Plant and crew
Lifting equipment, fitting and services crews, torque equipment and survey. Identify free-issued items and interface trades.
Marine works / Wharf construction
Verify the released deck or coping and embeds, set fittings, connect designated services and compile the asset schedule.
Lifting equipment, fitting and services crews, torque equipment and survey. Identify free-issued items and interface trades.
Count mooring fittings by type. Price services by run or connection, and tests by item. Add service quantities separately from the fitting count.
| Record | Activity | Source unit | Low | Typical | High | Source key |
|---|---|---|---|---|---|---|
| PRD.MAR.040 | Install bollard / QRH (set out, anchor, set, torque) | no/day | 1 | 3 | 6 | S-065 |
| PRD.MAR.041 | Install chemical/mechanical anchor set for fittings | no/day | 8 | 16 | 30 | S-065 |
Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.
Survey fitting centres, orientation, deck level and service penetrations. Check clearances and retain vendor inspection and required test results.
Wharf lead releases tagged assets, installation tests, service records and outstanding items to the operator.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Wharf topping, deck falls and curing
Feeds · Berth or reach handover
Open this row in the lot worksheetIncoming release · Wharf topping, deck falls and curing
Feeds · Berth or reach handover
Open this row in the lot worksheetIncoming release · Quay coping, retained fill and edge completion
Feeds · Berth or reach handover
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.