Buildings and electrical services

Traffic Signals & ITS

Check signal poles, device locations, duct crossings and detection zones against the approved layout.

Lighting, signals and roadside electrical infrastructure
  1. Pole and mastCheck support geometry and installation records.
  2. Cable pitTrack conduits, connections and as-built location.
  3. Access platformAllow for traffic staging and the workable access window.
Construction context for Traffic Signals & ITS

Work scope and interfaces

What it is & where used

Used at signalised intersections, on motorways (ITS/managed-motorway), and at any monitored/controlled roadside location. Each ITS device = cabinet + device + power tail + comms tail.

Related work packages

Construction sequence

  1. Conduit + pits + footings (civil first)
  2. Erect posts/mast-arms + footings
  3. Install lanterns + detection (loops cut into pavement / cameras)
  4. Install controller / ITS cabinet
  5. Pull power + comms cables
  6. Terminate & configure
  7. FUNCTIONAL COMMISSIONING (phasing, detection, fail-safe)
  8. CONNECT to the authority's traffic-control / ITS system
  9. Handover. ITS device: cabinet
  10. Device (CCTV/VMS/sensor)
  11. Power + comms
  12. Configure
  13. Integrate & prove end-to-end (Communications, Fibre & SCADA).

The make-or-break: functional commissioning + authority connection (the signal/ITS isn't done until it works in the authority's system — the schedule risk), and detection accuracy (loops/cameras).

Plant, resources and measurement

L.CREW.CABLE (install + terminate) + civil for footings/conduit/pits; materials M.SIGNAL.POST/.MASTARM/ .LANTERN/controller, M.ITS.CABINET/M.ITS.CCTV/M.ITS.VMS/sensors. Measured: signals per intersection (LS) or per element (no), ITS devices per no (cabinet+device+tails), commissioning + authority connection LS. Priced items: EL.04.* (signals — post/mast-arm/lantern/controller/detection), EL.05.* (ITS — cabinet/ CCTV/VMS/sensors). VMS/sign-gantry & signal-install are documented big-tickets.

Shared hoists, crane time, access and floor-cycle releases affect several trades together.

View Buildings and electrical services productivity references

Package productivity

Select a component that matches the method, spread and ground conditions. Programme the remaining activities and hold points separately.

Component activityPublished basisLowTypicalHighLibrary source
Traffic-signal post / pole / mast-arm + footing (per post)PRD.EL.007no/day per crew246S-252
Set & wire signal controller cabinet + cutover/commission intersectionPRD.EL.010days/intersection123S-252

Component duration

Survey conformance and lot release

Observe
Check signal poles, device locations, duct crossings and detection zones against the approved layout.
Compare
Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
Verify and hand over
Link asset IDs and controller acceptance records to the authorised traffic switch.
Resolve exceptions
Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.
Inspection considerations

Conduit/pit & footing set-out, cable test, controller configuration & phasing, detection calibration, functional commissioning (fail-safe, conflict monitor), authority connection/acceptance, ITS end-to-end proving. Risks: authority connection/commissioning lead time (the dominant schedule risk), detection accuracy, controller/ITS-device lead time, comms dependency (Communications, Fibre & SCADA), traffic staging for loop cutting/pole erection. Pairs with the road-furniture side (Traffic discipline) and comms (Communications, Fibre & SCADA).

Evidence and related work

Internal record EL-SIGNALS-ITS-001 · review · 2026-06-21. Use the issued project acceptance documents for contractual limits, inspection frequency and release authority.

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.