Plant and crew
Waler installation crane, tie-rod or anchor crew, specialist testing plant and survey. Select the designed restraint system.
Marine works / Quay wall
Install and inspect the designed restraints, verify the specified proof or preload records, and obtain the engineer’s stage release before deepening the adjacent face.
Waler installation crane, tie-rod or anchor crew, specialist testing plant and survey. Select the designed restraint system.
Count complete bays by restraint type. Estimate drilling or tie installation, testing, acceptance and staged support waits separately.
Use the vessel or subcontractor programme, a trial or a comparable shift record. Retain accepted quantity, operating time, waiting time and spread composition with the adopted rate.
Survey anchor alignment, waler level and wall movements against the stage baseline. Link load-test records to each anchor ID.
Designated engineer issues the permissible dredge stage, footprint and monitoring conditions to the dredge superintendent.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Quay wall piles and interlock closure
Feeds · Backhoe dredging and barge load-out · Toe and scour footprint preparation · Quay coping, retained fill and edge completion
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.