Roads / Surfacing

Tack coat and asphalt interface

Estimate in m² of interface.

Roads and pavements
  1. Material transferContinuity of mix delivery determines how often the paver stops.
  2. ScreedMeasure paving width and thickness against the issued layer design.
  3. RollerThe compaction train must keep up with the paving front.
Construction context for Tack coat and asphalt interface

Construction method and plant

Inspect and clean the existing or intermediate surface, apply the approved tack and release the interface in the specified condition.

Plant and crew

Sprayer, sweeper and traffic crew. Match the application width to the paving run and plant access.

Measure and release the lot

Quantity take-off

Measure each treated interface separately. Distinguish residual binder and emulsion quantities when deriving litres.

Handover record

Release the interface directly to paving and protect it from traffic contamination.

Where the asphalt supply-and-lay item already includes tack, allocate the resource within that item once.

Where this package fits

Productivity references

Use a contractor programme, trial or shift record for this package. Record the quantity accepted, crew configuration, productive hours and delays.

DISC-ROAD-METH-001 Asphalt SurfacingQueensland TMR specifications

Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.

Survey conformance and lot release

Observe
Measure the interface footprint by lane and lift and reconcile excluded or already treated areas.
Compare
Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
Verify and hand over
Release the interface directly to paving and protect it from traffic contamination.
Resolve exceptions
Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.