Work scope and interfaces
What it is & where used
External works are the civil/structural elements that sit OUTSIDE the building envelope but inside the building contract — hardstand, kerbs, ramps, retaining walls, site tanks/pits, site stormwater and landscaping — followed by the whole-of-building commissioning and handover that closes the contract out.
Related work packages
Construction sequence
- bulk earthworks & retained-cut handover (Geotech)
- retaining walls AS 4678
- site stormwater pipes/pits/headwalls AS/NZS 3500.3
- below-ground tanks/pits AS 3735
- subgrade prep & subsoil drainage
- external pavements/hardstand AS 3727.1
- kerb, channel, footpaths & accessible ramps AS 1428.1
- topsoil, landscaping, turf & irrigation AS 4419
- pre-commissioning checks
- witness/functional testing
- statutory certificates (NCC OC)
- O&M manuals + as-builts/WAE
- training
- PRACTICAL COMPLETION / handover
- defects-liability period
- final completion
Make-or-break: handover is gated by the paperwork — certificates, O&M manuals and as-builts — so the commissioning lump sum and the defects tail must be priced as real work, not a token allowance.
Plant, resources and measurement
• Resource tags: L.CREW.CIVIL, L.CREW.DRAINAGE, L.CREW.CONC, L.CREW.FORMWORK, G.PLANT.EXC.20T, M.CONC.N32, M.PIPE.RCP.DN300, M.PIPE.PVC, M.TANK.WP, M.LANDSCAPE, M.SUBSOIL.DRAIN, M.REO.MESH.
• Priced items:
• BS.08.010 External concrete pavements, hardstand & aprons to AS 3727.1 / AS 3600 — m2
• BS.08.020 Kerb, channel, footpaths & accessible ramps to AS 1428.1 / MRTS70 — m
• BS.08.030 Reinforced concrete / masonry retaining walls to AS 3700 / AS 4678 — m2
• BS.08.040 Below-ground concrete tanks / pits / pump stations to AS 3735 — no
• BS.08.050 Site stormwater drainage — pipes, pits & headwalls to AS/NZS 3500.3 — m
• BS.08.060 Landscaping, turf, planting & irrigation — m2
• BS.08.070 Building commissioning, testing & handover — witness test, O&M, as-builts, defects — LS
• Measurement basis: pavements/landscaping by surface area (m2) on falls; kerb/footpath/ramp and drainage by run length (m); tanks/pits per unit (no); retaining walls by face area (m2); commissioning as a lump sum (LS).
• Rate trap: the BS.08.070 lump sum must carry witness testing, O&M compilation, as-built/WAE drafting, training and the defects-liability tail — under-allowing it strands practical completion. Externally, confirm pavement/drainage is not already in the civil scope (don't double-count BS.08.010/BS.08.050 against Unbound Granular Pavement), and that ramp grades meet AS 1428.1 before pricing.
Shared hoists, crane time, access and floor-cycle releases affect several trades together.
View Buildings and electrical services productivity referencesPackage productivity
Select a component that matches the method, spread and ground conditions. Programme the remaining activities and hold points separately.
| Component activity | Published basis | Low | Typical | High | Library source |
|---|---|---|---|---|---|
| Energise + functional & illuminance commission a lighting circuit/run (AS/NZS 1158)PRD.EL.015 | days/circuit | 1 | 2 | 4 | S-252 |
Survey conformance and lot release
- Observe
- Check accessible paths, entry thresholds, external falls and drainage tie-ins.
- Compare
- Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
- Verify and hand over
- Reconcile as-builts, defect closeout and system handover by zone.
- Resolve exceptions
- Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.
Inspection considerations
• AS 1428.1 ramp/landing compliance is an occupancy hard-stop — survey-set out and as-built grades before pour; a non-compliant ramp fails the occupancy certificate.
• Liquid-retaining structures (AS 3735) require crack-width control and a hold-point hydrostatic/leak test before backfill.
• Site stormwater requires CCTV/visual proof of grade and a connection-to-discharge sign-off (AS/NZS 3500.3).
• Retaining walls (AS 4678) need verified drainage and surcharge assumptions from Geotech — do not price design here.
• Commissioning risk: missing or late O&M manuals, as-builts and statutory certificates delay practical completion regardless of physical progress; the defects-liability period is a funded obligation, not a free tail. Services commissioning is coordinated via Building Services (MEP).
• Interface risk: scope-gap or double-count at the building/civil boundary — agree the demarcation for pavement, drainage and earthworks before tendering.
Evidence and related work
Internal record BS-EXTERNAL-COMMISSION-001 · review · 2026-06-21. Use the issued project acceptance documents for contractual limits, inspection frequency and release authority.