Roads / Finishing

Line marking and raised pavement markers

Estimate in line-km.

Traffic management and road furniture
  1. Protection vehicleInclude the setup, moves and standby for the active front.
  2. Traffic taperCheck the implemented layout against the approved staging plan.
  3. Safety barrierInspect the completed run and terminal before opening the lane.
Construction context for Line marking and raised pavement markers

Construction method and plant

Confirm the accepted surface and marking layout, set out lines, apply specified material and complete symbols and markers.

Plant and crew

Line-marking truck, premark crew, hand applicators and traffic protection. Choose the plant against marking material and pattern.

Measure and release the lot

Quantity take-off

Measure line length by pattern, colour and width. Track route-km, painted line-km, symbols and marker counts separately.

Handover record

Issue layout and inspection records, plus readiness for the traffic switch.

Allow curing or opening time for the selected marking system. Existing markings may need removal on rehabilitation work.

Where this package fits

Productivity references

Reference activitySource unitLowTypicalHighSource
PRD.RF.020
Longitudinal line marking - waterborne paint (single pass)
km/line-km per day81215S-061
PRD.RF.021
Longitudinal line marking - thermoplastic (sprayed/extruded)
km/day (machine) / much slower hand-applied2610S-061
PRD.RF.022
Raised pavement markers (RRPMs) install
per day150350600S-061
PRD.RF.024
Pavement symbols / legends / arrows (applied)
per day (paint) / 10-30-60 (thermo)205090S-061

Indicative bands. Match the activity, volume basis, lift or depth and time denominator to the lot. For a daily band, establish the original shift basis before converting to productive hours.

Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.

Survey conformance and lot release

Observe
Check line offsets, tapers, symbols and raised markers against the final lane layout.
Compare
Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
Verify and hand over
Issue layout and inspection records, plus readiness for the traffic switch.
Resolve exceptions
Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.
The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.