Plant / pavement recycling

Soil stabiliser and cold recycler

A self-propelled rotor mixes the existing material through the designed treatment depth. Pair the recycler with binder distribution, water supply, trim and compaction plant.

Soil stabiliser and cold recycler
  1. Mixing drumDepth, width and passes determine treated volume.
  2. Wheel trainTravel speed depends on material and the specified treatment.
  3. Drum enclosureControl the mixing zone and reconcile accepted treatment area.
Illustrative Vaultix machine configuration. Consult the selected model’s data for dimensions and capacities.

Machine selection

The Wirtgen WR 240i benchmark has a 2,400 mm working width, a published 0–510 mm working-depth range and 455 kW maximum engine power. Confirm configured machine, treatment design and effective overlap with the contractor. Wirtgen WR series comparison table

Check access width, turning space, layer thickness, binder type, moisture conditioning and the permitted working window. Obtain the quoted hire, haul, fuel and operator basis separately.

Treatment coverage

Effective width × forward speed × 60 ÷ passes gives square metres per productive hour. Use effective width after overlap and productive hours after delays. Treat trials, turning, replenishment and curing consistently.

Enter observed inputs to estimate treatment coverage.

Survey and acceptance

Record the treatment width, run overlap, verified depth, finished levels and treated polygon by chainage. Reconcile spread and mixing logs, density and specified strength evidence before releasing the next pavement layer.

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.