Plant and crew
Barge or deck crane, fitting crew, access platform and survey. Confirm panel and chain assemblies against vendor drawings.
Marine works / Wharf construction
Verify cast-ins or approved anchor positions, install the identified fender assembly, adjust to the berth face and complete vendor inspections.
Barge or deck crane, fitting crew, access platform and survey. Confirm panel and chain assemblies against vendor drawings.
Count complete sets. Track anchor works separately only when the whole-set scope excludes them; include tidal access and handling time.
| Record | Activity | Source unit | Low | Typical | High | Source key |
|---|---|---|---|---|---|---|
| PRD.MAR.039 | Install fender system (cone/cell + panel + chains), per set | set/day | 0.5 | 1.5 | 3 | S-065 |
| PRD.MAR.041 | Install chemical/mechanical anchor set for fittings | no/day | 8 | 16 | 30 | S-065 |
Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.
Check berth-face offset, fender centre elevation, orientation and panel projection on the marine datum. Record anchor and connection inspections.
Vendor or authorised inspector hands over each fender set, as-built coordinates and installation record to the berth operator.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Wharf topping, deck falls and curing
Feeds · Berth or reach handover
Open this row in the lot worksheetIncoming release · Wharf topping, deck falls and curing
Feeds · Berth or reach handover
Open this row in the lot worksheetIncoming release · Quay coping, retained fill and edge completion
Feeds · Berth or reach handover
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.