Plant and crew
Hydrographic vessel, ROV or approved diver inspection, processing crew and placing plant on call for correction.
Marine works / Scour protection
Compare as-placed footprint and profile with the released bed and design, investigate shadows at piles, remedy agreed deficiencies and close the cell.
Hydrographic vessel, ROV or approved diver inspection, processing crew and placing plant on call for correction.
Count accepted cells; price line coverage, targeted inspection, processing and corrective placement separately.
Use the vessel or subcontractor programme, a trial or a comparable shift record. Retain accepted quantity, operating time, waiting time and spread composition with the adopted rate.
Report toe, crest, thickness basis, coverage gaps and uncertainty. Do not infer buried filter continuity solely from a finished-surface survey.
Reviewer issues the accepted scour drawing and inspection map to wharf operations and the maintenance baseline.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Rock armour placement around piles and toes
Feeds · Precast wharf deck units · Berth or reach handover
Open this row in the lot worksheetIncoming release · Rock armour placement around piles and toes
Feeds · Berth or reach handover
Open this row in the lot worksheetIncoming release · Rock armour placement around piles and toes
Feeds · Berth or reach handover
Open this row in the lot worksheetIncoming release · Articulated or grout-filled scour mattresses
Feeds · Berth or reach handover
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.