Roads / Handover

Lot reconciliation and reopening

Estimate in lots released.

Traffic management and road furniture
  1. Protection vehicleInclude the setup, moves and standby for the active front.
  2. Traffic taperCheck the implemented layout against the approved staging plan.
  3. Safety barrierInspect the completed run and terminal before opening the lane.
Construction context for Lot reconciliation and reopening

Construction method and plant

Reconcile finished levels and quantities, close lot records and defects, verify drainage, furniture and markings, then coordinate the authorised traffic switch.

Plant and crew

Survey, quality, traffic and superintendent representatives. Schedule inspections against the opening window.

Measure and release the lot

Quantity take-off

Count released lots by chainage and carriageway. Record outstanding defects and post-opening maintenance commitments separately.

Handover record

Hand over the accepted as-built plan, test register, asset inventory and traffic-switch record.

Practical completion and reopening can have different dates. Carry unresolved defects into the agreed close-out process.

Where this package fits

Productivity references

Use a contractor programme, trial or shift record for this package. Record the quantity accepted, crew configuration, productive hours and delays.

DISC-ROAD-OVW-001 Roads and Pavements OverviewQueensland TMR specifications

Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.

Survey conformance and lot release

Observe
Reconcile accepted as-built surfaces, asset locations and outstanding survey exceptions by lot.
Compare
Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
Verify and hand over
Hand over the accepted as-built plan, test register, asset inventory and traffic-switch record.
Resolve exceptions
Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.
The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.