Roads / Enabling works

Survey, staging and traffic switches

Estimate in released workfronts.

Roads and pavements
  1. Material transferContinuity of mix delivery determines how often the paver stops.
  2. ScreedMeasure paving width and thickness against the issued layer design.
  3. RollerThe compaction train must keep up with the paving front.
Construction context for Survey, staging and traffic switches

Construction method and plant

Split the corridor into chainage, carriageway and stage. Verify survey control, service information and traffic arrangements, then record the usable closure window.

Plant and crew

Survey party, traffic crew, protection vehicles and signs. Size the spread by concurrent closures and switch locations.

Measure and release the lot

Quantity take-off

Count workfront releases. Estimate traffic attendance by closure shift and survey by crew attendance separately.

Handover record

Issue the stage drawing, limits, access times and survey control to each trade. Traffic management continues until the stage switch or reopening.

Temporary devices, repeat switches and out-of-hours attendance can recur even where permanent quantities stay constant.

Where this package fits

Productivity references

Use a contractor programme, trial or shift record for this package. Record the quantity accepted, crew configuration, productive hours and delays.

DISC-TRAFFIC-METH-001 Temporary Traffic ManagementQueensland TMR specifications

Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.

Survey conformance and lot release

Observe
Re-observe control and mark traffic-stage limits against the approved closure drawing.
Compare
Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
Verify and hand over
Issue the stage drawing, limits, access times and survey control to each trade. Traffic management continues until the stage switch or reopening.
Resolve exceptions
Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.
The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.