Plant and crew
Trencher or compact excavator, aggregate delivery, geotextile and pipe crew. Confirm outlet access.
Estimate in m of drain.
Locate outlets, cut the trench, install the specified drainage assembly and tie into the outlet. Survey and inspect before cover.
Trencher or compact excavator, aggregate delivery, geotextile and pipe crew. Confirm outlet access.
Measure installed drain length. Take filter aggregate by trench section and outlets by count.
Release the covered drainage line with outlet location and photographs to the formation crew.
Short runs, service crossings and inaccessible outlets can dominate the metres installed per shift.
Incoming release · Embankment placement and compaction
Feeds · Subgrade trim and proof roll
Use a contractor programme, trial or shift record for this package. Record the quantity accepted, crew configuration, productive hours and delays.
Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.
Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.