Reclamation settlement and platform release

Hydrographic survey launch over the berth survey area.
  1. Positioning mastRecord the positioning and datum checks used for the survey.
  2. Survey launchLine speed, turns and access determine field time.
  3. Survey transducerVerify sensor offsets and corrections before accepting the reduced soundings.
Lot measurement
released fill stages
Method reference
MAR-DREDGE-001
Construction routes
1

Work sequence and plant spread

Establish baseline readings, track staged filling and movements, then release the platform to the next trade under the approved geotechnical criteria.

Plant and crew

Settlement plates, monitoring instruments, survey crew and geotechnical reviewer. Allow separate occupation time for surcharge and monitoring.

Quantity and productivity

Count stages signed off. Estimate instrument reading and review effort separately from elapsed settlement time.

Use the vessel or subcontractor programme, a trial or a comparable shift record. Retain accepted quantity, operating time, waiting time and spread composition with the adopted rate.

Survey checks and lot handover

Survey conformance

Reference instrument heads to external control; check settlement trends and crest or platform profile against the issued design stage.

Release record and receiver

Geotechnical reviewer issues the stage disposition, movement history and released platform limits.

Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.