Service verification and protection

Estimate in service conflicts released.

Underground utilities and cable duct installation
  1. Existing servicesVerify exposed service positions before working close to them.
  2. Duct bankRecord alignment, spacing and installed length by section.
  3. Access pitSurvey connection levels and include the as-built arrangement in handover.
Construction context for Service verification and protection

Construction method and plant

Register crossings, confirm known locations and levels, coordinate the approved protection or relocation, then update the survey model.

Plant and crew

Survey, locator, vacuum excavation subcontractor and network representatives. Match plant to access and service-owner conditions.

Measure and release the lot

Quantity take-off

Count conflicts by service type and treatment. Price potholes, relocation lengths and attendance as separate measured resources.

Handover record

Provide the released service plan and unresolved exclusion zones to drainage and earthworks crews.

Owner attendance and staged outages can constrain the workfront independently of excavation quantity.

Where this package fits

Productivity references

Use a contractor programme, trial or shift record for this package. Record the quantity accepted, crew configuration, productive hours and delays.

Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.

Survey conformance and lot release

Observe
Record exposed service position, level and verified clearance before concealment.
Compare
Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
Verify and hand over
Provide the released service plan and unresolved exclusion zones to drainage and earthworks crews.
Resolve exceptions
Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.
The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.