dewatering and sump pumps. High-head electric submersible pumps, diesel trash pumps, perimeter drainage channels, and collection sumps continuously removing seepage and rainfall runoff.
  • Water treatment skids. Lamella clarifiers, sediment settlement tanks, floating silt curtains, and automated pH adjustment dosing skids ensuring discharge effluent satisfies environmental limits.
  • Access and safety equipment. Modular scaffold stair towers, certified crane-rated rescue davits, perimeter edge protection, lifebuoys, and automated high-level flood alarm telemetry.

Typical installation and removal sequence follows six steps: 1. Complete bathymetry surveys, geotechnical boreholes to AS 1726, Temporary Works Design Brief (TWDB) formulation, and independent RPEQ or CPEng design certification. 2. Establish crane barge mooring or rock causeway access, anchor bi-level driving guide templates, and drive perimeter sheet piles with vibratory and impact hammers. 3. Excavate underwater to plug formation level using crane-mounted clamshell buckets or suction dredges, and jet-clean sheet pile pan interlocks. 4. Pour a mass concrete tremie plug underwater and cure for a minimum of 48 hours to establish a watertight basal seal resisting uplift. 5. Dewater the enclosure in controlled stages, progressively installing internal steel walers, struts, and sump pumps as the water drops. 6. Construct the permanent substructure works, then equalise water heads across the wall via flood sluices before dismantling internal framing, extracting sheet piles with crane-hung vibratory extractors, and reinstating the waterway bed.

Australian standards and rules

Checked 10 November 2026. Each document was looked up in catalogue and regulator listings; the text of the standards was not read. Rows marked Not verified were not found or could not be checked. Confirm the current edition before relying on any document. Figures quoted on this page, such as loads, tolerances, heights, depths and inspection intervals, are typical values and are unverified unless a row cites the rule.

DocumentWhat it covers for this itemStatus
AS 5100.3:2017 (Bridge design, Part 3: Foundation and soil-supporting structures)Bridge foundation and cofferdam limit-state loads, geotechnical capacity, and hydrodynamic actions.Confirmed
AS 2159:2009 (Piling—Design and installation)Steel sheet pile driving tolerances, installation integrity, and corrosion durability factors.Confirmed
AS 4678:2002 (Earth-retaining structures)Earth-retaining structure design, lateral earth and hydrostatic pressures, and limit-state stability.Confirmed
AS 4100:2020 (Steel structures)Design, member capacity, and buckling checks for structural steel walers, struts, and brackets.Confirmed
AS 3600:2018 (Concrete structures)Concrete material specifications and structural design rules for underwater mass concrete tremie plugs.Confirmed
AS/NZS 3012:2019 (Electrical installations—Construction and demolition sites)Construction site switchboards, dewatering submersible pump earthing, and RCD protection in wet environments.Confirmed
AS 2865:2009 (Confined spaces)Atmospheric testing, safe ventilation, entry permits, and emergency rescue protocols for deep cofferdam shafts.Confirmed
Model Code of Practice: Excavation work (Safe Work Australia)Excavation shoring, batter stability, collapse prevention, and worker safety rules for excavations over 1.5 m deep.Confirmed
Model Code of Practice: Managing electrical risks in the workplace (Safe Work Australia)Electrical risk management and isolation procedures for electric pumping plant operating in saturated locations.Not verified
CIRIA SP95: The design and construction of sheet-piled cofferdamsComprehensive engineering design rules, waler layouts, water pressure distributions, and construction procedures.Not verified
CIRIA C760: Guidance on embedded retaining wall designEmbedded retaining wall analysis, soil-structure interaction modeling, embedment depths, and basal stability checks.Confirmed
CIRIA C517: Temporary propping of deep excavationsDesign, installation, pre-loading, and thermal expansion considerations for excavation struts and walers.Confirmed
CIRIA C750: Groundwater control: design and practice (2nd Ed.)Groundwater control, dewatering pump selection, seepage analysis, and aquifer depressurisation.Not verified
BS 5975-1:2024 and BS 5975-2:2024: Code of practice for temporary works proceduresProcedural control of temporary works, Temporary Works Coordinator (TWC) duties, design briefs, and Category 3 checks.Confirmed (edition corrected)
Transport for NSW TS 01723: Earthworks for Bridgeworks (ATS-5110-25 MOD)NSW bridge earthworks, cofferdam stability, underwater tremie concrete plugs, and mandatory design certification.Confirmed
QLD Department of Transport and Main Roads MRTS03 & MRTS70Queensland road specifications for civil excavation, cofferdam construction, dewatering, and underwater concrete placement.Confirmed
Managing Urban Stormwater: Soils and Construction (Blue Book, Landcom / NSW Govt)Sediment basin design, flocculation methods, turbidity control, and environmental water discharge limits.Not verified

Check the current edition before relying on any document. Temporary works need a competent person's design and inspection; this page is not a design guide.

Estimating considerations

  • Water depth and hydrostatic head. External water depth and design head dictate sheet pile section modulus, wall weight, number of internal bracing tiers, and pump duty, driving overall steel tonnage and crane capacity requirements.
  • Sheet pile procurement: hire versus purchase. Short-duration works favour weekly dry hire of sheet piles, while multi-stage projects or extended programmes warrant capital purchase with negotiated supplier buy-back arrangements.
  • Sheet pile reuse cycles and wastage. Reusable sheet piles degrade across multiple driving and extraction cycles; allowances must cover cutting off broomed heads and damaged toes, shortening usable pile lengths, and scrap disposal.
  • Geotechnical driving resistance and pre-treatment. Dense gravels, cobbles, boulders, or high SPT strata slow pile penetration, necessitating costly pre-drilling, high-pressure water jetting, or impact hammer assistance to reach design toe level.
  • Specialist marine plant and crane spreads. In-stream and marine cofferdams require substantial floating plant, including spud barges, crane barges, tugboats, and work boats, alongside heavy crawler cranes and vibratory hammers.
  • Underwater excavation and tremie plug placement. Wet excavation beneath water level via crane-hung clamshell buckets or suction dredges is significantly slower and more costly than dry earthmoving; tremie concrete plugs represent sacrificial materials.
  • Continuous 24/7 dewatering and water treatment. Managing clutch seepage and rainfall ingress demands round-the-clock pumping with dual synchronised diesel backup generators, paired with on-site clarifiers, settlement tanks, and automated pH neutralisation skids.
  • Engineering design, certification, and proof engineering. Safety-critical cofferdams mandate budget lines for geotechnical modeling, Category 3 independent design verification, RPEQ or CPEng structural sign-off, and continuous survey telemetry.
  • Controlled flooding, strut removal, and pile extraction. Decommissioning requires controlled water head equalisation via sluices before dismantling framing, heavy vibratory pile extractors, diver cutting of subsea sheets, and riverbed reinstatement.
  • Wet weather, river flow windows, and flood allowances. Works must align with dry-season river flow windows; estimators must price standby allowances, floating plant storm demobilisation, and emergency flood relief sluice gate installation.

Risks and common failures

  • Sheet pile declutching. Driving against cobbles, boulders, or shallow rock tears interlocks, admitting pressurized water and ground fines into the pit. Control: Pitch piles in panels using rigid two-tier guide templates, monitor verticality during driving, enforce refusal criteria, and deploy commercial divers to inspect clutches prior to dewatering.
  • Basal hydraulic boiling and piping. Upward seepage hydraulic gradients in permeable ground exceed the buoyant weight of soil at excavation level, triggering quicksand conditions and sudden floor blowout. Control: Drive sheet piles deep into an underlying aquitard, install relief wells to depressurise confined aquifers, or cast an engineered tremie concrete plug.
  • Waler and strut structural buckling. Overloading from lateral earth or water pressures, thermal expansion of long steel struts, or excavator bucket strikes triggers framing buckling. Control: Perform buckling and second-order structural analysis to AS 4100, install web stiffeners and knee braces, and enforce plant clearance buffers.
  • Catastrophic overtopping and wall collapse. River floods, tidal surges, or storm swells exceeding wall crest level cause uncontrolled inrush and wall destruction. Control: Design crest levels with adequate hydrologic freeboard and incorporate flood relief sluice gates to balance internal and external water heads during major flood events.
  • Buoyant uplift of tremie plug or substructure. Hydrostatic uplift pressure exceeds the combined self-weight of the tremie concrete plug and substructure, lifting the floor. Control: Carry out limit-state uplift calculations to AS 5100.3, install tension rock anchors, and weld shear studs onto sheet pile pans to transfer uplift resistance into the walls.
  • Excessive interlock seepage and inrush. Torn interlocks, defective clutches, or missing sealant permit heavy water inflow that overpowers site pumping plant. Control: Pre-apply hydrophilic expanding sealants or polyurethane grouts into interlocks prior to pitching, and keep emergency external ash or cinder sealing mixtures and grouting rigs on standby.
  • Settlement of adjoining infrastructure. Lowering groundwater tables consolidates compressible soils beneath nearby rail lines, bridge abutments, or roadways. Control: Construct impermeable cut-off walls keyed into impermeable bedrock, install external recharge wells, and maintain continuous automated optical survey monitoring.
  • Personnel drowning and emergency entrapment. Rapid wall breach, sudden overtopping, or dewatering pump power failure traps personnel working in deep excavations. Control: Classify works as High-Risk Construction Work (HRCW), mandate dual synchronised backup generators, install automated high-level water alarms, and maintain clear scaffold stair towers with rescue davits.

Sources and review

SourceUsed forStatus
AS 5100.3:2017 (Bridge design, Part 3: Foundation and soil-supporting structures), Standards Australia (store.standards.org.au)Bridge foundation and cofferdam limit-state loads.Confirmed
AS 2159:2009 (Piling—Design and installation), Standards Australia (store.standards.org.au)Steel sheet pile driving and durability factors.Confirmed
AS 4678:2002 (Earth-retaining structures), Standards Australia (store.standards.org.au)Retaining structure lateral pressures and stability.Confirmed
AS 4100:2020 (Steel structures), Standards Australia (store.standards.org.au)Steel waler, strut, and bracket design.Confirmed
AS 3600:2018 (Concrete structures), Standards Australia (store.standards.org.au)Underwater mass concrete tremie plug design.Confirmed
AS/NZS 3012:2019 (Electrical installations—Construction and demolition sites), Standards Australia (store.standards.org.au)Site switchboard and pump electrical rules.Confirmed
AS 2865:2009 (Confined spaces), Standards Australia (store.standards.org.au)Confined space air testing and rescue.Confirmed
Model Code of Practice: Excavation work, Safe Work Australia (safeworkaustralia.gov.au)Shoring and trench safety over 1.5 m deep.Confirmed
Model Code of Practice: Managing electrical risks in the workplace, Safe Work Australia (safeworkaustralia.gov.au)Electrical controls for wet pumps.Not verified
CIRIA SP95: The design and construction of sheet-piled cofferdams, CIRIA (ciria.org)Sheet-pile cofferdam design rules.Not verified
CIRIA C760: Guidance on embedded retaining wall design, CIRIA (ciria.org)Embedded retaining wall guidance.Confirmed
CIRIA C517: Temporary propping of deep excavations, CIRIA (ciria.org)Excavation prop and waler design.Confirmed
CIRIA C750: Groundwater control: design and practice (2nd Ed.), CIRIA (ciria.org)Groundwater control and dewatering.Not verified
BS 5975-1:2024 and BS 5975-2:2024: Code of practice for temporary works procedures, BSI (knowledge.bsigroup.com)Temporary works TWC procedures.Confirmed (edition corrected)
Transport for NSW TS 01723: Earthworks for Bridgeworks (ATS-5110-25 MOD), Transport for NSW (standards.transport.nsw.gov.au)NSW bridge earthworks and cofferdams.Confirmed
MRTS03 & MRTS70, QLD Department of Transport and Main Roads (tmr.qld.gov.au)QLD excavation, cofferdams, and tremie.Confirmed
Managing Urban Stormwater: Soils and Construction (Blue Book), Landcom / NSW Govt (environment.nsw.gov.au)Sediment control and discharge rules.Not verified
Temporary Works — Index (TMP-INDEX-001), Vaultix (vaultix.com.au)Vaultix temporary works taxonomy index.Not verified

Items marked Not verified are not yet checked against a primary source. Research notes.