Plant and crew
Trailing suction hopper dredger, survey launch and destination monitoring. Use an achieved bank-equivalent load for the nominated sediment.
Marine works / Dredging
Coordinate dredging tracks with berth movements. Load, sail, discharge and return on the approved voyage cycle, tracking each source block and destination.
Trailing suction hopper dredger, survey launch and destination monitoring. Use an achieved bank-equivalent load for the nominated sediment.
Achieved bank m³ per voyage ÷ elapsed voyage hours gives fleet output. Use an hourly or weekly Vaultix band only after matching the operating regime and inclusions.
| Record | Activity | Source unit | Low | Typical | High | Source key |
|---|---|---|---|---|---|---|
| PRD.MAR.014 | TSHD loose sand/silt (in-situ m3) | m3/week | 50000 | 150000 | 400000 | S-065 |
| PRD.MAR.016 | Maintenance dredge silt (in-situ m3), TSHD | m3/hr | 300 | 800 | 1500 | S-065 |
Indicative planning bands. Match material, vessel and scope. Establish the source roster before converting a day, shift or week to productive hours.
Check coverage and residual shoals from an independent closing surface. Reconcile hopper records by material class to the hydrographic volume.
Master and hydrographer issue voyage register, discharge evidence and completed dredge cells for berth-depth review.
Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.
Incoming release · Pre-dredge hydrographic survey · Sediment classification and destination release · Marine spread mobilisation and positioning
Feeds · Dredge acceptance and high-spot closeout
Open this row in the lot worksheetTake quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.