Roads / Earthworks

Bulk cut and haul

Estimate in bank m³.

20-Tonne Hydraulic Excavator
  1. BucketSize and fill factor determine material per cycle.
  2. Boom and stickReach and swing distance affect cycle time.
  3. TracksAllow for repositioning and platform condition.
Plant reference for Bulk cut and haul

Construction method and plant

Classify cut by material and destination. Excavate, load and dispatch against a mass-haul schedule. Separate unsuitable material and spoil.

Plant and crew

Excavator or dozer, trucks, grader and water cart. Match loader passes, truck cycles and receiving capacity.

Measure and release the lot

Quantity take-off

Calculate bank volume from survey surfaces. Reconcile truck payloads using material density or a documented conversion to loose volume.

Handover record

Give the fill crew the released material type and delivery profile. Issue cut-floor levels and disposal dockets.

Split short push, long haul and disposal. A band that includes cut-to-fill may overlap the separate fill spread.

Where this package fits

Productivity references

Reference activitySource unitLowTypicalHighSource
PRD.EW.002
Bulk excavation cut-to-fill (30t excavator + truck fleet)
m3/hr80120160S-061
PRD.EW.003
Cut-to-spoil (excavator load-out, no on-site reuse)
m3/hr (loading limited)90130170S-061
PRD.EW.007
Load & haul - 1 km one-way
m3/hr70110150S-061

Indicative bands. Match the activity, volume basis, lift or depth and time denominator to the lot. For a daily band, establish the original shift basis before converting to productive hours.

Use the contract edition, annexures and inspection plan for measurement and acceptance on a project.

Survey conformance and lot release

Observe
Compare cut surfaces by material zone and common chainage boundaries.
Compare
Identify the lot and asset, issued drawing revision, coordinate and height datum, control mark and observation method. Compare design and as-built values on a common basis using the specified sampling rule, permissible deviation and measurement uncertainty.
Verify and hand over
Give the fill crew the released material type and delivery profile. Issue cut-floor levels and disposal dockets.
Resolve exceptions
Map the affected extent, retain the original observation and record the authorised disposition. Recheck corrected work against the same criterion and link the result to the original lot before release.