Release equipment foundations and pipe-rack interfaces. Set packages, assemble stations and tanks, then turn over by commissioned system.

Oil and process facilities
  1. Hydraulic gantrySetup and controlled transfer contribute to placement time.
  2. Process skidKeep equipment and assembly records against the skid ID.
  3. FoundationVerify plinth and anchor alignment before final installation.
Illustrative workfront within Oil and process facilities.
Open the Process equipment skid placement and alignment calculator

Construction and release sequence

  1. Release civil foundations, tie-in limits and vendor deliveries
  2. Set structural steel, process skids, piping and tanks
  3. Inspect connections and close mechanical completion by system
  4. Reconcile pre-commissioning tests and authorised turnover

Work packages and conformance checks

Production and measurement

Separate civil quantities, mechanical setting, pipe fabrication, tie-ins and testing attendance.

View the discipline reference figureOil and process facilities reference production bands from the Vaultix source register

Vaultix planning references retain their original output units. Confirm operating hours, crew, ground or access conditions and scope before adopting a figure. Time per unit and output per shift require different calculations.

ReferenceActivitySource unitLowTypicalHighSource key
PRD.OG.007Offshore S-lay - single-joint welding, 12" line, idealkm/day235S-065
PRD.OG.008Offshore S-lay - joints welded (12 m joints)joints/day150300420S-065
PRD.OG.009J-lay - deepwater single-position weldingkm/day123.5S-065
PRD.OG.010Reel-lay - smaller-diameter, no offshore weldingkm/day4815S-065
PRD.OG.011Process piping erection & weld (field, CS, by inch-dia)inch-dia/welder-day202735S-065
PRD.OG.012Mechanical equipment setting & alignment (skid / package)package/crew-day0.30.71.5S-065
PRD.OG.013RC equipment foundation (form / reo / pour plinth)m3/crew-day4814S-065
PRD.OG.014Structural steel erection (process plant, field) - inputman-hour/tonne152540S-065
PRD.OG.015Structural steel erection - outputt/crew-day41020S-065
PRD.OG.016Process piping - field weldinch-dia/welder-day202735S-065
PRD.OG.017Piping fabrication & install (overall)man-hour/inch-dia11.83.5S-065
PRD.OG.018Tank shell plate welding (vertical/horizontal seams, CS)man-hour/tonne4080140S-065
PRD.OG.019Tank erection - overall (small-mid API 650, by capacity)man-hour/tonne steel5090160S-065
PRD.OG.020Shell course erection (jack-up method)course/day0.512S-065
PRD.OG.021Subsea spool / jumper tie-in (per connection)connection/vessel-day0.512S-065
PRD.OG.022Umbilical / flowline laykm/day2510S-065
PRD.OG.023Rock-dump seabed stabilisationt/day2000600015000S-065
PRD.OG.024Hook-up spool tie-in (offshore HUC)tie-in/crew-day0.51.53S-065
PRD.OG.025Module integration (yard, per integrated module)module/weeks138S-065
PRD.OG.026Commissioning systems handoversystem/week2510S-065
PRD.OG.029PE gathering flowline lay & fusem/day3007001200S-065
PRD.OG.030Cleaning / gauging pig runkm/day52050S-065
PRD.OG.031Hydrostatic test - fill / pressurise / hold / report (per section)section/days137S-065
PRD.OG.032Drying to dewpoint (nitrogen / air)km/day21030S-065