Plant and crew
Sprayer, sweeper and traffic crew. Match the application width to the paving run and plant access.
Estimate in m² of interface.
Inspect and clean the existing or intermediate surface, apply the approved tack and release the interface in the specified condition.
Sprayer, sweeper and traffic crew. Match the application width to the paving run and plant access.
Measure each treated interface separately. Distinguish residual binder and emulsion quantities when deriving litres.
Release the interface directly to paving and protect it from traffic contamination.
Where the asphalt supply-and-lay item already includes tack, allocate the resource within that item once.
Incoming release · Asphalt base and intermediate lifts
Feeds · Asphalt wearing course
Incoming release · Local pavement repairs and tie-ins
Feeds · Asphalt wearing course
Use a contractor programme, trial or shift record for this package. Record the quantity accepted, crew configuration, productive hours and delays.
Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.
Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.