Traffic management and road furniture

Set out the temporary stage, verify devices before each switch, then deliver permanent barriers, signs and markings in the accepted road geometry.

Traffic management and road furniture
  1. Protection vehicleInclude the setup, moves and standby for the active front.
  2. Traffic taperCheck the implemented layout against the approved staging plan.
  3. Safety barrierInspect the completed run and terminal before opening the lane.
Illustrative workfront within Traffic management and road furniture.

Construction and release sequence

  1. Approve staging, device locations and lane-closure windows
  2. Establish the temporary work zone and verify access
  3. Install permanent barriers, signs, markings and terminals
  4. Inspect alignment and release each stage to the road operator

Work packages and conformance checks

Production and measurement

Track device hire by occupied shift and installation by run or asset.

View the discipline reference figureTraffic management and road furniture reference production bands from the Vaultix source register

Vaultix planning references retain their original output units. Confirm operating hours, crew, ground or access conditions and scope before adopting a figure. Time per unit and output per shift require different calculations.

ReferenceActivitySource unitLowTypicalHighSource key
PRD.TM.001TMP / TGS design & approval (standard low-complexity)days/scheme0.512S-061
PRD.TM.002TMP / TGS design & approval (complex, RoadManager/TMR submission)days/scheme135S-061
PRD.TM.010Water-filled barrier - supply, place & removem/day place & fill150300450S-061
PRD.TM.011Cones / bollards / temporary signs - daily setup & pack-downset/take per shift; ~- hr each0.50.51S-061
PRD.TM.017Lane / road closure - setup & removal (per closure event)closures set/removed per day122S-061