Precast wharf deck units

Piled wharf bay, floating crane and exposed seabed armour. Illustrative workfront.
  1. Precast deckDeck units span between headstocks. Keep the open bay available for scour placement and inspection.
  2. Steel pilesThe accepted pile-head group releases the cap and scour crews.
  3. Crane pontoonVessel access and positioning determine which bay the lifting spread can serve.
Lot measurement
units erected
Method reference
MAR-WHARF-001
Construction routes
2

Work sequence and plant spread

Receive identified units, inspect bearing seats, erect to the nominated span and complete the specified restraints and connections.

Plant and crew

Marine or shore crane, transport barge, rigging crew and survey. Sequence units by lift radius, delivery slot and bearing availability.

Quantity and productivity

Count units by type and span. Measure receipt, rigging, lift, seating and release time. Charge crane relocation and delivery standby explicitly.

RecordActivitySource unitLowTypicalHighSource key
PRD.MAR.010Place precast deck planks / soffit unitsno/day82035S-065

Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.

Survey checks and lot handover

Survey conformance

Observe bearing engagement, plan alignment, soffit or top level and joint gaps by unit ID before topping conceals interfaces.

Release record and receiver

Erection lead releases the unit register and connection inspections to deck reinforcement and topping.

Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.

Where this lot fits

Source records

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.