Roads / Surfacing

Concrete joints, curing and traffic release

Estimate in panels released.

Concrete pavement construction
  1. Slipform paverFeed and positioning affect achievable lane output.
  2. Slab edgeSurvey line, level and tie-ins by paving lot.
  3. Joint and cure frontCoordinate joint work and curing release with the paving sequence.
Construction context for Concrete joints, curing and traffic release

Construction method and plant

Track cure, undertake specified joint operations, inspect joint geometry and compile strength evidence for the opening decision.

Plant and crew

Sawing and sealing equipment, curing crew, survey and testing team. Schedule return visits by pour lot.

Measure and release the lot

Quantity take-off

Count panels released. Measure joint cutting and sealing by joint length and treatment type.

Handover record

Issue the strength and joint release for each carriageway section before unrestricted loading or finishing work.

Elapsed curing time and crew hours are different inputs. Enter the governing release wait separately from installation effort.

Where this package fits

Productivity references

Use a contractor programme, trial or shift record for this package. Record the quantity accepted, crew configuration, productive hours and delays.

Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.

Survey conformance and lot release

Observe
Survey joint line, spacing and transitions and link each observed joint to its panel.
Compare
Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
Verify and hand over
Issue the strength and joint release for each carriageway section before unrestricted loading or finishing work.
Resolve exceptions
Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.