Marine works / Scour protection

Toe and scour footprint preparation

Graded rock armour and its filter around the steel pile interfaces.
  1. Rock armourReconcile placed tonnes with the surveyed layer profile.
  2. Pile interfaceInspect transitions and gaps around the pile group.
  3. Placement spreadRock supply and reach affect the production window.
Lot measurement
m² released bed
Method reference
MAR-SCOUR-001
Construction routes
4

Work sequence and plant spread

Inspect bed condition, prepare the designated footprint and record any local variation in toe or transition geometry.

Plant and crew

Survey launch, grab or backhoe and inspection team. Check access around piles and clearance for the placing vessel.

Quantity and productivity

Measure the prepared polygon; take extra excavation by surveyed volume. Use actual cell preparation time and vessel moves.

Use the vessel or subcontractor programme, a trial or a comparable shift record. Retain accepted quantity, operating time, waiting time and spread composition with the adopted rate.

Survey checks and lot handover

Survey conformance

Observe the toe trench or preparation surface before filter placement. Show pile shadows, edges and coverage gaps for review.

Release record and receiver

Marine works lead releases the toe and base survey to the filter crew with marked exceptions.

Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.