Onshore wind

Wind turbine tower-section erection

Onshore wind
  1. Crawler craneSetup, relocation and workable lifting windows govern the programme.
  2. Tower sectionTrack each component and connection release.
  3. Crane hardstandVerify access and the released working area before mobilisation.
Illustrative workfront for Wind turbine tower-section erection.

Narrow-track lattice crawler crane

Compare a travelling crawler with dismantle-and-transfer arrangements. Check the proposed configuration against the heaviest component at its actual radius and elevation.

Supplier information to obtain

Request component schedule, engineered lift studies, pad design, road geometry, wind criteria, rigging list and relocation sequence from the lift contractor.

Supporting plant and crew

Main and assist cranes, section transport, rigging and bolting crews. Include crane build, ballast movements, moves between turbines and weather standby.

Liebherr describes a narrow-track travel configuration intended for wind farm assembly. Liebherr LR 1700-1.0W

Construction method

Release the workfront

Release foundation and hardstand, confirm component arrivals and allocate preparation and crane assembly separately.

Execute the work

Rig and upend the tower section, place it, complete the required connection and release the rigging. Identify crew activities that tie up the crane.

Measure and hand over

Record sections accepted by section type. Programme nacelle and blade lifts separately because their geometry and weather windows differ.

Productivity calculator

Use a section class with comparable geometry. Enter the workable hours for that class once. Keep crane travel and turbine-to-turbine moves outside the repeat lift.

Example values demonstrate the arithmetic. Use shift records, supplier programmes or a measured trial for an estimate.

Calculation basis and shift treatment

One spread completes all three stages in sequence. Repeat interval = sum of the three stage times. Productive minutes per shift = rostered hours × 60 − lost minutes. Repeat output = batch quantity × productive minutes ÷ repeat interval. Package minutes = first batch time + (number of batches − 1) × repeat interval. Shift equivalents = package minutes ÷ productive minutes per shift.

Rounded rostered shifts assume work can carry across shift boundaries. Continuous weather windows, indivisible lifts, startup, mobilisation, handovers and shutdowns need separate programme allowances. Count losses once across observed stage times and shift losses.

Productivity evidence

Tower-section erection — sections lifted, aligned & bolted

Low 2 · Typical 3 · High 5   sections/crane-day

The reference counts tower sections per crane-day. Crane relocation, blade lifts and weather treatment can change the comparison.

PRD.WF.008 · Vaultix source S-301/218 · Indicative internal benchmark

Related methodologies

The equipment citation supports the machine function. The method and timing boundaries are estimating assumptions. Record the project source, date, observed quantity, time basis and loss treatment when adopting a rate.

Discipline work packages and survey requirements