Plant and crew
Dozer or excavator, haul units and environmental crew. Check stockpile reach and material segregation.
Estimate in m³ in situ.
Set out the approved footprint and install the applicable erosion controls. Strip by measured depth and haul reusable topsoil to the nominated stockpile.
Dozer or excavator, haul units and environmental crew. Check stockpile reach and material segregation.
Multiply surveyed footprint by stripping depth by zone. Track stockpiled, exported and reinstated volumes separately.
Release exposed formation limits and surveyed stockpile quantities to earthworks and drainage crews.
Long leads, vegetation boundaries and double handling reduce output. Confirm the volume basis of the reference band.
Incoming release · Survey, staging and traffic switches
Feeds · Bulk cut and haul · Cross drainage and culvert installation
Incoming release · Survey, staging and traffic switches
Feeds · Bulk cut and haul · Cross drainage and culvert installation
Incoming release · Survey, staging and traffic switches
Feeds · Bulk cut and haul · Cross drainage and culvert installation
| Reference activity | Source unit | Low | Typical | High | Source |
|---|---|---|---|---|---|
| PRD.EW.001 Strip & stockpile topsoil | m3/hr | 120 | 200 | 320 | S-061 |
Indicative bands. Match the activity, volume basis, lift or depth and time denominator to the lot. For a daily band, establish the original shift basis before converting to productive hours.
Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.