Gas pipelines

Cross-country pipeline lowering and placement

Gas pipelines and crossings
  1. SideboomPlan the lowering spread against available access and lifting points.
  2. Pipe stringTie welding and coating records to the installed section.
  3. Trench beddingInspect support and alignment before backfill conceals the pipe.
Illustrative workfront for Cross-country pipeline lowering and placement.

Tracked sideboom pipelayer

Compare conventional open-trench lowering with trenchless crossings at constrained locations. Split the estimate by string length, terrain, crossing method and access.

Supplier information to obtain

Request pipe diameter, wall thickness, string geometry, lifting study, equipment configuration, trench release and inspection arrangements.

Supporting plant and crew

Matched sideboom spread, pipe handling gear, padding equipment, survey crew and coating inspection. Align trench, welding and reinstatement crews across separate fronts.

Caterpillar identifies the PL87 as a dedicated pipelayer. Caterpillar PL87 pipelayer

Construction method

Release the workfront

Release the trench and accepted welded string. Confirm inspection and delivery clearances before allocating the spread.

Execute the work

Position the spread, lower the accepted string, inspect placement and release for padding. Separate moves around crossings and short tie-ins.

Measure and hand over

Record metres lowered. Welding, testing, backfill and reinstatement are separate activities in the complete mainline programme.

Productivity calculator

Enter the released string length and the occupation time of the whole spread. Adding pipelayers changes the lift arrangement and does not multiply the string output.

Example values demonstrate the arithmetic. Use shift records, supplier programmes or a measured trial for an estimate.

Calculation basis and shift treatment

One spread completes all three stages in sequence. Repeat interval = sum of the three stage times. Productive minutes per shift = rostered hours × 60 − lost minutes. Repeat output = batch quantity × productive minutes ÷ repeat interval. Package minutes = first batch time + (number of batches − 1) × repeat interval. Shift equivalents = package minutes ÷ productive minutes per shift.

Rounded rostered shifts assume work can carry across shift boundaries. Continuous weather windows, indivisible lifts, startup, mobilisation, handovers and shutdowns need separate programme allowances. Count losses once across observed stage times and shift losses.

Productivity evidence

Mainline lay (string->weld->lower->backfill), open terrain, DN300-600

Low 300 · Typical 600 · High 1200   m/day

The mainline benchmark covers stringing through backfill. The calculator measures the lowering spread alone.

PRD.OG.001 · Vaultix source S-065 · Indicative internal benchmark

Related methodologies

The equipment citation supports the machine function. The method and timing boundaries are estimating assumptions. Record the project source, date, observed quantity, time basis and loss treatment when adopting a rate.

Discipline work packages and survey requirements

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.