Plant and crew
Lay barge, lifting frame or placement spread, survey and underwater inspection support. Select method for the specified filter system.
Marine works / Scour protection
Place panels or graded bedding on the accepted base, maintain the designed continuity around piles and inspect laps or layer coverage before concealment.
Lay barge, lifting frame or placement spread, survey and underwater inspection support. Select method for the specified filter system.
Pay net covered area; account for overlaps and waste in supply. For a granular filter use the specified thickness and density to build delivered tonnes.
| Record | Activity | Source unit | Low | Typical | High | Source key |
|---|---|---|---|---|---|---|
| PRD.MAR.030 | Place geotextile filter / bedding | m2/day | 300 | 800 | 1500 | S-065 |
Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.
Verify boundaries, lap or edge positions and discontinuities by georeferenced inspection. Record granular layer surface before armour where accessible.
Inspector releases filter panels or bedding cells with photographs, placement logs and exception closure.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Toe and scour footprint preparation · Scour material qualification and supply
Feeds · Rock armour placement around piles and toes
Open this row in the lot worksheetIncoming release · Toe and scour footprint preparation · Scour material qualification and supply
Feeds · Rock armour placement around piles and toes
Open this row in the lot worksheetIncoming release · Toe and scour footprint preparation · Scour material qualification and supply
Feeds · Rock armour placement around piles and toes
Open this row in the lot worksheetIncoming release · Toe and scour footprint preparation
Feeds · Articulated or grout-filled scour mattresses
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.