Marine works / Dredging

Backhoe dredging and barge load-out

Backhoe dredger and hopper barge at the dredge face. Illustrative plant spread.
  1. Bucket and cut faceMeasure the accepted in-situ cut against the agreed dredge surfaces.
  2. Backhoe pontoonAllow for repositioning and the workable tide window.
  3. Hopper bargePayload and round-trip time can limit the excavator’s productive rate.
Lot measurement
in-situ m³
Method reference
MAR-DREDGE-001
Construction routes
3

Work sequence and plant spread

Divide the berth pocket into cells, excavate to the approved surface and load the accepted destination fleet. Run progress surveys before moving cells.

Plant and crew

Backhoe dredger, spuds, scows, tugs and hydrographic support. Compare bucket cycle with barge arrival and discharge capacity.

Quantity and productivity

Take bank volume between common surfaces. Model the lower of digging output and bank-equivalent haul capacity. Distinguish payable dredge, agreed overdepth and excess excavation.

RecordActivitySource unitLowTypicalHighSource key
PRD.MAR.015Backhoe dredger, stiff clay / soft rock (in-situ m3)m3/day150040008000S-065

Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.

Survey checks and lot handover

Survey conformance

Survey cell edges, batters and high spots with the nominated coverage. Compare reduced elevations against the released dredge surface.

Release record and receiver

Dredge lead supplies cell diary, progress bathymetry, material class and receiver dockets for the acceptance survey.

Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.

Where this lot fits

Source records

The software behind Vaultix

Measure it in Spark. Price it in Trinity.

Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.