Plant and crew
Workboat or access platform, coating and cathodic-protection specialists, inspection instruments and tagged anodes.
Marine works / Wharf construction
Inspect coating repairs and designed jacket or anode installation, identify test locations and complete specialist verification before the interface becomes inaccessible.
Workboat or access platform, coating and cathodic-protection specialists, inspection instruments and tagged anodes.
Count anodes, measure coating by area and jackets by pile. If the lot combines systems, carry separate allowances for the other quantities.
| Record | Activity | Source unit | Low | Typical | High | Source key |
|---|---|---|---|---|---|---|
| PRD.MAR.042 | Abrasive blast + coat marine steel (multi-coat system) | m2/day per crew | 60 | 150 | 300 | S-065 |
| PRD.MAR.043 | Install HDPE/concrete pile jacket + grout (splash zone) | no/day | 2 | 5 | 10 | S-065 |
| PRD.MAR.044 | Install sacrificial anodes (bolt-on/stand-off) | no/day | 6 | 15 | 30 | S-065 |
Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.
Locate installed anodes, test points and jacket bounds by pile or wall panel. Pair the asset map with continuity, coating and commissioning records.
Corrosion specialist issues the protected-asset schedule, inspected connections and initial readings to the maintenance team.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Pile cut-off, plugs and cap release
Feeds · Berth or reach handover
Open this row in the lot worksheetIncoming release · Pile cut-off, plugs and cap release
Feeds · Berth or reach handover
Open this row in the lot worksheetIncoming release · Quay wall piles and interlock closure
Feeds · Berth or reach handover
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.