Marine works / Quay wall

Quay wall piles and interlock closure

Quay wall beside the berth pocket, with landward restraint and retained fill.
  1. Quay wall and walerCheck wall alignment and restraint connections before the next excavation stage.
  2. Landward anchorageRecord the accepted anchor system and the stage it releases.
  3. Berth pocketSurvey the pocket against the approved deepening stage and surface.
Lot measurement
m² installed wall
Method reference
DISC-MARINE-METH-003
Construction routes
1

Work sequence and plant spread

Pitch and install the designed wall elements to the required founding and interlock arrangement. Monitor line throughout the panel and record obstructions.

Plant and crew

Crane barge or jack-up, pile gate, driving equipment and survey. Identify combi-wall king-pile and intermediate sheet sequences.

Quantity and productivity

Measure wall face area on the agreed depth basis. Count king piles or special closures separately where the schedule requires it.

RecordActivitySource unitLowTypicalHighSource key
PRD.MAR.004Pitch & vibrate steel sheet pile (combi/anchored wall)m2/shift4080140S-065

Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.

Survey checks and lot handover

Survey conformance

Survey wall line, head elevation and inclination. Tie pile length and installation records to embedment evidence and interlock inspection.

Release record and receiver

Wall engineer releases the accepted panel to walers and anchors, with a drawing of unresolved deviations.

Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.

Where this lot fits

Source records