Plant and crew
Cutter suction dredger, discharge pipeline, booster if specified, workboat and reclamation cell crew. Match pump duty and receiver capacity to the cut.
Marine works / Dredging
Release the cut and receiving cell together. Dredge and pump concurrently, move the discharge point as required and record stoppages and material zones.
Cutter suction dredger, discharge pipeline, booster if specified, workboat and reclamation cell crew. Match pump duty and receiver capacity to the cut.
Use the lower bank-equivalent output of excavation, pumping and reception. Record placed fill separately by survey. The placement comparator uses a different quantity basis.
| Record | Activity | Source unit | Low | Typical | High | Source key |
|---|---|---|---|---|---|---|
| PRD.MAR.013 | CSD in soft-medium material (in-situ m3) | m3/week | 30000 | 80000 | 200000 | S-065 |
| PRD.MAR.017 | Hydraulic fill placement (pumped from CSD) | m3/week | 30000 | 90000 | 250000 | S-065 |
Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.
Compare pre- and post-dredge bed surfaces and track fill levels within the receiving cell. Document the conversion basis for any material balance.
Dredge lead hands over cut-cell records. Reclamation lead hands over placed-fill surveys, discharge logs and environmental records for independent review.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Reclamation bund and receiving cell · Marine spread mobilisation and positioning
Feeds · Dredge acceptance and high-spot closeout · Reclamation settlement and platform release
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.