Marine works / Dredging

Sediment classification and destination release

Hydrographic survey launch over the berth survey area.
  1. Positioning mastRecord the positioning and datum checks used for the survey.
  2. Survey launchLine speed, turns and access determine field time.
  3. Survey transducerVerify sensor offsets and corrections before accepting the reduced soundings.
Lot measurement
accepted material zones
Method reference
MAR-DREDGE-001
Construction routes
5

Work sequence and plant spread

Correlate samples with the dredge blocks. Assign each material class to its approved reuse or disposal destination and brief the tracking crew.

Plant and crew

Sampling vessel, coring or grab spread, laboratory and environmental lead. Separate sailing and laboratory turnaround.

Quantity and productivity

Count classified zones. Build effort from accessible stations and repeat samples. Enter analytical turnaround as a release wait.

Use the vessel or subcontractor programme, a trial or a comparable shift record. Retain accepted quantity, operating time, waiting time and spread composition with the adopted rate.

Survey checks and lot handover

Survey conformance

Locate sample stations and depth intervals on the baseline surface. Check certificate and chain-of-custody identifiers against block and destination.

Release record and receiver

Environmental lead issues the block-to-destination schedule, monitoring requirements and applicable approvals before material movement.

Record the berth, cell, bent or panel ID, design revision, applicable tolerance, observation date, datum and verification method. Attach raw evidence, resolved departures and the designated reviewer’s disposition to the same lot.

Where this lot fits