Plant and crew
Tug, workboat, pontoon or jack-up, deck crane, mooring crew and surveyor. Include launch, tow, set-up and demobilisation in the agreed cost items.
Marine works / Common works
Mobilise the nominated fleet to the access area. Establish its working position and confirm deck configuration, interfaces and planned relocations.
Tug, workboat, pontoon or jack-up, deck crane, mooring crew and surveyor. Include launch, tow, set-up and demobilisation in the agreed cost items.
Count discrete primary setups. Time tow, site entry, positioning and release separately from planned weather standby.
Use the vessel or subcontractor programme, a trial or a comparable shift record. Retain accepted quantity, operating time, waiting time and spread composition with the adopted rate.
Check platform position and orientation against marine control and the approved work envelope. Record offsets used by machine guidance.
Marine superintendent issues the vessel readiness record, position check and available working window to the operating crew.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Marine control and berth access
Feeds · Barge cycle and spoil reception readiness · Pile delivery, gate and template set-out
Open this row in the lot worksheetIncoming release · Marine control and berth access
Feeds · Barge cycle and spoil reception readiness · Pile delivery, gate and template set-out
Open this row in the lot worksheetIncoming release · Marine control and berth access
Feeds · Quay wall piles and interlock closure · Barge cycle and spoil reception readiness
Open this row in the lot worksheetIncoming release · Marine control and berth access
Feeds · Trailing suction hopper dredging
Open this row in the lot worksheetIncoming release · Marine control and berth access
Feeds · Cutter suction dredge and hydraulic placement
Open this row in the lot worksheetIncoming release · Marine control and berth access
Feeds · Toe and scour footprint preparation
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.