Discipline library

Tunnels and underground works

Establish portal or shaft control, release excavation reaches with support, verify permanent lining and clearance, then install and commission fit-out.

Tunnels and underground works
  1. CutterheadGround conditions and interventions affect the boring cycle.
  2. ShieldSeparate excavation time from stoppages and maintenance.
  3. Segment ringSurvey the ring and reconcile accepted advance.
Illustrative workfront within Tunnels and underground works.
Open the Segmentally lined EPB tunnel drive calculator

Construction and release sequence

  1. Release portal, shafts, control and monitoring baseline
  2. Advance the selected excavation and support spread by reach
  3. Verify lining geometry and release services access
  4. Reconcile chainage, instrumentation and system records

Work packages and conformance checks

Production and measurement

Split drive advance, ring or support time, shaft logistics, interventions and fit-out by reach.

View the discipline reference figureTunnels and underground works reference production bands from the Vaultix source register

Vaultix planning references retain their original output units. Confirm operating hours, crew, ground or access conditions and scope before adopting a figure. Time per unit and output per shift require different calculations.

ReferenceActivitySource unitLowTypicalHighSource key
PRD.TU.001EPB/slurry advance, urban soft ground, single shieldm/day81218S-065
PRD.TU.002Favourable homogeneous ground, optimised logisticsm/day182840S-065
PRD.TU.003Ring build (erect + bolt + gasket + grout)min/ring254070S-065
PRD.TU.004Hard-rock TBM advance, good competent rockm/day152540S-065
PRD.TU.005Advance in poor/faulted rock (heavy support)m/day2612S-065
PRD.TU.006Disc-cutter consumptioncutters/m0.050.150.4S-065
PRD.TU.008Diaphragm-wall panel excavation (grab/hydromill)m2/day3060120S-065
PRD.TU.009Secant pile install (CFA/cased)no/day4814S-065
PRD.TU.010Shaft excavation muck-out (soft ground, crane+grab)m/day depth0.51.53S-065
PRD.TU.011Ring erection cycle (erect+bolt+gasket)min/ring203560S-065
PRD.TU.012Annulus grout volumem3/ring0.51.23S-065
PRD.TU.013Casting-yard segment productionrings/day4814S-065
PRD.TU.014SCL top-heading advance, fair rock, roadheaderm/day248S-065
PRD.TU.015Wet-mix sprayed concrete applicationm3/hr61220S-065
PRD.TU.016Sprayed-concrete rebound/overbreak allowance%51225S-065
PRD.TU.017Rock-bolt installationno/shift204070S-065
PRD.TU.018Ground-freeze formation (brine)weeks/passage3612S-065
PRD.TU.019Cross-passage mining & support (SCL)m/day0.51.53S-065
PRD.TU.020Cross-passage complete (treat+break+mine+line)weeks/passage61224S-065
PRD.TU.021Cut-and-cover box RC (place & finish)m3/day2050100S-065
PRD.TU.022Soldier-pile / contiguous wall installm2/day255090S-065
PRD.TU.023Portal cutting bulk excavationm3/day40010002500S-065
PRD.TU.024Pre-excavation grouting drill & injectm/day drilled3080150S-065
PRD.TU.025Grout take (permeation, granular ground)L/m hole20100400S-065
PRD.TU.026Forepole / canopy-tube installationm/day4090160S-065
PRD.TU.027Jet-grout column productionm/day3070130S-065
PRD.TU.028Bulking factor (in-situ to loose spoil)ratio1.21.41.8S-065
PRD.TU.029Slurry separation-plant throughputm3/hr2006001500S-065
PRD.TU.030Continuous tunnel conveyor capacityt/hr40010002500S-065
PRD.TU.031Sheet membrane installation (incl. fleece & fixing)m2/day150300600S-065
PRD.TU.032Secondary in-situ lining (travelling shutter pour)m/day4815S-065
PRD.TU.033Spray-applied membranem2/day100250450S-065
PRD.TU.034Construction vent duct extension (flexible)m/day100250500S-065
PRD.TU.035Minimum face air quantity (diesel dilution)m3/s per kW diesel0.040.060.08S-065
PRD.TU.036Permanent jet-fan installno/day136S-065
PRD.TU.037Cable installation (pull & terminate)m/day per crew2005001000S-065
PRD.TU.038Cable tray / walkway support installm/day3060120S-065
PRD.TU.039Integrated testing & commissioning durationweeks/tunnel82052S-065
PRD.TU.040Surface settlement-array installationpoints/day102550S-065
PRD.TU.041Inclinometer / extensometer install (drilled)no/day136S-065
PRD.TU.042Volume loss target (urban EPB)%0.512S-065